HomeMy WebLinkAboutEMAIL - MISC LETTERSBuilding Permit# 1901-0370 — Design Professional/Owner Update
Comment:
PLEASE PROVIDE A STAIR DETAIL FOR THE FRONT ENTRY. SEE SECTION 107 OF
THE 2017 FBC. 2/1/2019 ferschj
-------- Original message --------
From: Steve LiCausi <sldesien roup(c,yahoo.com> SCANNED
Date: 2/4/19 9:46 AM (GMT-05:00) BY
To: onequikss <oneauikssl7u bellsouth.net> St. Lucie County
Subject: Re: Stair detail
After reviewing the foundation plan with the plan review comment sheet the step detail is on the
drawings.
The F-5 Entry footing shows the design of the footing along the entry and the tread and riser
dimensions for the steps.
The plans examiner must of overlooked the detail.
Thanks,
Steve
On Sunday, February 3, 2019, 4:27:22 PM EST, onequikss <oneguikss(cDbellsouth.net> wrote:
Good afternoon Steve,
When do you anticipate having the stair detail completed? If you have not already drawn it, we would like
the bottom step to wrap around the base of the top step. Give me a call if I have confused you with my
description.
Thank you for your assistance,
Mike
Sent from my Verizon, Samsung Galaxy smartphone
1
Lydia Galbraith
From: Lori Bender
Sent: Thursday, January 24, 2019 3:39
To: Lydia Galbraith; Angela Huff
Subject: PERMIT NO 1901-0370
NEW ADDRESS: wlkg6.BD8 -
5180 Dunn Rd
PM
SCANNED
St CuCeC007ty