Loading...
HomeMy WebLinkAboutBUILDING SITE PLANSSPECIFICATIONS DIVISION ONE - GENERAL REQUIREMENTS 1-1 Interpretation of Plans - The Architects services does not include supervision of construction. The Architect divest himself of the responsibility of the work, errors or emissions resulting from the interpretation of the plans. If the Contractor believes he has discovered errors or omissions in the plans the Contractor shall notify the Architect in writing for clarification before continuing work. 1-2 Applicable Standards -All work under this Contract, or Sub- contracts shall conform to recent editions of local, state and national codes, ordinances and regulations pertaining to the work, F.B.C., A.C.I., A.N.S.I., A.S.T.M., O.S.H.A., etc. 1-3 Scope of Work -Contractor shall furnish or provide for all items, articles materials operations o methods listed, op era r m t mentioned or scheduled on drawings and/or herein specified, including all labor, materials, equipment, and incidentals necessary and required to perform and complete work as shown in drawings and/or herein specified or as required for a completed project. 1-4 The drawings were design per FBC 2017 • Wind Pressures designed for Enclosed Structure • Basic Wind Speed —165 mph — 3 second gust • Wind Importance factor (Risk category) — II • Wind Exposure — D 1 5 Verifying Conditions Before comme ncin work, Contractor shall verify measurements and conditions at building site. Any differences between actual measurements and those shown on drawings shall be submitted to the Architect in writing before proceeding. 1-6 Permits - Contractor to provide all permits and fees as required from government agencies. 1-7 Surveying - Owner to provide original survey. Contractor to provide all surveying as required during construction and shall verify all set backs and elevations. 1-12 Testing and Laboratory Services - Inspections or tests required by code, ordinance or as indicated herein or on Drawings shall be the responsibility of the Contractor. 1-3 Conflict of Information - if information is contradictory with different instructions for the same aspect, contractor must report to architect. One information must not be used as more important as the other. the architect will review and revise for the correct information. DIVISION TWO - SITE WORK 2-1 Demolition / Clearing - Remove organic / vegetation matter from building and pavement area. Remove from site. Do not bury. Do not disturb deeper soils us needed and leave uncovered for proper fill and compaction procedures. 2-2 Excavation- Excavate site to levels required for construction. Strip soil of all deleterious material 5' -0" past exterior of building lines. 2-3 Fill and Compaction - Provide clean well -graded sand placed in maximum 12" lifts compacted to 95% of modified proctor maximum dry density, ASTM d-1557 at optimum moisture content. Compaction is to be verified by an independent testing laboratory. 2-4 Soil Bearing - Foundations are designed at assumed soil bearing value of 2500 pounds per square foot. Contractor is to verify and to notify Architect. If such bearing values cannot be developed in the soil under the building, the Contractor is to notify the Architect in writing. The Architect will, as an addition to his contract, provide a revised foundation design based on conditions reported on -site in the testing engineer's report. This contract would also be revised accordingly. 2-5 Soil Treatment - Treat compacted soil with an approved termite treatment at rates specified by manufacturer. Treatment shall not be made when ground is excessively wet or directly after heavy rains. 