HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATESH
PERMIT #:
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
RECEIVED
FEB 18 2020
sT. Lucie County, Permitting
CERTIFICATE OF TERMITE TREATMENT SCANNED
CONSTRUCTION SOIL TREATMENT By
St. Lucie county
• • w A • {� 6 i r w A
JOB ADDRESS:
BUILDER/CONTRACTOR: 0AQ,0,S C9C:�j 0-64e
PEST CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST CONTROL INC.
PEST CONTROL LICENSE #: JB175775
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: G Chemicals used: DOMINION 2L
Percentage of solution: .05%
Date of Treatment: _2, - ) - ;?-o
Footing
1't Treatment
Re -Treat
Driveway
1s` Treatment
Other Re �C 0 S h(�I �C
1't Treatment
Re -Treat
Note: There must be a completed form for each rey
site to be picked up by the inspector at time of each
fee charged.
Total gallons used: 2-2—j
Time of Treatment: / 9 t 3 d
Slab
1st Treatment
Re -Treat
Pools
1s` Treatment
for Final
ure of a inator Date
Went o re -treatment and this form must be on the job
or t e scheduled inspection will fail and a re -inspection
FBC104.2.6 Certificate of Protective Treabnent for prevention of termites. A weather resistantjobsite posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment
Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of
protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.
Revised 7/24/2014
Planning & Development Services
Building & Code, Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
-CERTIFICATE OF TERMITE TREATMENT SCANIVED
CONSTRUCTION SOIL TREATMENT BV
St Lucie Co.,,,,
PERMIT #: JOB ADDRESS: _j ry 74' Dt� s�
BUILDER/CONTRACTOR:/ r Ccrac.-S ec.cre�--,
PEST CONTROL CONTRACTOR: OR: EVICT -A -BUG TERMITE & PEST CONTROL INC.
PEST CONTROL LICENSE #: JB175775
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: ?17 00
Percentage of solution:.05ia
Date of Treatment: 2018
Footing
/f reatment
Re -Treat
Driveway
15t Treatment
Re -Treat
Other
1st Treatment
Re -Treat
Chemicals used: DOMINION 2L
Total gallons used: 2- IS —
Time of Treatment: Z ; /,--
- -Slab
1st Treatment
Re -Treat
Pools
1st Treatment
Re -Treat
xxxxx Perimeter for Final Inspection
PAUL C LUGARA JR) w":Z18 GMlm z JR
Signature of Exterminator Date
Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job
site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection
fee charged,
FBC104.2.6CerVficateofProtecdveTreatment forpreventionoftermites A weather resistantjobsite posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
providing a copy for the person the pennitis issued to and another copy for the building permit files The Treatment
Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of
protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspection for CID, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.
xevisea iizwlui4