HomeMy WebLinkAboutGAS PIPING SCHEMATICBOARD OF
COUNTY
COMMISSIONERS
GAS PIPING SCHEMATIC
TANK SIZE: GALS.
APPLICANCE — TYPEISIZE
Ales_
A2
(05'C�—BTU
BTU
A3
BTU
A4
BTU
A5
BTU
A6
BTU
PIPING LENGTH & SIZE
L1_FT
_j_7_INCH DIA.
L2 3
FT.
CINCH DIA.
L2
FT.
_INCH DIA.
L4
FT.
INCH DIA.
L5
FT.
INCH DIA.
L6
FT.
INCH DIA.
L7
FT.
INCH DIA.
LB
FT.
INCH DIA.
L9
FT.
INCH DIA.
L1D
FT.
INCH DIA.
L11
FT.
INCH DIA.
L12
FT.
INCH DIA..
Revised 7/22/14
PLANNING & DEVELOPMENT
SERVICES DEPARTMENT
Building and Code Regulation
Division
q0py
(PIPE SIZE WAS TAKEN FROM
THE 2014 FBCFUEL GAS CODE -
TABLE 402 (_—))
ST. LUCIE COUNTY BUILDING DIVISION
REVIEWED FOR El1MPLIANCE
REVIEWED BY ��f%�L''✓'
DATE. I I - }.I - l
PLANS AND PERMIT MUST BE KEPT ON JOB
.OR NO INSPECTION WILL BE MADE.
Websfte: mm6lucieco a0v
2300 Virginia Avenue - Fort Pierce, FL 34082-5652
Phone (772) 462-1553 FAX (772) 462-1578
o 12 'dq(2
A n v
JS'1'rt�U'It'S P$Wa=
Corrugated stainless steel tubing (CSST) gas piping systems will be bonded
in accordance with Section G2411
NFPA 54.
(310) of the Florida Building Code and
Underground -gas piping will be installed at a minimum depth of 12 inches
below grade in accordance with Section G2415.12 (404.12) of the Florida
Building Code and NFPA 58.
■ Polyethylene pipe will be installed in accordance with 6.11.4 of NFPA 58
and the Florida.Building Code.
Carbon monoxide monitors will be installed prior to inspection and will
meet all code and safety requirements of NFPA 54 and the Florida Building
Code.
This compact two -stage regulator is designed to reduce container
pressure down to 11" w.c. delivery pressure. it is ideal for 'on -site"
cylinder applications, mobile homes and average domestic service
Including small ASME and 100 to 420 pound DOT cylinders.
&�R$&tiYi"9
• Incorporates integral relief valve.
• With 15 PSIG inlet pressure, regulator is designed to not pass more
than 2 PSIG with the seat disc removed.
• Large vent helps prevent blockage and has 'e-W F. NPT for vent
piping.
• Compact size allows for easy Installation — especially under
container hoods and within collars. -
• Vent on the first stage Is consistently in the down position.
• Built in pressure taps on both first and second stage regulators have
pluggedr/e° ENPT outlets. Plugs can be removed with a 3'16° hex
allen wrench. .
• Select brownTiinish.
5
Pn>�
Y. rmr
1'Ae 1
4I`a�ffa
'h
NPr
404PEVent Pipe -away
for first stage venL
-EMMIZE-E-1M-_
_FM----
14 •
�,
MM����1�1
s�EM�iil
4-
r
225,000 375,OOD 525.000 675,000
Body(First Stage) .......................................................... Zinc or Brass
Body (Second Stage) ...................................................
Die Cast Zinc
NozzleOrifice.........................................................................
Brass
Spring.......................................................................................
Steel
Valve Seat Disc ... ...... ................................
:............ Resilient Rubber
Diaphragm ........................
Integrated Fabric and Synthetic Rubber
V�
uslrm
LV40M LV404B4V9 MOM
W
°F. NPT
""'
F. NPTckOet
F. NPT11•
3�ts°
wc.atlo0
PSIG Inlet
9' -13° w.c.
lo'clock
ck
525,000
19."clack
t
Y2' F. NPTF.
