HomeMy WebLinkAboutBUILDING PERMIT CHECK LISTPLANNING & DEVELOPMENT
SERVICES DEPARTMENT
CHECKLIST FOR RESIDENTIAL/COMMERCIAL BUILDING PERMIT
JAN 0 S 2019
LUCIe County, Permitting
Luc a County
Reguired Documents:
Application completely filled out with Notarized Signatures ............................ Yes V . No —N/A —
Sub Sub Agreements with Notarized Signatures (prior to issuance) .......................... Yes_No _ N/A7
Owner / Builder Affidavit (signed in office) ................................................. Yes_No_ N/A_ /
Filled Land Affidavit (prior to issuance) ................................................... Yes ✓ No _ N/A_
Recorded Warranty Deed, if applicable......................................................Yes_No _ N/A V//
Recorded Notice of Commencement (prior to issuance or inspection) ................. Yes No N/A_
Utility Agreement or Payment Receipt (prior to issuance).................................Yes_No _ N/AZ
Vegetation Removal Application with copy of survey.....................................Yes -No _ N/A
Plans. Calculations & Attachments ( 3 copies commercial, 2 copies residential) /
Complete set of plans with Engineer / Architect Raised Seal ........................... Yes v NoN/A_
Truss Plans reviewed and approved by Engineer / Architect ............................ Yes —No —N/A
Landscaping and Parking plan (under 6,000 sgft)......................................... Yes —No _ N/A ✓/
Approved Site Plans........................................................................... Yes_No_N/A v
Sealed Survey with Dimensions, Finished floor ........................................... YesZNON/A
Elevations and Setbacks.............................................................. YesfNo
o_N/APlot plan with Setbacks............................................................... Yes — N/A
Health Department approval stamped on survey and floor plan ........................
Manual' P' or Manual' N" Calculations.................................................... Yes —No
Signed Energy Calculations (1 set original signatures & signed in 2 spots)........... .
Sealed Wind Load Compliance Certification ............................................... Y
Product Review Affidavit...................................................................... Y
Excavating a pond for fill:
Site plan showing 25-foot(minimum) set back from all property boundaries,,size, Yes_ No_
shape, location and quantities of proposed excavation and fill areas
Side slopes not to exceed 4 to 1 to a minimum of 3 feet below water level......... Yes_ No_
Depth of excavation does not exceed 12 feet in depth .................................... Yes —No —
If Hauling fill off site (excess of 100 cubic yards) you must have a mining permit Yes —No —
Other:
Health Department Permit Paperwork.......................................................
CD for Fire Department if commercial or multi -family ...................................
DEP, SFWMD or Army Corp of Engineers (dock, seawall, SF on beach)............
Pool Barrier Affidavit..........................................................................
Ground Sign Landscape Affidavit (signs) ................................................... Yes —No _
Burn Rate for Sign Cabinets..................................................................
E
RV and Mobile Home Tie -Down Only (2 copies)
Permit Worksheet (Tie -Down Diagram) ...................................................
Manufacture Set -Up and Installation Manual ..............................................
Manufacture Blocking Documents..........................................................
Signed Penetrometer Test (1 copy).........................................................
StairDetails....................................................................................
Mobile Home Inspection Report for Relocation (used only) ...........................
Copy of Title for Relocation (used only) ...................................................
Private Property not in a mobile home park
Class " A" Approval from Planning or file # ................................................
COMMENTS
Revised 10/15/18