Loading...
HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATEFrom fax56168809^9`1.161.688.0909 Wed Oct 9 13:17:18 201-0,..MDT Page 1 of 1 Rol UIO 2300 Virginia AvenueFt Pierce, FL 34982(722) 462-2172 ST. Lucie County, perrc SCANNED CERTIFICATE OF TERMITE TREATMENT —By CONSTRUCTION SOIL TREATMENT St. Lucie County PERMIT # 1Qnj-C3,C( J J JOB ADDRESS 9431 Meadowood Dr, Fort Pierce, FL 34951-2900 BUILDER GHO Homes PEST CONTROL CONTRACTOR HomeTeam Pest Defense, Inc. PEST CONTROL LICENSE # JF0001886 We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: 400 Percentage of solution:.50% Date of treatment: 09/27/19 ® Footing ® 1st Treatment ❑ Re -treat ❑ Slab ❑ 1st Treatment ❑ Re -treat ❑ Driveway ❑ 1 st Treatment ❑ Re -treat ❑ Pools ❑ 1st Treatment ❑ Re -treat ❑ Other ❑ 1st Treatment ❑ Re -treat Chemicals used: Sentricon Always Active HD Total gallons used: Time of treatment: AM FBCI04.2.6 Certificate of Protective Treatmentforprevendon of termite& A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copyfor the person the poermit is iisued to and anothercopyforthe buildingpermitfiles. The Treatment Cerfcateshall provide the product used, identity ofthe applicator, time and date ofthe treatment, site location, area treated, chemical used, percent concentration and number ofgallons used, to establish a verifiable record ofprotective treatment. if the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. ® Perimeter for Final Inspection Signature of exterminator NOTE: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will jail and a re -inspection fee charged