HomeMy WebLinkAboutMISC LETTERSSCANNED
St. Luce county
1DFebru Wgol6
ToWham RMayConaem;
This bto amlrm that QHO Homes are owmd wb the Meadewood Co mnmdV
Amdatfon dam whM brdade the watw' and sewer service. Meadawood Ccmmwdy
pray ndwwetermWowatathWownsreaspadoHheltgsadWameaemerde.
H bfherbrterrr,dOn b m*dmd, pbaes leaf tree to amftd me.
CrWWAebbm LOAM
pm" Mmmm
MeadowoodCOMMA f►AmOdMion
awsimawm,nose
rolft,Ma. aaas�
Ter Trsas"M FU 7n46M se
February 13, 2019
St Lucie County
Planning & Development Services
Building & Code regulation Division
2300 Virginia Ave.
Fort Pierce, FL. 34982
772-462-2172
SCANNED
BY
St. Lucie County
RE: REVIEW COMMENTS response = 9431 Meadowood Dr. Ft Pierce. Permit # 1901-0605
ello,
The attached are sent in response to the review Comments received for the above referenced permit.
Review Comments addressed:
rrevised ecalcs with original signatures
Accessible bathroom indicated
R Values provided
hank you.
Please let us know if you require anything further.
�eccai �Grncri
GRBK GHO Homes, LLC.
590 NW Mercantile Place, Port St Lucie, FL 34986 • (772) 257-1100
www.ghohomes.com • License #CBC051145
Nuelle Engineering
Donald J. Nuelle P.E.
815 University Boulevard Apt. 301
Jupiter, FL 33458
Cellular 561-629-6975
GHO Homes
590 NW Mercantile Place
Port St. Lucie, FL 34986
Attn: Bill Handler
Re: Termite Treatment Option
Dear Mr. Handler.:
Date: 1011712015 SCANNED
BY
St Luce County
FILE COPY
Per your request. I have inspected the termite treatment requirements in
the FBC and find the baiting method (which is used on all GHO homes) should
have been specified on the foundation notes instead of the soil treatment. The
soil treatment note is an error and should be omitted.
R318.1.7
If a registered lermiticide formulated and,registered as a bail system is used for
subterranean termite prevention, Section R318.1.1 through Section R318.1.6 do not apply;
however, a signed contract assuring the installation, maintenance and monitoring of the
baiting system that is in compliance with the requirements or Chapter 482, Florida Statutes,
shall be provided to the building official prior to the pouring of the slab, and the system must
be installed prior to final building approval
If you or any other interested party has any questions or requires
additional information please feel free to contact me at any time.
Nuelle P
P.E.