Loading...
HomeMy WebLinkAboutDUCT SEALING CERTIFICATIONPlanning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 A •�G ��n 772-462-2165 Fax 772-162-6443 \Se� FBC ENERGY CONSERVATION CODE 4�9'n �O 'D Dud Sealing Certification Method O' Prescriptive and Performance O Wig Lot#: (L20 Date: 7 Permit#: Contractor. cc�� Address: Saa' ) DauAcv J (wre Ceti Construction: ❑ Post Construction Test o Rough -in Test Test Conditions: rr�� 11 05 Date: dO Floor Area (ft2): Time: Primary Location of Supply Ductwork Indoor Temperature (F): %� Primary Location of Return Ductwork Outdoor Temperature (F): . qU Total Leaka a Test Outside C�N�rC Dud Leakage: &ITefault ❑ Prop. Leak Free o Proposed 0n = Test Pressure: (Pa) St �uC/Q Baseline Duct Pressure (optional) (Pa) -- Dud Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: sYPass ❑ Fail Installed Pa Total Leakage (dm): Total Leakage per 100 soft �o CFM25 x 100 divided by the CFA = Duct Leakage CFM1100 sgft Testino Comoan ComoanyName: 11U'�420YS Address: TILP 1evrna4+ rwu.,�- I hereby certify that the above Dud Sealing Leakage results demonstrate compliance with 5" Edition FBC Energy Conservation requirements in accordance with Section R403.2.2. Signature: Printed Name: 1X" License/Certificate#: ISL94yJ