245'-1( DIVISION THREE - CONCRETE 3-1 Concrete - Structural concrete shall develop a minimum strength of 3000 psi at 28 days. All concrete shall be ready mixed and in accordance with ASTM C-94. Maximum allowable slump to be 5". All slabs to be 3000 psi at 28 days. Water shall not be added on site without record and compression test of altered mix. 3-2 Scope - Provide all structural concrete, filled cells, slabs, beams, footings, equipment pads, drives, walks, etc. as shown on drawings or as needed to complete job. 3-3 Reinforcement - reinforcing bars shall conform to ASTM specification A615. latest edition, including supplemental requirements and shall be grade 60. Splices in concrete, lap bars 42 bar diameters. Splices in mason la bars 48 bar r p masonry, p diameters. At corners, make horizontal bars continuous or provide corner bars. Bars intersecting at re-entrant corners shall cross with h n t f f th each ending in g the far a e a ace o e wall with a standard hook at standard cover unless noted otherwise on the drawings. Around openings and steps in walls, provide (2) #5's extending 2'-0" beyond edge of opening or step. Horizontal bars at the top of the beams shall be spliced only at midspan between columns and horizontal bottom bars shall be spliced only at column centerline. 3-4 Concrete Formwork - Adequate and safe design of formwork and shoring is the responsibility of the Contractor. Sleeve slab and footingre for mechanic as required q al and electrical. 3-5 Crack Control l-Provide 6x6, 10/10 gauge welded wire fabric in all slabs, walks, and drives Also provide "Fibermesh" (1.5 Ibs per cubic yard) crack control additive per manufacturer's specifications in all building slabs and monolithic footing. saw cut slabs within 5 days with 3/8" deep control joints max 400 sq.ft square or 200 sq ft rectangle or at inside corners. 3-6 Vapor Barrier Membrane - Provide .006" polyethylene vapor barrier beneath building slab. 3-7 Minimum concrete cover - Slab - 3/4" Exposed unprotected concrete - 1 1 /2" Formed concrete above grade — 1 1 /2' Formed concrete below grade - 2" Uniformed concrete below grade - 3" 3-8 Expansion Bolts- where required shall be located at a min of 5 bolt diameters from the concrete edges and spaced a min of 10 bolt diameters U.N.O. DIVISION FOUR - MASONRY 4-1 Unit Masonry - Concrete block units to conform with ASTM C-90. Concrete block shall have dense uniform shell surface for exposed finish. Provide shapes and sizes required to complete the work with a minimum of cutting and piecing. Provide reinforcement of the types shown on the Drawings. 4-2 Mortar - Provide mortar type "S" conforming with ASTM 270. 4-3 Grout - Provide grout in accordance with ASTM C476. 4-4 Execution - Except as shown on the Drawings, lay up the concrete masonry units in running bond, tooling all joints. Protect and seal exposed cmu surface for finish paint 4-6 Miscellaneous Masonry Anchors - Fabricated from 16 gauge steel sheet or 3/8" steel rod, 1.5 hot dipped zinc coating. 4-7 Fill Masonry Cells - all CMU cells with reinforcement shall be filled solid. SCOPE OF WORK: LEVEL 2 ADDITION OF BREAKFAST NOOK, REPLACE MAIN DOOR AND WINDOWS AT MAIN HOUSE. ADD NEW COVERED PORCH. REPLACE ROOF ON FRONT HOUSE AND PORCH Site Plan SCALE: 1/16"= F-0'' DIVISION FIVE - METALS 5-1 Miscellaneous Metals - Contractor shall furnish and install, or furnish for other trades when required, all miscellaneous metal, steel, and metal fabrications including, but not limited to, hangers, anchors, bolts, plates, supports, lintels, brackets, and other miscellaneous items necessary to frame or support the Work. 5-2 Coordinate Metals - Metals in contact with each other must be selected to avoid dielectric decomposition or supply adequate separating material between the two different metals. Metals/ fasteners exposed to weather shall be stainless steel unless noted otherwise on the drawings. DIVISION SIX - WOOD AND PLASTICS 6-1 Lumber - All lumber permanently incorporated into the structure shall be air or kiln- dried and shall contain not more than 19% moisture. Elevate and cover lumber on site to protect from moisture. All lumber and plywood shall be identified by grade stamps. 