HomeMy WebLinkAboutDUCT SEALING CERTIFICATIONPlanning & Development Services
Building 8 Cade Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982 o y�
772-462-2165 Fax 772-462-6443 P4ii rj
: 4
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
°��y°jot
Prescriptive and Performance Method
� Crw � 495
Dale:
Pe mit #:trI Lot P.
Contractor. K im j4tl
eE Address: Samoa boe.VIA tP Cit!
Construction: o Post Construction Test ❑ Rough -in Test SCANNED
Ry
Test Conditions:
S, LUCie
Date:
Floor Area (ft2): 33'
Time:
Primary Location of Supply Ductwork
Indoor Temperature (F):
Outdoor Temperature (F):
Primary Location of Return Ductwork L
. �)
Total Leaka eTest Outside
Dud Leakage: efault
❑ Prop. Leak Free ❑ Proposed On =
Test Pressure:
(Pa)
Baseline Duct Pressure (optional)
(Pa)
Dud Press. (Pa)
Flow Ring
Fan Press
Flow (dm)
Results: m4rass o Fail
Installed
Pa
Total Leakage (cfm):
C-73
ji%'
Total Leakage per 100 sgft
CFM25 x 100 divided by the CFA = Dud Leakage CFM1100 sgft
Testine Company 'j� //��
Company Name: 1S�Li4tktNuws Address: -ra rnin2++JLY�+� ,' 1.
I hereby certify th t the above D ealing Leakage results demonstrate compliance with 5� Edition FBC Energy Conservation requirements in accordance with
Section R403.2
Signature:
Printed Name: 40 Ot/CV LicenselCertificate M