HomeMy WebLinkAboutDUCT SEALING CERTIFICATIONPlanning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772-462-2165 Fax 772462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and-Redannance Method
Date: ✓5. 25 • / P it #:
Contractor. aYY.a
Construction: gllosl construction Test o Rough -in
4
0 0 vo o
m �
tS'
c'Aj Fv
st 4uCie count
Let#: 43
Test Conditiohs:
Date: Floor Area (ft2): �4�Z
Time: L - Primary Location of Supply Ductwork
Indoor Temperature (F): -7i Primary Location of Return Ductwork
Outdoor Temperature(F):
Total Leakage Test (Outside)
Dud Leakage: o Def ❑Prop. Leak Free Mroposed On = 0 + 0
Test Pressure: (Pa)
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (dm) Results: iWass ❑ Fail
Installed Pa I
� Total Leakage (cim):
Total Leakage per 100 sgft O
CFM25 x 100 divided by the CFA = Dud Leakage CFM1100 sgfL
Testing Comoany
Company Name: 4CL r s Address: 1 "i LC `a e n n e 'I+ 'Dr-.
I hereby certify that the above Duct eating Leakage results demonstrate compliance with 5'th Edition FBC Energy Conservation requirements In accordance with
Section R403.2.
Signature:
Printed Name: IktAean Oved-+a le Licensecertficate#: �� fJAiB7
Planning & Development Services
4
3 P
Building & Code Regulation Division
r < m
2300 Virginia Ave, Rm 201
rr i5 a
Fort Pierce, FL 34982
a a a
772-462-2165 Fax 772-462-6443
o m o
a
�
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
Date: J'�3 I Permit#: t I.Bj-Ob70 Lot#: 044
Contractor.
J Address:
Construction: "osl Construction Test ❑ Rough -in Test
Test Conditions:
Date: 5-.Z 3 • f Q Floor Area (ft2): TZ Z
Time: Primary Location of Supply Ductwork «-
Indoor Temperature (F): Primary Location of Return Ductwork AW �-
Outdoor Temperature (F): .Sly -
Total Leakane Test (Outside) O o3
Dud Leakage: ❑ DD fault ❑ Prop. Leak Free Wroposed On =
Test Pressure: Z (Pa)
Baseline Duct Pressure (optional) (Pa)
Dud Press. (Pa) Flow Ring Fan Press Flow (dm) Results: >Pass ❑ Fail
Installed Pa SSA
2 Total Leakage (chn):
Total Leakage per 100 sgft O.O .Z
CFM25 x 100 divided by the CFA = Dud Leakage CFMI100 sgfL
Testing Company
Company Name:
IS
1 �,
�/
%C Vt'6Lr" S
Address: Z74 7Ck•
I hereby certify that the a"eating Leakage results demonstrate compliance with 5" Edition FBC Energy Conservation requirements in accordance with
Section R403.2.21 `
Signature: n
Printed Name: �bRa"� �R J% LicensefCertificale#: Qr—AJ 37
Certificate of Achievement
THIS ACKNOWLEDGES THAT
Aaron Overholt
HAS MET THE STANDARD REQUIRED BY RESNET, AS A
CERTIFIED RATING FIELD INSPECTOR
Certification Date: 08/07/2018
Certification Expires: 08/07/2021
RFI # 2GNAB7
�2
Tim Smith,
RESNET Quality Assurance Designee
'? 15 lightyears
RESNET QA Provider # (1998-199)