1. Min allowable flexural bending stress for beams shall be 1500 PSI at normal load duration. 2. Min allowable horizontal shear stress for beams shall be 90 PSI. 3. Min allowable modulus of elasticity for post or beams shall be 1,500k PSI. All Roof framing to be Group 2 lumber, kiln -dried 2x6/2x8/2x10 minimum Fb=1400K PSI (SPR or Southern Pine), 2x4's min. Fb 1800K, except where noted. All studs to be straight and true. Framing lumber to be # 1 or better pressure treated southern yellow pine, minimum Fb=1200K PSI. Blocking, bracing, and nailers shall be utility grade and provided as required. 6-3 Wood in direct contact with weather, concrete, masonry, or soil shall be pressure treated with the requirements of the standards of the American Wood Preservers Association. Approved galvanized rafter anchors shall be provided at each bearing. Installation shall separate wood from concrete (where applicable) with either 30# felt or fBC approved galvanized or stainless truss seats. 6-5 Field Measurements - contractor to take measurements in field as required to verify or supplement dimensions on drawings and assume responsibility for fit of wood structure. Alkaline copper (ACQ-C/D) or Copper Azole (CBA-A or CA-B) shall be used for exterior applications. 6-7 Rough Carpentry - Select material so that knots and defects will not interfere with placing bolts or proper nailing. Produce joints which are tight, true, and well nailed, with members assembled in accordance with the Drawings and with pertinent codes and regulations. Comply with "Fastening Schedule" of the F.B.C. 2017 edition and other fastening requirements contained in the pertinent regulations of governmental agencies having jurisdiction. 6-9 Metal fasteners, clips, holddowns - All model numbers are per Simpson Strong- Tie Company, Inc. If an alternative manufacture is used - submit allowable loads, capacities to the architect for approval. 6-10 Sheathing 1. Roof Sheathing - shall be 4' x 8' x 5/8"(min.) CDX plywood. Install the panel's long dimension perpendicular to the framing. Sheathing fasteners shall be 8d hot dipped galvanized ring shank nails unless noted otherwise: Zone 1 - 6"o.c. at edges and 6"o.c. at intermediate framing Zone 2 - 4"o.c. at edges and 6"o.c. at intermediate framing Zone 3 - 3"o.c. at edges and 3"o.c. at intermediate framing use 8d ring -shank nails and adhesive within 5' of a gable end. EXISTG DRIVEWAY 6-11 Metal fastener materials Standard (G-90) treated metals may be used on untreated, Chromated Copper Arsenate (CCA-C), or Sodium Borate (SBX) treated wood only. ZMAX (G-185) , Hot Dipped Galvanized (HDG), or stainless steel treated metals must be used in Alkaline copper (ACQ-C/D) or Copper Azole (CBA-A or CA-B) treated woods. DIVISION SEVEN - THERMAL AND MOISTURE PROTECTION 7-1 Waterproofing - Coordinate waterproofing with other trades and make provisions for their work to avoid cutting and patching. 7-2 Insulation - Provide Insulation system for total insulation. A min. of 9" thickness of Isocyene foam insulation R-20 or 12" R-30 batt insulation shall be applied to the roof sheathing. 7-3 Provide Firestone TPO UltraPly 60 mil. and a 25 year guarantee. Install system W-A-6 over 1 /2" dense deck prime by Georgia Pacific. TPO and dense deck both fully adhere by manufacture approve adhesive per product approval. All seams welded. Provide complete system installation for enhanced values of design pressures. 