HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATEFrom fax5616880909 1.161.688.0909 Thu Nov 7 06:56:24 2019 MST Page 1 of 2
I
PERMIT.
#
St Lucie County. Inspections
2300 Virginia Avenue
Ft Pierce, FL 3498.2
(722) 462-2172
CERTIFICATE OF TERMITE TREATMENT
CONS'rPUC'I'ION SOIL TREATMENT
SC NNE®
St LuBY
cie Coup
ty
ISa— QEQ� JOB ADDRESS 2654 Conifer Dr Fort Pieree, FL 34951-2940
BUILDER GHO Homes
PEST CONTROL CONTRACTOR HomeTeam Pest Defense, Inc.
PEST CONTROL LICENSE # JF0001886
We, the undersigned, hereby certify that the have pretreated the above -described construction for subterranean
termites in accordance with the standards of the National Pest Control Association.
Square feet of area treated: 250
Percentage of solution:.50%
Date of treatment: 11/04/19
® Footing
® 1 st Treatment
❑ Re -treat
❑ Slab
❑ Ist•Treatment
❑ Re -treat
0 Driveway
❑ I st Treatment
❑ Re -heat
❑ Pools
0 1 st Treatment
❑ Re -treat.
❑ Other
❑ I st Treatment
❑ Re -treat.
Chemicals used: Sentricon Always Active HD
Total gallons used:.50%
Time of treatment: AM
FBC104.2.6 Certificate ofProtcetive Treatment for prevention of termites.
A weather resistant jobsite posling board shall be provided to receive
duplicate Treatment Certificates as each 'required protective treatment is
completed, providinga copl' for the person the poennit is iisued to and
another co/ry for the building permit file.,•. "%'he Treauneut Certfreate steal!
provide lheproduct axed, iilen[ity o/dte upplicutar•, lime and dale q(the
treatment, site location, area treated, chemical used, percent concentration
and number ofgallotu used, to establish a verifiable record ofprotective
treatment. l/ the soil chemical barrier tnethod for termite prevention is used,
final exterior treatment shall be completed prior to final building approval,
St Lucie County requires for the final inspection for CO., a Permanent
Sticker to be placed on the electrical panel box cover, listing all the
treatments and dates of applications.
Z Perimeter for Final Inspection
Signature of exterminator
NOTE: There mast be a completed form for each required ireatatent or re -treatment and this form inust fie on the
job site to be picked up by the inspector at time of each inspection or the scheduled inspection willfail and a
re -inspection fee charged.