Loading...
HomeMy WebLinkAboutTUFF SHED PAPERWORKTUFF SHED' Storage Buildings & Garages 1919 NW 19th St. Suite 301 Fort. Lauderdale, FL 33311 Office 954-728-2452 Fax 954-728-2454 SCANNED BY St. Lucie County FILE COPY CONCEALED THERE ENE�IILITYO �HMENTS ARE THE RESPONSIBILITY OF THE Dear Mr. Britt Reynolds, CONTRACTOR OR RECORD Enclosed you will find the required documentation to submit to the building department for the permit. I have placed labels on all the documents that needs to be completed. Please keep in mind that the jurisdiction requires two sets of the property survey/or site plan. Therefore, please include the two copies. *Documents in Enclosed • Builders Helper (2) • Standard Plans and Product Approvals (2 sets for each shed) o Door o Shingles o Underlayment o Strong Tie o LP Smartside o HVHZ Roofing app *Documents Required 1 EicSE PLANS AND ALL PROPOSED WORK ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS THAT MAY BE NECESSARY IN ORDER TO COMPLY WITH ALL APPLICABLE CODES. • Property Survey (2) o Please keep in mind the shed must be drawn onto the survey with the required setbacks from the rear and side property line. (The zoning department should be able to assist you with the setback information). • Permit Application (Can obtain online or at the municipal) • Property Appraiser/ Folio number If you should have any questions or concerns, please feel free to contact us. Best Regards, Stacey Joseph Permit Tech I A ST. LUCIE COUNTY BU REVIEWED FOR COMP, PLANS AND PERMIT MUST BE KEPI SITE OR NO INSPECTIONS) WILL ffit TUFF SHEDO BUILDER'S HELPER SO #:o:,)Lia\� Sales Consultant: apn CUIX&D Customer Name:, yM&-) A STUDIO MODEL: 4XlD INSTALL DATE: sloe e SIDE A ` n y B OVERHEAD VIEW Base Paint: Plfnm Trim Paint: W Y 111� C Accent Paint(AP):Vy-ce,�r\4 \\'�1� AP Location: /� Shingle:E� t `�ml DripNent Color: SCANNED BY St. Lucie County SIDE C SIDE D Options (List): Customer or responsible individual will be at site at time of delivery?...................................................................... Is site clean and level? (Customer understands a leveling fee will apply if site is more than 4" out of level.) ...................................... Is there 18" clearance around all 4 sides of the building?......................................................................................... Is there clear access to the building site?.................................................................................................................. Is there a 110-volt/20 AMP power outlet within 100'?............................................................................................... Customer understands building permits, fees and all related cost of site readiness are customer's responsibility? Customer has been presented the "What to Expect" document?............................................................................. Customer understands that changes, cancellations or postponement once pre-fab has begun will result in restocking/rescheduling fee?................................................................................................................ Isthis a NO FLOOR option?....................................................................................................................................... Does the Customer plan to insulate this building?.................................................................................................... How close to the build site can we park our vehicle?................................................................................................ Special Instructions: CUSTOMER APPROVAL: Signature: AQ0Q}_LIN T Date: 'ytf ...... YES NO ...... YES NO ...... YES NO ......YES NO ...... YES NO _ ...... YES NO -.... YES NO ..... YES NO ..... YES NO ..... YES NO ... ft.