7-4 Flashing and Sheet Metal - Provide flashing and sheet metal not specifically described in other sections of these specifications but required to prevent penetration of water through the exterior shell of the building complying with pertinent recommendations contained in current edition of SMAACNA's "Architectural Sheet Metal Manual." All flashing to be existing roof matching roof metal unless otherwise noted. 7-5 Sealants and Caulking - Standard caulking compound shall be a one part urathane sealant. Color shall be manufacturer's standard paintable grade. Window and Door perimeter and buck Sealant shall be continuous Vulcum. 7-6 Infiltration Barrier - Building to comply with Florida Energy Efficiency Code for Building Construction Infiltration practice #2. Provide code approved infiltration barrier. 7-8 Building (Felt) Paper - Install where indicated on drawings. Shall be Asphalt saturated felt, non -perforated ASTM D 226. DIVISION EIGHT - DOORS AND WINDOWS 8A Doors and Frames - Provide all doors and frames hung true and plumb as indicated on schedule. Exterior swing door shall be Thermatur panel impact resistant as selected by owner. Color and hardware selected from manuf. standards. 8-2 Windows - Provide all fixed glass and operative windows true and plumb as indicated on schedule. *All operable windows shall be by PGT manuf. with ESP white alum. with laminated glass. All operable windows shall provide insect screen. •AII fixed windows shall be storefront system by YKK manuf. with ESP white alum. with laminated glass. Provide complete system as required by the manuf. for 165 mph wind loads. 8-4 Door Bucks shall be 2x thickness and anchored into a solid concrete or grout jamb with 1 /4" x 3 1 /4" masonry screw (ie. tap -con) for 1 1 /4" min. embedment at 12" oc and each end. DIVISION NINE - FINISHES 9-1 Wall siding shall be fiber cement board by Nishita finish as selected by owner and installed per product approval. EXISTING BUILDING 1 I r 1 I 1 ^N�EW SIDEWALK PROPOSED NEW PPRCH \ l Cloz c¢*? THESE PLANS AND ALL PROPOSED WpmF e ARE SUBJECT TO ANY CORRECTIONS No e EQUIRED BY FIELD INSPECTORS TH I MAYBE NECESSARY IN ORDER TO ND PE MIT COMPLY WITH ALL APPLIC49LE CODES. PT ON JOB an WILL BE MADE CONCEALED FASTENERS ORATTACHMENn ARE THE RESPONSIBILITLOF INDIAN RIVER DRIVE U d 2 0 w 0 t a 2 a 0 0 w w w tY S LD J J 0 ,(V L F I 4ECO Fy a a 0 O N 0 sv L y— O IC 0 cod N i > CZ OLC)-0 4) C O O .0 a c >a o 0 60 L o, F i _ N Z O LU JOB # DATE 1 / 29 / 19 SHEET DIVISION SIXTEEN - ELECTRICAL 16-1 Scope: Furnish all equipment and materials and perform all labor and services necessary to installation for a complete system for lighting and power. Each system shall be complete in all respects and shall be turned over to Owner in a first-class operating condition and fully tested and complete with all devices which are normal for intended systems and those required for their safe operation. 16-2 Materials and manner of installation of electrical system shall be in strict accordance with the requirements of the local governing authorities having jurisdiction, and the standards set forth by NEC, NFPA, U.L., or other recognized testing laboratories. The installation shall conform to the latest edition of the NEC. 16-3 Equipment mounted on the exterior of the building shall be designed, labeled, and installed for exterior, weatherproof service conditions. 16-7 Panel Schedule: Panel shall be clearly marked as to all circuits. 16-9 All wiring shall be THWN copper in 1 /2" dia electro plated conduit. 16-12 General duty receptacles shall be 15 amp specification grade, 125 volt AC, NEMA 5-15 configuration. white. 16-13 All receptacles shall be installed 12" from the finish floor unless noted otherwise. 16-14 All receptacles / circuits (in dwelling units) shall be arc -fault circuit interrupter type or gfci as required per 2008 NEC 210.12 and provided on similar circuit branch. 16-15 All receptacles shall be tamper -resistant receptacles 16-16 Switches shall be specification grade 125-277 volt 15 amp. White, rocker. 