HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATEFrom fax56168809^9`1.161.688.0909 Wed Oct 9 13:17:18 201-0,..MDT Page 1 of 1
Rol
UIO
2300 Virginia AvenueFt Pierce, FL 34982(722) 462-2172
ST. Lucie County, perrc
SCANNED
CERTIFICATE OF TERMITE TREATMENT —By
CONSTRUCTION SOIL TREATMENT St. Lucie County
PERMIT # 1Qnj-C3,C( J J JOB ADDRESS 9431 Meadowood Dr, Fort Pierce, FL 34951-2900
BUILDER GHO Homes
PEST CONTROL CONTRACTOR HomeTeam Pest Defense, Inc.
PEST CONTROL LICENSE # JF0001886
We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean
termites in accordance with the standards of the National Pest Control Association.
Square feet of area treated: 400
Percentage of solution:.50%
Date of treatment: 09/27/19
® Footing
® 1st Treatment
❑ Re -treat
❑ Slab
❑ 1st Treatment
❑ Re -treat
❑ Driveway
❑ 1 st Treatment
❑ Re -treat
❑ Pools
❑ 1st Treatment
❑ Re -treat
❑ Other
❑ 1st Treatment
❑ Re -treat
Chemicals used: Sentricon Always Active HD
Total gallons used:
Time of treatment: AM
FBCI04.2.6 Certificate of Protective Treatmentforprevendon of termite&
A weather resistant jobsite posting board shall be provided to receive
duplicate Treatment Certificates as each required protective treatment is
completed, providing a copyfor the person the poermit is iisued to and
anothercopyforthe buildingpermitfiles. The Treatment Cerfcateshall
provide the product used, identity ofthe applicator, time and date ofthe
treatment, site location, area treated, chemical used, percent concentration
and number ofgallons used, to establish a verifiable record ofprotective
treatment. if the soil chemical barrier method for termite prevention is used,
final exterior treatment shall be completed prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent
Sticker to be placed on the electrical panel box cover, listing all the
treatments and dates of applications.
® Perimeter for Final Inspection
Signature of exterminator
NOTE: There must be a completed form for each required treatment or re -treatment and this form must be on the
job site to be picked up by the inspector at time of each inspection or the scheduled inspection will jail and a
re -inspection fee charged