Loading...
HomeMy WebLinkAboutBUILDING PERMIT CHECKLISTBOARD OF PLANNING S DEVELOPMENT SERVICES DEPARTMENT COUNTY COMMISSIONERS F LORIs Building & Code Regulation CHECKLIST FOR RESIDENTIAL/COMMERCIAL BUILDING PERNHT Date: (ZIZI I �$ Permit Number: \4Nd-4ysq SCANNED LD2 6 2018 BY Required Documents: St. Lucie County unt P_?�mi in9 Application completely filled out with Notarized Signatures ............................ Yes%(' No _ N/A_ Sub Agreements with Notarized Signatures (prior to issuance) .......................... Yes_ No)-6 N/A Owner / Builder Affidavit (signed in office) .............:................................... Yes_ No _ N/A—X, Filled Land Affidavit (prior to issuance) ........................... I. ..........................Yes_k No N/A_ Recorded Wan -any Deed, if applicable.............................................:......... Yes_ No � N/A_ Recorded Notice of Commencemement (prior to issuance or inspection) ............... Yes_ No, N/A Utility Agreement or Payment Receipt (prior to issuance) ................................. Yes_ No N/A_ Vegetation Removal Application with copy of survey ..................................... Yes{ No _ N/A Plans. Calculations & Attachments (3 copies commercial, 2 copies residential). Complete set of plans with Engineer / Architect Raised Seal ........................... Ye No _ N/A Truss Plans reviewed and approved by Engineer / Architect ............................. Yes %X No _ N/A_ Landscaping and Parking plan (under 6,000 sgft)......................................... Yes_ No — N/A Approved Site Plans ..................... :..................................................... : Yes No ! N/A Sealed Survey with Dimensions, Finished floor ....................:...................... Yes_ No X N/A_ Elevations and Setbacks ........ :...................................................... Yes,�e No N/A_ Plot plan with Setbacks............................................................... Yes x No _ N/A_ Health Department approval stamped on survey and floor plan ......................... YesX No N/A_ Health Department Food Establishment Permit stamped. on floor plan ................ Yes. No _ N/A4 Manual ' J" or Manual "N" Calculations .... :......................... ..................... Yes No _ N/A — Signed Energy Calculations 0 orinsigate)....................................... YeNo _ N/A I Sealed Wind Load Compliance Certification ..................:.......:.................... Yes No_ N/A i Product Review Affidavit...................................................................... Yes No N/A_ Other: Health Department Permit Paperwork....................................................... Yes�' No _ N/A_ CD for Fire Department if commercial or multi -family .................................... Yes_ No _ N/A DEP, SFWMD or Army Corp of Engineers (dock, seawall, SF on beach)............ Yes_ No N/A _ Pool Barrier Affidavit.....................................:.................................... Yes No _ N/A_ Ground Sign Landscape Affidavit (signs)................................................... Yes_ No _ N/A_ Burn Rate for Sign Cabinets ............................... ..................... I............. Yes No N/A_ RV and Mobile Home Tie -Down Only (2 copies) Permit Worksheet (Tie -Down Diagram) .................................................... Yes_ No _ N/A Manufacture Set -Up and Installation Manual ............................................:.. Yes_ No _ N/A Manufacture Blocking Documents.......................................................... Yes No N/A Signed Penetrometer Test (1 copy)......................................................... Yes No N/A Stair Details...................:................................................................ Yes No N/A Mobile Home Inspection Report for Relocation (used only) ........................... Yes_ No N/A _ Copy of Title for Relocation (used only) ..................................................: Yes_ No _ N/A Private Property not in a mobile home park Class "A" Approval from Planning or file # ........ :............ ........................... Yes_ No — N/A_ COMMENTS Revised 7/27/18