HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASEA
REQUEST FOR 30 DAY TEMPORARY POWER. RELEASE
DATE: n ST. LUCIE COUNTY BLDG. & ZONING
t ' 2/ � 2300 VIRGINIA AVE
FORT PIERCE, FL 34952-5652
PE NUMBER: Ph. (561) 462-2165
FAX (561) 462-1148
PROPERTY ADDRESS:
�'Sj -r-6IA
SCANNED
.By
St. Lucie County � O Lf-" u
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO
4—HE ABOVE DESCRIBED -PROPERTY; FORA -PERIOD NOT TO EXCEED T1HHtTY(30) -- _
DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN
PREPARATION FOR FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF
THE REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS:
1. This temporary power release in requested for the above stated purpose only,
and there will be no occupancy of any type, other than that permitted by
construction during this time period.
2. As witness by our signatures, we hereby agree to abide by all terms and
conditions of this agreement, including Building Division Policy, which is
incorporated herein by reference.
3. All conditions and requirements listed in the attached document entitled
"Requirements for 30 Day Power for Testing" have been, fulfilled and the
premises is ready for compliance inspection.
WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY,
AND THEIR EMPLOYEES FROM ALL LIABILITIES AND CLAIMS OF ANY TYPE OF
NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT OF THIS
TRANSACTION, INCLUDING ANY DAMAGES WHICH MAY BE INCURRED DUE TO
THE DISCONNECTION OFELECTRICALPOWERINTHE EVENT OF�IOLATION OF
THIS AGREEMENT. A // n
OCT-31-2006 14:20 FR0M:L0I1R0h1 BLDR 7723365845 TO:4626443 P:3/4
REQUEST FOR 30 DAY TEMPORARY POWER RELEASE
DATE:; 31 Zt7D J.
PE NUMBER:
PROPERTY ADDRESS:
gr,o� S -r-
ST. LUCIE COUNTY BLDG. & ZONING
2300 VIRGINIA AVE
FORT PIERCE, FL 34952-5652
IS"VAX (561)4G2-1I48
SCANNED BY E411L
1 2006
St. Lucie County
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO
THE ABOVE DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30)
DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN
PREPARATION FOR FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF
THE REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS:
1. This temporary power release in requested for the above stated purpose only,
and there will be no occupancy of any type, other than that permitted by
construction during this time period.
2. As witness by our signatures, we hereby agree to abide by all terms and
conditions of this agreement, including Building Division Policy, which is
incorporated herein by reference.
3. All conditions and requirements listed in the attached document entitled
"Requirements for 30 Day Power for Testing" have been„fulfilled and the
premises is ready for compliance inspection.
WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY,
AND IBM EMPLOYEES FROM ALL LIABILITIES AND CLAIMS OF ANY TYPE OF
NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT OF THIS
TRANSACTION, INCLUDING ANY DAMAGES WHICH MAY BE INCURRF,D DUE TO
THE DISCONNECTION OF ELECTMCALFOWERIN THE EVENT OFJpIOLATION OF
THIS AGREEMENT. _ A A
CONTRACTOR SIGNATURE