HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATEPERMIT #:
PEST
PEST
Planning & Development Services
Building & Code Regulation Division13)
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
S
CERTIFICATECONSTRUCTION SOrIL TREAITE RMENMENT St 4Uo� cNEO
opnty
•: 1§0
CONTRACTOR: EEO -A -BUG TERMITE & PEST CONTROL INC.
LICENSE #: JB175775
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: CR 00)
Percentage of solution: .05%
Date of Treatment: 2018
Footing
1st Treatment
Re -Treat
DriKeway
Treatment
Re -Tr �oa
Other
Y 1s' Treatment
Re -Treat
Chemicals used: DOMINION 2L
Total gallons used: 20
Time of Treatment: I l , D Q
Slab
V Treatment
Re -Treat
Pools
1st Treatment
Re -Treat
xxxxx Perimeter for Final Inspection
PAULCLUGARA JR�Dmrc+n W0.w09 "2;41 wcnea�e �9
Signature of Exterminator ate
Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job
site to be picked up by the inspector at time of each inspection or the scheduled inspection MY fail and a re -inspection
fee charged.
FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistantjobsite posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment
Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of
protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.
Revised 7/24/2014
Planning iia Development Services
Building e UkeeguOatn Division
2300
Fort Pierce, FL 34962
772-462-2172 Fax 772462-6443
CI 0l1CTI(4)
PERMIT #:—b3 JOB ADDRESS:
BUILDER/CONTRACTOR: "�
PEST CONTROL CONTRACTOR: Etl1 T•A-BUO TERMITE&PEST CONTROLINC.
PEST CONTROL LICENSE #1J8176775
-erti
u ter anean termites inhere
sWe, e undersigned, ordan etdescribedhat we have pretreated the above
with the standards of he National Pest Control Association.
sub
Square feet if area treated: 2—t
Percentage of solution:.os°/° —
Date of Treatment:
Footing
Treatment
Re -Treat
Driveway
1st Treatment
Re -Treat
Other
1st Treatment
Re -Treat
Chemicals used: ooMiwoN zL
Total gallons used: Z/
Time of Treatment: ; 30
Slab /
1st Treatment
Re -Treat
Pools
1st Treatment
Re -Treat
Aatpure'm
/Exte2rm�'I�nr
inal Inspection
:Z —1atoDate
must be on the Job
rm
Note: There must be athe inseector at time of each ins ectlon or the scheduled Inspected form for each requIred treatment or re -treatment ti this
wl�fall and a re -Inspection
site to be picked up by p p
fee charged.
FOC104°2.6 Certificate of Pro ctive TYeatment for prevention of termites A weather resistantjobslte posting board
shall be provided to receive duplicate Treatment Certificates as each re ulred protective heaimnt l/ COMPIs. 717e Treatment
providing a copy for the person the permit is Issued to and another co y for the bullding permit
Certificate shall provide the product used, Identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentration and number of gallons used, to establish a veririable record of
protective treatment. !f the soil chemical barrier method for termite prevention 15,used, final exterior treatment shall
be completed prior to final bullding approval
St Lucia County requires for the ffinai inspection for IC®, a Per
�enent �tecker to be p���®d ®n
the electrical panel box cover, Opting aril the treatments and dates of applications-