Loading...
HomeMy WebLinkAboutKSM REPORTK.E LLER,_SLC.H-L E IC.H-ER_&_Mac-1N LLLI A M-EN-GJ_N-EER1N_G_A N_D-T-ES-T-IN_G.,_LN C . MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST,, LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 DATE TESTED PERMIT # CONTRACTOR JOB LOCATION SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 2922 April 11, 2019 1901-0597 Wynne Development SC 1 KSM JOB # : 19V1/SS/cv St- Lucie County RECEIVED APR 24`1119 Permitting Department St. Lucie County ITEM TESTED Compacted Foundation Fill 13969 Encantardo Circle Spanish Lakes Fairways Fort Pierce, Florida TEST LOCATION DEPTH OF SAMPLE PEN READ DRY MAX. DRY PERCENT DENSITY PROCTOR VALUE COMPACTION 1. N.W. 0" - 12" 50+ 108.6 113.0 96.1 2. N.E. 110.2 97.5 3. Center 112.1 99.2 4. S.E. 109.9 97.3 5. S.W. 111.0 98.2 Soil Description: Brown and Gray Sand 114.0 I I I I I with Clay W In Place Moisture: 6.8 Percent G 113.0 .--- ..—.-_---- Optimum Moisture: H I I I I I 11.0 Percent T Max. Dry Density: P 112.0- 113.0 P.C.F. I I I I I C I @ Test Locations The Density & Penetrometer F Readings Indicate the 111.0 —•I_ —I'— '-f' —' T '— 7—' —' Degree of Compaction Meets Minimum Required D for urtF 49n R �ta G lC �` A,` Y I I I 1 110.0 8 9 10 11 12 I 13 14 Moisture - % of Dry Weight County Building Department "III l l %%\Ronald G. Keller, P.E.: 37293 / SI Lie. No.: 860 / 'Julie E. Keller, P.E.: 68366