Loading...
HomeMy WebLinkAboutDUCT SEALING CERTIFICATIONPlanning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772-462-2165 Fax 772462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and-Redannance Method Date: ✓5. 25 • / P it #: Contractor. aYY.a Construction: gllosl construction Test o Rough -in 4 0 0 vo o m � tS' c'Aj Fv st 4uCie count Let#: 43 Test Conditiohs: Date: Floor Area (ft2): �4�Z Time: L - Primary Location of Supply Ductwork Indoor Temperature (F): -7i Primary Location of Return Ductwork Outdoor Temperature(F): Total Leakage Test (Outside) Dud Leakage: o Def ❑Prop. Leak Free Mroposed On = 0 + 0 Test Pressure: (Pa) Baseline Duct Pressure (optional) (Pa) Duct Press. (Pa) Flow Ring Fan Press Flow (dm) Results: iWass ❑ Fail Installed Pa I � Total Leakage (cim): Total Leakage per 100 sgft O CFM25 x 100 divided by the CFA = Dud Leakage CFM1100 sgfL Testing Comoany Company Name: 4CL r s Address: 1 "i LC `a e n n e 'I+ 'Dr-. I hereby certify that the above Duct eating Leakage results demonstrate compliance with 5'th Edition FBC Energy Conservation requirements In accordance with Section R403.2. Signature: Printed Name: IktAean Oved-+a le Licensecertficate#: �� fJAiB7 Planning & Development Services 4 3 P Building & Code Regulation Division r < m 2300 Virginia Ave, Rm 201 rr i5 a Fort Pierce, FL 34982 a a a 772-462-2165 Fax 772-462-6443 o m o a � FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method Date: J'�3 I Permit#: t I.Bj-Ob70 Lot#: 044 Contractor. J Address: Construction: "osl Construction Test ❑ Rough -in Test Test Conditions: Date: 5-.Z 3 • f Q Floor Area (ft2): TZ Z Time: Primary Location of Supply Ductwork «- Indoor Temperature (F): Primary Location of Return Ductwork AW �- Outdoor Temperature (F): .Sly - Total Leakane Test (Outside) O o3 Dud Leakage: ❑ DD fault ❑ Prop. Leak Free Wroposed On = Test Pressure: Z (Pa) Baseline Duct Pressure (optional) (Pa) Dud Press. (Pa) Flow Ring Fan Press Flow (dm) Results: >Pass ❑ Fail Installed Pa SSA 2 Total Leakage (chn): Total Leakage per 100 sgft O.O .Z CFM25 x 100 divided by the CFA = Dud Leakage CFMI100 sgfL Testing Company Company Name: IS 1 �, �/ %C Vt'6Lr" S Address: Z74 7Ck• I hereby certify that the a"eating Leakage results demonstrate compliance with 5" Edition FBC Energy Conservation requirements in accordance with Section R403.2.21 ` Signature: n Printed Name: �bRa"� �R J% LicensefCertificale#: Qr—AJ 37 Certificate of Achievement THIS ACKNOWLEDGES THAT Aaron Overholt HAS MET THE STANDARD REQUIRED BY RESNET, AS A CERTIFIED RATING FIELD INSPECTOR Certification Date: 08/07/2018 Certification Expires: 08/07/2021 RFI # 2GNAB7 �2 Tim Smith, RESNET Quality Assurance Designee '? 15 lightyears RESNET QA Provider # (1998-199)