HomeMy WebLinkAboutDUCT SEALING CERTIFICATIONPlanning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772-462-2165 Fax T72A62-6W
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
Date: 0R5 a0( Pernit#:
Contractor. RIB r Address:
Construction: o Post Construction Test o Rough -in Test
P^�,; ✓Gym c�2Fo
<�c9aP �p�
SC �c��°`y�P'�
q
sf 441o, -
C0.(
Lot#:
1..-[ 1 d4z'c c-2
Test Conditions:
Date: bo FloorArea(ft2): (333
Time: Primary Location of Supply Ductwork
Indoor Temperature (F): `( Primary Location of Return Ductwork
A�-
Outdoor Temperature (F): . — 1
Total Leakage Test Outslde
Duct Leakage: efaull ❑ Prop. Leak Free ❑ Proposed On =
Test Pressure: (Pa)
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: ss o Fail
Installed Pa 2']
Total Leakage (cfm): /L1
Total Leakage per 100 sgft[/ Q �"
CFM25 x 100 divided by the CFA = Duct Leakage CFM1100 sgfi.
Company Name:
� n i
Compan Name: 6�l Address: �� HnE f r�)N[
I hereby certify that the above A Sealing Leakage results demonstrate compliance with 5" Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.
Signature:
Printed Name: ,IY{tla-,JevL6liVPYC LicenselCertficate#: