HomeMy WebLinkAboutFIELD - LABORATORY REPORTi
UNIVERSAL
ENGINEERING SCIENCES
ConsultantsIn: Geotechnical Engineering • Environmental Sciences
Geophysical Services • Materials Testing • Threshold Inspection
Building Cade Administration, Compliance Inspection & Plan Review
820 Brevard Avenue, Rockledge, FL 32956 - P: 321.638.0808 - F: 321.638.0978
UES Project No.: 0310.1700251.0045
Date Typed__February07 2019
Construction Materials Testing Services
FIELD AND LABORATORY REPORT COVER PAGE
Client: Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
Project: Oakland Lake Subdivision Lot 48
5523 Oakland Lake Circle Permit A 01-0216, t. Pierce, St. Lucie County, FL
As requested, Universal Engineering Sciences, Inc. (UES) representative(s) performed construction materials testing and/or
field inspection services on the above project. Testing results and/or inspection observations are reported on the attached
sheets. The contents of this package are summarized below:
Scope of Work
Work Order No.
I Date
I Type of Report
106665-1
1 02106/2019
In -Place Density Test Report w/Activity Record
We hope this information is sufficient for your immediate needs. If you have any questions, please do not hesitate to contact
the undersigned.
PU
Attachments (1)
MAR 18 2019
Sincerely,
Universal Engineering Sciences, Inc.
Certificate of'Autheriiatien No. 00000549
Richard E. Hoaglin, P.E.
FLORIDA
Professional Engineer No. 48796
ICC Email: ebugg@nvrinc.com; rhagerQa nvdnc.com; sign/seal MAIL to ryan homes at 5369 Oakland Lake, Vero Beach, FL 32966
Revised May 2015
.t
UNIVERS
UE' rroject No: 0310.1700261.0046
UES DOCS No:
ENGINEERING SCIENCES On -Site Time (hrs): 1.00
Consultants In: Geotechnical Engineering • Environmental Sciences Lab Time (hrs): 0.00
Geophysical Services • Materials Testing • Threshold Inspection Travel Time (hrs): 0.25
BuildingCodeAdministration,ComplianceInspection&Plan Review Total Time (hrs): 1.25
820 Brevard Avenue, Rockledge, FL 32965 - P: 321.638.0808 - F: 321.638.0978
Activity Record
Client: Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
Project: Oakland Lake Subdivision Lot 48
5523 Oakland Lake Circle Permit #1901-0216, Ft. Pierce, St. Lucie County, FL
Date of Activity: Wednesday, 06 February, 2019
Technician: Cliff Chermav
As requested, a Universal Engineering Sciences Technician was present at the above referenced project site for the purpose of
earthwork testing for the House pad.
While on site, the technician observed the general condition of the areas to be tested and performed 4 density test(s) for House
pad. All test(s) were performed in accordance with the ASTM D-6938 Nuclear Gauge Method and were found to meet the
project compaction requirements of 95% of the maximum dry density per ASTM D-1557.
The Contractor was notified of the test results or a copy was left for their records.
UNIVERSALLIES UES DOCS No: 0310.1700251.0045
-ENGINEERfNG SCIENCES UES-Rep6rt-Mo 0t06665=1-DT-vz06-rs
Consultants In: Geotechnical Engineering ° Environmental Sciences
Geophysical Services • Materials Testing • Threshold Inspection
Building Code Administration, Compliance Inspection & Plan Review
820 Brevard Avenue, Rockledge, FL 32955 - P: 321.638.0808 - F: 321.638.0978
In -Place Density Test Report
Client: Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
Project: Oakland Lake Subdivision Lot 48
5523 Oakland Lake Circle Permit #1901-0216, Ft. Pierce, St. Lucie County, FL
Area Tested: House pad
Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 02/06/2019
Lab: ASTM D1557 Modified Proctor
Technician: Cliff Cherrnay
Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions
only and do not address the condition of the underlying soils below the tested deaths_
Test
No.
Location of Test
Range
Depth
(inch)
Proctor
(2)
Field Dry
Density
(PCF)
Field
Moisture
%
%
Compaction
Comments
(3)
1
NM/ test
0-1 ft
12.00
21180
108.7
10.5
97
A
2
N/E test
0-1 ft
12.00
21180
109.0
10.3
97
A
3
S/E test
0-1 ft
12.00
21180
110.0
10.2
98
A
4
S/W test
0-1 ft
12.00
21180
108.5
11.0
97
A
(1) Ref. Datum: 0 = Top of Final Grade
(2)
Maximum
Optimum
Proctor
Dry
Moisture
#
Density
Content
21180
112.0
11.0
This test was performed without deviation from ASTM procedures.
(3) Comments Key
A. Compaction meets min. requirements
B. Compaction does not meet min. requirements
C. Moisture does not meet requirements
D. Recompaction required
E. Recompacted, Retested, Meets Requirements
This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences.
UES
UdENGINEERING SCIENCES UES Report
Consultants In: Geotechnical Engineering -Environmental Sciences
Geophysical Services • Materials Testing • Threshold Inspection
Building Code Administration, Compliance Inspection & Plan Review
820 Brevard Avenue, Rockledge, FL 32955 - P: 321.638.0808 - F: 321.638.0978
In -Place Density_Test Report
Client: Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
Project: Oakland Lake Subdivision Lot 48
5,5-23Oakland Lake Circle Permit #1��. Pierce, St. Lucie County, FL
Area Tested: House pad
Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 02/06/2019
Lab: ASTM D1557 Modified Proctor
Technician: Cliff Cherrnay
Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions
only and do not address the condition of the underlvina soils below the tested depths.
Test
No.
Location of Test
Range
Depth
(inch)
Proctor
(2)
Field Dry
Density
(PCF)
Field
Moisture
%
%
Compaction
Comments
(3)
1
N/W test
0-1 ft
12.00
21180
108.7
10.5
97
A
2
N/E test
0-1 ft
12.00
21180
109.0
10.3
97-
A
3
S/E test
0-1 ft
12.00
21180
110.0
10.2
98
A
4
S/W test
0-1 ft
12.00
21180
108.5
11.0
97
A
(1) Ref. Datum: 0 = Top of Final Grade
(2)
Maximum
Optimum
Proctor
Dry
Moisture
#
Density
Content
21180
112.0
11.0
This test was performed without deviation from ASTM procedures.
(3) Comments Key
A. Compaction meets min. requirements
B. Compaction does not meet min. requirements
C. Moisture does not meet requirements
D. Recompaction required
E. Recompacted, Retested, Meets Requirements
FEB 15 2019
Permitting Department
St�ounty, FL
This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences.
a
UES Project No.: 0310.1700251.0045
Date Typed: February 07, 2019
ENGINEERING SCIENCES
Consultants In: Geotechnical Engineering •Environmental Sciences
Geophysical Services • Materials Testing • Threshold Inspection
Building Code Administration, Compliance Inspection & Plan Review
820 Brevard Avenue, Rockledge, FL 32956 - P: 321.638.0808 - F: 321.638.0978
Construction Materials Testing Services
FIELD AND LABORATORY REPORT COVER PAGE
Client: Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
Project: Oakland Lake Subdivision Lot 48
5523 Oakland Lake Circle Permit #1901-0216, Ft. Pierce, St. Lucie County, FL
As requested, Universal Engineering Sciences, Inc. (LIES) representative(s) performed construction materials testing and/or
field inspection services on the above project. Testing results and/or inspection observations are reported on the attached
sheets. The contents of this package are summarized below:
Scope of Work
Work Order No. Date IType of Report
106665-1 1 02/06/2019 In -Place Density Test Report w/Activity Record
We hope this information is sufficient for your immediate needs. If you have any questions, please do not hesitate to contact
the undersigned.
Attachments (1)
`c,�'ltlilll4;7�/rr
`� ;n gyp /���x
C �tCENSF•�G�
•,�'
•' dNo' 4879&
STATE'6P > j
Sincerely,
Universal Engineering Sciences, Inc.
Certificate of Authorization No. 00000549
Richard E.
Hoaglin, P.E.
2019.02.07
13:02:39
-05'00'
Richard E. Hoaglin, P.E.
FLORIDA
Professional Engineer No. 48796
This item has been electronically signed and sealed by
Richard E. Hoaglin, P.E. using a Digital Signature. Printed
copies of this document are not considered signed and
sealed and the signature must be veered on any electronic
copies.
ICC Email: cbugg@nvrinc.com; rhager@nvrinc.com; sign/seal MAIL to ryan homes at 5369 Oakland Lake, Vero Beach, FL 32966
Revised May 2015
LIES Project No: 0310.1700251.0045
LIES DOCS No:
tuENGINEERING SCIENCES On -Site Time (hrs): 1.00
Consultants In: Geotechnical Engineering • Environmental Sciences Lab Time (Its): 0.00
Geophysical Services • Materials Testing • Threshold Inspection Travel Time (hrs): 0.25
Building Code Administration, Compliance lnspecfion&Plan Review Total Time (hrs): 1.26
820 Brevard Avenue, Rockledge, FL 32955 - P: 321.638.0808 - F: 321.638.0978
Activity Record
Client: Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
Project: Oakland Lake Subdivision Lot 48
5523 Oakland Lake Circle Permit #1901-0216, Ft. Pierce, St. Lucie County, FL
Date of Activity: Wednesday, 06 February, 2019
Technician: Cliff Cherrnay
As requested, a Universal Engineering Sciences Technician was present at the above referenced project site for the purpose of
earthwork testing for the House pad.
While on site, the technician observed the general condition of the areas to be tested and performed 4 density test(s) for House
pad. All test(s) were performed in accordance with the ASTM D-6938 Nuclear Gauge Method and were found to meet the
project compaction requirements of 95% of the maximum dry density per ASTM D-1667.
The Contractor was notified of the test results or a copy was left for their records