Loading...
HomeMy WebLinkAboutLETTER FROM QUEENS COVE PROPERY OWNERS ASSOCIATIONQUEENS COVE PROPERTY OWNERS ASSN., INC. Property Location: Lott Bloc�kL� I�Unit ,,�I 1. �_,I pG Architect UII ��-rie1� U4+s IiDI -41j D 4 POd L0eAAd-\ Phone 1�-9I�1 '9,R�/6I/O, Contractor �Ji�(1 f112I�If1S I t li l(i-P- License# 91 air] —Phone -j—jQ.Lj4q,� 0q0 n(, /� �� (This Is A R,gq�ired Re Address Permits: Fss— Rome Construction (Includes pool fences, landscaping, etc.) Bulkheads, Docks Hoist & Pilings Post -Construction AdditionsLlmorovements (Includes, fences, driveways, pools, roofs, etc. New or repair) Queens Cove Documents $1300.00* N/C N/C $ 15.00 Documents Required -- -- RECEIVEn # 1,2,3, & 5 AUG 0 S 2019 #3,4,&6 Sf. Lucie County, Perm # 1 & 2 (pool only SCANNED BY St. Lucie County 1. Plot plan showing location, size, setbacks, & elevation. (For roof repair, specifications only). 2. Complete set of plans and specifications, including pool and enclosure, fencing, landscaping and drainage for surface water, swales, eta 3. Survey. 4. Dock or bulkhead drawings. 5. An "as built", survey or final plot plan, AFTER construction. 6. All required governmental permits (County, DEP, & Army Corps of Engineers — if required) NOTES a. * $100.00 is refunded upon submission of document # 5. b. A $ 741.00 credit is due for new water hookup from St. Lucie County Utilities. C. Property owners will be held responsible for any damage to the common properties of Queens Cove as a result of the above construction (whether caused by the owner, contractor or sub -contractor). d. Owners and contractors will also be responsible for ensuring all suppliers and workers comply with our speed limit (25 mph) and refrain from Uttering. Disregard of these requirements could result in the contractor or person(s) being barred from Queens Cove. e. All new construction shall conform to the required quality of workmanship and materials and be in harmony with the external design of existing structures. f. New construction will not be permitted without existing or simultaneously -constructed bulkheading. Effective 7/1/08 (Obsolete Previous Editions)