Loading...
HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATEPERMIT #: PEST PEST Planning & Development Services Building & Code Regulation Division13) 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 S CERTIFICATECONSTRUCTION SOrIL TREAITE RMENMENT St 4Uo� cNEO opnty •: 1§0 CONTRACTOR: EEO -A -BUG TERMITE & PEST CONTROL INC. LICENSE #: JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: CR 00) Percentage of solution: .05% Date of Treatment: 2018 Footing 1st Treatment Re -Treat DriKeway Treatment Re -Tr �oa Other Y 1s' Treatment Re -Treat Chemicals used: DOMINION 2L Total gallons used: 20 Time of Treatment: I l , D Q Slab V Treatment Re -Treat Pools 1st Treatment Re -Treat xxxxx Perimeter for Final Inspection PAULCLUGARA JR�Dmrc+n W0.w09 "2;41 wcnea�e �9 Signature of Exterminator ate Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection MY fail and a re -inspection fee charged. FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistantjobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014 Planning iia Development Services Building e UkeeguOatn Division 2300 Fort Pierce, FL 34962 772-462-2172 Fax 772462-6443 CI 0l1CTI(4) PERMIT #:—b3 JOB ADDRESS: BUILDER/CONTRACTOR: "� PEST CONTROL CONTRACTOR: Etl1 T•A-BUO TERMITE&PEST CONTROLINC. PEST CONTROL LICENSE #1J8176775 -erti u ter anean termites inhere sWe, e undersigned, ordan etdescribedhat we have pretreated the above with the standards of he National Pest Control Association. sub Square feet if area treated: 2—t Percentage of solution:.os°/° — Date of Treatment: Footing Treatment Re -Treat Driveway 1st Treatment Re -Treat Other 1st Treatment Re -Treat Chemicals used: ooMiwoN zL Total gallons used: Z/ Time of Treatment: ; 30 Slab / 1st Treatment Re -Treat Pools 1st Treatment Re -Treat Aatpure'm /Exte2rm�'I�nr inal Inspection :Z —1atoDate must be on the Job rm Note: There must be athe inseector at time of each ins ectlon or the scheduled Inspected form for each requIred treatment or re -treatment ti this wl�fall and a re -Inspection site to be picked up by p p fee charged. FOC104°2.6 Certificate of Pro ctive TYeatment for prevention of termites A weather resistantjobslte posting board shall be provided to receive duplicate Treatment Certificates as each re ulred protective heaimnt l/ COMPIs. 717e Treatment providing a copy for the person the permit is Issued to and another co y for the bullding permit Certificate shall provide the product used, Identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a veririable record of protective treatment. !f the soil chemical barrier method for termite prevention 15,used, final exterior treatment shall be completed prior to final bullding approval St Lucia County requires for the ffinai inspection for IC®, a Per �enent �tecker to be p���®d ®n the electrical panel box cover, Opting aril the treatments and dates of applications-