Loading...
HomeMy WebLinkAboutREVISION - BUILDING PERMITOFFICE USE ONLY: DATE FILED: REVISION FEE: 1. 2. 3. 4. 5. FILE COPY 0 PERMIT# 1901-0070 cue RECEIPT # ��q y1. PLANNING & DEVELOPMENT SERVICES BUILDING & CODE REGULATION DIVISION 2300 VIRGINIA AVENUE FORT PIERCE, FL 34982-5652 (772) 462-1553 FAX (772) 462-1578 APPLICATION FOR BUILDING PERMIT REVISIONS PROJECT INFORMATION SCANNED LOCATIOBY ADDRESS: SITE 5286 Oakland Lake Cir. (lot24) St. Lucie CoUI DETAILED DESCRIPTION OF PROJECT REVISIONS: Revision to trusses. CONTRACTOR INFORMATION: STATE of FL REG./CERT. #: CRC057817 ST�r�UnTy CERT. #: BUSINESS NAME: YAT_N S QUALIFIERS NAMEb CENT ADDRESS: 114455 CITY: STATE: ZIP: PHONE (DAYTIME): FAX: 5 -72 -1341 OWNER/BUILDER INFORMATION: NAME: ADDRESS: CITY: PHONE: NVR, INC. dba RYAN HOMES �4LYIT(pEl\YIIN717_\7K :IL►VL)f i I h J4 ' • 1 I. ARCHITECT/ENGINEER INFORMATION: NAME: AB DESIGN GROUP INC. ADDRESS: CITY: PHONE (DAYTIME): Revised 0722/2014 STATE: ZIP: 32750 FAX: 407-774-407R Fj 5.00 V2 517 = 2x4 II 5x7 = Dead Load Den.= 3116 in 11 N 2x4 II 3x6 = 3x8 = 5x5 = 316 = 2x6 II 3x4 = 0{ir0 7-7-12 I 15-0-0 I 22.4-0 I 29-8-0 I 37-04 41-2-0 64-0 7�-12 744 74-0 74-0 744 4-1-12 Plate Otsets (X,Y)— N:0-S4.Edge1. (5:0-5A.0-2-12l. A:0-5-4.0-2.81. 112:0-2-8.0-3-41 LOADING(psf) SPACING- 2-0-0 CSI. DEFL. in poc) Well Lld PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.88 Veri(LL) 0.19 13-15 >999 240 MT20 2441190 TCDL 7.0 Lumber DOL 1.25 BC .0.79 Vert(CT) -0.36 13-15 >999 180 BCLL 0.0 Rep Stress Ina YES WB 0.67 Horz(CT) 0.13 10 We n1a BCDL 10.0 Code FBC2017rrP12014 MatrixS Weight:2341b FT=20% LUMBER - TOP CHORD 2x4 SP M 31 'Except' T3,T4: 2x4 SP No2 BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 SLIDER Let 2x6 SP No.23-11-2 REACTIONS. (size) 1=0-8-0 (min. 0.1-13), 10=0.8-0 (min. 0-1-13) Max Horz1=183(LC 8) Max Uplift=474(LC 8), 10=476(LC 4) Max Gmvt=1518(LC 1), 10=1518(LC 1) BRACING - TOP CHORD Structural wood sheathing directly applied, except end verticals. BOT CHORD Rigid ceiling directly applied or 6-2-12 oc bracing. WEBS 1 Row at midpt 3-15 FORCES. Qb) - Max Camp./Max. Ten. -All forces 250 (lb) or less except when shaven. TOP CHORD 1.2=3012N15, 2.3=29231936, 34=2440/845, 4-5=2425/869, 5-0=23531939, 6-7=2353/939, 7-8=2134f767, 8-9=1736/565, 9-10=1488/485 BOTCHORD 1-16=889/2646, 15-16=88912646, 14-15=675W91, 13-14=-675/2191,12-13=576/1895, 11-12--49711582 WEBS 3-16=01310, 3-15=529/363, 5-15=881456, 5.13=-132/395, 6.13=4421334, 7-13=26lf729, 8-12-94I465, 8-11=-652/311, 9-11=550/1749 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vutl=160mph (3-second gust) Vasd=124mph; TCDL=4.2psf; BCOL=5.Opsf; h=15f; CaL II; Exp C; Encl., GCpi=0.18; 10=476. LOAD CASE(S) Standard nonconcument with any other live loads. (JREVIEWED ❑ REVIEWED ASNOTED REVISE & RESUBMIT ❑ REJECTED/ RESUBMIT U NOT REVIEWED ❑ FOR YOUR INFORMATION Submittals are reviewed for conformance with design intent and grieral comph�nce with the Contract Documents only. Notations Do Not Authorize Changes to Contract Sum. Reviews, Comments and/or corrections does not relieve the Contractor from compliance with the Contract Documents. The Contractor is responsible for confirming and correlating all Quantities, dimensions, tolerances, clearances, fabrication