Vet
POLktlet
W F. NPT
_
k
MMMM.ft0w is bash on 25 PSIG INet pressure eM 9•w.c delivery pressure
404PE
AM 100 RegO Dr. P.O. Box 247 Elon. NC 27244 USA www.regepmduds-woo Phone (336) 449-7707 Fax (336) 449.6594 MKIM.
0. ci
d �
5 @7
li
3
N
0
E
C
u
H
O O O O O
O O O O
O O O O O
b N O
a M b N O
m h N a0
'y
q
pS vS Vl
oo t
v': N O
OS o0 0o h t�
�O SD SD of vl
Vl Vl vy vl �T
ao N I' ?
O rl
O a
cn
�
�o�oab �-.
Nv�iObT
-cMmm
N
"i
cOnhbam
oaawm
hbb vim
tN�1MNNN
NN�� N
''�i
I
e
Q
Navi m...
Vl
Vl
O O 00 N
b m F ti
00
00 Vl N Vl v'1
'
Vl N yyQ� b
h b OO O V
00 N F M O�
b b V
n
n
Q
O M CS � Vl
N 00 �
V1 00 Y1
00 b R N
O OS OD OG F
ti�
�.y
�y
�1
N
ooN OS oOh
bb ul vyh
�'t �tM mm
NNttVV NN
N
...
a
R
O
h OVO1 O h
h M N N�
� EO O� N N
� ap m o b
M O� h V1
vy
N O OS
�
��'
�
�
V mN NT
hb�tim
OOS O�oo
hbbbvi
vy V V V
V �� m
C
C
�
Cab Nvi op
vy �.h Ou'y
?bO�'1O
Na0 v1NO
oob V MN
OO. aoh
w
n
n
b
m N W P M
N� O O OS
o0 F h b vl
Yt V' 7 V R
m m m M �+1
M m N N N
O
O
C
n
U
VS
n
W _ V GS
�D t� V
�n
oo O F m
o 0o b '•T m
N O C� 00
00 � � �D SD
n
F
b
N
m O h
hbbv'i
?� V M M
M N N N N
NNN
O
O
`�
QQ d Q
`/.
T
^
h
a
ab vt stM
m MMNN
N NN-+ti
.�
�-+%. %.
Z %. %. %.
C
C
y5
vv��
z
QQQQGQ
Q QQG
zzZ z
Q QEQQ
z z z Z
0
o
z z-.
z z z z'z
z
z
O
N O vS
O vy pp vy O
v1 O vy O v1
O vt O Vt O
a
C
pq
®®
.hn N N
m m V h
�'1 b b F h
a0 00 OS OS O
C
i
O
C
C
O
W/
1/8" GALV. CABLE
(2)HDG CLAIdP5 T(
ANCHOR (PULLED
TIGHT)
ABOVEGROUND HORIZONTAL TANK HOLD DOWN DETAIL
GENERAL NOTES:
RER TO ACHIEVE STATED LOAD CAPACItt. CAPACITY VARIES WITH SOIL TYPE VERIFY ANCHOR CAPACITY WITH
1. HELICAL. ANCHORS SHALL :HAVE AN ALLOWABLE PULL—OUT CAPACITY AS SHOWN BELOW. ANCHORS SHALL BE INSTALLED PER
ANCHOR iAAN.1?E9 - "
S ILA �,.E4� OU �0.
PAGE LDA
1 0�1
R'$UNDE(TGROF'J,1D UTILITIES PRIOR TO ANCHOR INSTALV+TION
OF TANK"-',J2t�tA1`1`/E TO ADJACEM STRUCTURES AND FEATURES ARE DkPENDEM UPON LOCAL CODES AND IS T
HE
OF OANESS. m. VOVEMENT OURING THE BASE
AS SHOWN BEEN DESIGNED TO PREVENT FLOTATION. COLLAPSE.
IATERAL
OF
1 µ.
ESl gyro ` 1TERIA C{ 0.6 ® CGP�RIg77 2G16 — FARLEY ENGINEERING. Uc
GC N/A:
Consulting Engineer R40111 — CA28108
880D N. U.S• 01. Suite 02 . Sebn(�nj Flor Y96 t295B'