Loading...
HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATESH PERMIT #: Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 RECEIVED FEB 18 2020 sT. Lucie County, Permitting CERTIFICATE OF TERMITE TREATMENT SCANNED CONSTRUCTION SOIL TREATMENT By St. Lucie county • • w A • {� 6 i r w A JOB ADDRESS: BUILDER/CONTRACTOR: 0AQ,0,S C9C:�j 0-64e PEST CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: G Chemicals used: DOMINION 2L Percentage of solution: .05% Date of Treatment: _2, - ) - ;?-o Footing 1't Treatment Re -Treat Driveway 1s` Treatment Other Re �C 0 S h(�I �C 1't Treatment Re -Treat Note: There must be a completed form for each rey site to be picked up by the inspector at time of each fee charged. Total gallons used: 2-2—j Time of Treatment: / 9 t 3 d Slab 1st Treatment Re -Treat Pools 1s` Treatment for Final ure of a inator Date Went o re -treatment and this form must be on the job or t e scheduled inspection will fail and a re -inspection FBC104.2.6 Certificate of Protective Treabnent for prevention of termites. A weather resistantjobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014 Planning & Development Services Building & Code, Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 -CERTIFICATE OF TERMITE TREATMENT SCANIVED CONSTRUCTION SOIL TREATMENT BV St Lucie Co.,,,, PERMIT #: JOB ADDRESS: _j ry 74' Dt� s� BUILDER/CONTRACTOR:/ r Ccrac.-S ec.cre�--, PEST CONTROL CONTRACTOR: OR: EVICT -A -BUG TERMITE & PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: ?17 00 Percentage of solution:.05ia Date of Treatment: 2018 Footing /f reatment Re -Treat Driveway 15t Treatment Re -Treat Other 1st Treatment Re -Treat Chemicals used: DOMINION 2L Total gallons used: 2- IS — Time of Treatment: Z ; /,-- - -Slab 1st Treatment Re -Treat Pools 1st Treatment Re -Treat xxxxx Perimeter for Final Inspection PAUL C LUGARA JR) w":Z18 GMlm z JR Signature of Exterminator Date Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged, FBC104.2.6CerVficateofProtecdveTreatment forpreventionoftermites A weather resistantjobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the pennitis issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CID, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. xevisea iizwlui4