processes, techniques and sequences of construction, compatibility of materials and materials coordination of their work with otter trades and subcontractors, performance of work in a salt eat satisfactory manner aad for full compliance with the Cabsot Documents../ except 0=11h)1=474, 0 i �\ 1 N/' OF r �,— iAv LOR�O��\�� /// �FSSIONA \��\ REVIEWED BY IGN GROUP Dead Load De&=114 in 5.00 r2 5x7 = 2x4 It 50 = 6x6 11 - 11 10 lJ 3x4 — 3x6 = 3x8 = 30 = are = 3x4 = 5x4 = 3x4 = Or1r0 8b0 0.^4-0 BdO 7I 224I 4-21-0 8524-0 8.3--5 Plate Offsets (X Y)— rl:044 0-05] I6:0-5-4 0-2-8] 18:0.5-4 0.2A1 112:0.2-00.2-12) LOADING(psf) SPACING- 2-04 C51. DEFL. in Qoc) Ildefl Ud PLATES GRIP TCLL 20.0 Plate Gdp DOL 125 TC 0.48 Vert(LL) -0.18 17-19 >999 240 MT20 2441190 TCDL 7.6 Lumber DOL 1.25 BC 0.95 Vert(CT) -0.40 17-19 >999 180 BCLL 0.0 Rep Stress Ina YES WB 0.68 Hom(CT) 0.14 12 We We BCDL 10.0 Code FBC20171TP12014 MatdxS Weight2491b F17=20% LUMBER- BRACING - TOP CHORD 2x4 SP N0.2 *Except' TOP CHORD T1: 2x4 SP M 31 GOT CHORD 2x4 SP No.2 BOT CHORD WEBS 2x4 SP No.3 WEBS SLIDER Left 2x6 SP No.23-0-9 REACTIONS. (size) 1=0-e-0 (min. 0.1-13), 12=0-e-0 (min. 0.1-13) Max Hou 1=198(LC 8) Max Upli81=493(LC 8),12=456(LC 9) Max Grav1=1518(LC 1), 12=1518(LC 1) Structural wood sheathing directly applied or 3-0-4 oc purfins, except end verticals. Rigid ceiling directly applied or 2-2-0 oc bracing. 1 Row at midpt 6-16 FORCES. (Ib)-Max. Comp./Max.Ten. -Ali forces 250 pb) or lass except when shown. TOP CHORD 1-2=2966/951, 2-3=28921961, 34=2794f888, 45=2755/898, 55=2254/793, 6-7=2068/806, 741=2068/806, 8-9=20547730, 9-10=1839/575 BOT CHORD 1-19=976/2597, 18-19=8a4/2443, 17-18=-804/2443, 16-17=564/2027,1576=503/1838, 14-15=,54911850, 1314=549/1850, 12-13=33611084 WEBS 519=54/343, 517=571f364, 0.17=1681533, 6-16=86/253, 7-16=-321/241, 8-16=1791514, 8.15=-55282, 9-13=448/218, 10-13=166/790, 10-12=1801/564 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=160mph (3-second gust) Vasd=124mph; TCDL=4.2psf; BCDL=S.Opsf; h=1511; Cat 11: Exp C; End., GCpi=0.18: M WFRS (envelope); Lumber DOL=1.60 plate gdp DOL=1.60 3) Provide adequate drainage to preventwater pending. 4) This buss has been designed for a 10.0 psf bsfflom chord live load noncencument with any other live loads. 5) Provide mechanical connection (by o ebleehrilns�rMirgv600dWpliBm ' int(6) except at --lb) 1=493. 12=456. REVIEWED 0 REVIEWED AS NOTED LOAD CASE(S) Standard 11 REVISES RESUBMIT ❑ REJECTED( RESUBMIT ❑ NOT REVIEWED 13 FOR YOUR INFORMATION Submittals are reviewed for conformance with design intent and general compliance with the Contract Documents only. Notations Do flat Authorize Changes to Contract Sum. Reviews, Comments and/or corrections does not relieve the Contractor from compliance with the Contract Documents. The Contractor Is responsible for confirming and correlating all quantities, dimensions, tolerances, clearances, fabrication processes, techniques and sequences at construction, compatibility of materials and materials coordination of their work with olhar trades and subcontractors, performance of work in a safe and satisfactory manger and for II compliance with tke t Is. 3 ED BY \�\\\\� BLFJ�f(� yZ \�3 ZOSEOL) 7 r'lLU 60 ram= / e.