16-18 Cover plates shall be hard plastic white or as directed by owner 16-19 Provide junction boxes as required and feed all lighting circuits through appropriate junction boxes. 16-19 Owner shall provide electrician with a complete schedule of lights and appliances. Electrician shall coordinated all electric demands with the electrical calcs. e ABBREVIATIONS ANC ANCHOR BRG BEARING CANTI CANTILEVER CLG CEILING CMU CONCRETE MASONRY UNIT COL COLUMN DN DOWN EXP EXPANSION FIN FL FINISH FLOOR FL FLOOR FUG FLOORING FTG FOOTING GA GAUGE G/G GLUE AND GANG NAIL GYP GYPSUM JST JOIST OC ON CENTER P/P PRIMED AND PAINTED PT PRESSURE TREATED SIM SIMILAR STL STEEL THK THICK TYP TYPICAL WD WOOD Demolition Plan 4 s 0 L rd W LU W to W N H S LD Q KWI C 0 a 0 0 AL, W Q� CL V = C CC. C � 0 N L i 10 y �� — .O a c � i v O L O O N L O LL O I > UJ 0�� fl - - - - JOB # DATE 1 / 29 / 19 SHEET A2 ALE: 1 /4" = Y-0 St. Lucie County Building Department Product Approval Project Address: Contractor: Mr. Dan Hersey & Mr. Hanzel Pereira Pressures PSF Fort Pierce, Florida Product Product Manufacturer Agency # ID — Glass Model # Expire Required Windows _ SINGLE HUNG PGTSH5500 NOA +80/-80 SEE 15-0519.21 PLAN IMPACT I 09SGPLAM/S/ VINYL 3-26-21 SEE SCHED. 1/8" H.S. YES 45 FS YKK AP FL12926.2 +60 / - 60 IMPACT 1/8" H.S./ MILL FIN +60 / - 60 0.09 SGP LAM/ ALUM 1/8" H.S. Doors'` .' SEE SWING DOOR THERM -TRUE FL 50/-50 SCHED 10537.1 FIBERCLASSICFIBE SEF SCHED. RGLASS SMOOTH ASSEMBLY W-A-6 i5 PSF pey�t FIRESTONE FULLY SELF ADHERE TPO FL15894-R15 POI Z1-3 21.3 ULTRAPLY 60MIL. TPO 4" BEAD ENHANCE Z1 -49.3 Z2 -68.5 VALUE Z3 -107.0 Hardieplank 3d X 2" GALV. FINISH FL 202.2 / -202.2 Siding Lap Siding - I ILSFACE 2/STUD 13192.2 39.3 / -52,6 smooth Soffit STUCCO N/A ID I WIDTH I HEIGHT I Type 1 3' 1 6-8" IDI21 DOOR SCHEDULE ORIENTATIO 13 PRESSURE 42.1 / -46.1 PSF WINDOW SCHEDULE ID SIZE W x H Type PRESSURE REMARKS A 2'-8"X5' W Single Hung 1 21 43.2 / -46.9 PSF B 2'-8"X5' W Single Hung l 21 43.2 / -46.9 PSF C 2'-8'x5' W Single Hung 1 21 432 / -46.9 PSF D 2'-8"X5' W Single Hung 1 21 43.2 / -46.9 PSF E 2'-8"x5' W Single Hung 21 43.2 /-46.9 PSF F 2'-8"X5' W Single Hung 21 43.2 /-46.9 PSF G 2'-8'X5' W Single Hung 1 21 43.2 / -46.9 PSF H 2'-8"XS' W Single Hung 21 43.2 / -46.9 PSF Floor Plan SUALL: 1/4' = I'-U VLI LA 0 C 0 0 r N J O C 9D 0 U N L 2 O L 0 a m m r 13 D N N 6 0 N u a OC fW V a• L ` ! W O C y �� 0= c N111- i a O O O N Z O - 1 Lu W fl - , IL LU LU w Lu 2 cD JOB # Q DATE 00 SHEET 0 N 1/29/19 Al North Elevation 1/4" = 1' East Elevation SCALE: 1/4" = 1'-0" South Elevation SCALE: 1/4" = SCIA 0 uj W LU W N F- V J Q 0 04 0 T Q O I 00 N V^ O= w o V n cod �i.. O c h �7C) �L O=LL >a oU O N.� c a, IL L V) z O V) > w JOB # DATE 1 / 29 / 19 SHEET A A5 long sect SCALE:3/4'' = 1'-0' m m A5 cross sect Cf'AI P 4/d" 0 1U)" ADJ WD TRUSSES TO REMAIN EXITING APARTMENT AND WALL TO REMAIN +7,-6„ 2 ROOF +01, 1 1st FLOOR - 0 In w Lu w h w ry V) r- S () J J Q 00 0 N L Q 0 ON (D v u= S. G 0 N L ` i O C �7C) L O = , NONE c >a o" o 0 N N _ cu i- O, CL - JOB # DATE 1 / 29 / 19 SHEET m NO SLAB ❑0 3V) ad �3� 0 Otpa ZNZ oO<� <OZ t2z G �OUZm UOOO OH O�Lw 3U^� w�n0 A5 SCALE:3/4" = 1' Il,Pi`Il•: .1 1 EXISTING WD FRAME EXT WALL EXISTING FTG +7'-6" +0" 5/84; 4 5/8" 16GA 1 1/4"CORR.-, GALV MAS. ANCH 8"OC HORIZ / VERT FASTEN TO EXIST WD FRAME SHEATH'G W/ 1/4" X 2" HDG SCREW co1-­-]'\��VEWER FTQ LEDGE DPWELT XISTING X/ MASONRY VENEER ANCHORS STONE CAP W/ SLOPE TOP SET IN MASTIC W/ TIES BAS�FLASH'G W/ REGLET ND 4" CANT 4 z O �U O CD 2 • COURSE BOND BM W/ 5 CONT i 2" CANT AND DRIP CONT. W/ SINGLE PLY FULLY ADHERE :Oil 5 CONT AT LEDGER AND CANOPY COURSE SLOPE DN SINGLE PLY MEMBR FULLY ADHERE 3/4" PLYWD FULL W 10d SCREW NAIL 3" AT LEDGER 2X6 JST 24" OC 1 X6 T/G WD SOFFIT ESP ALUM WRAP W/ CONCEALED FASTENERS AND pISSIMILAR MTL SEP. J\ +7'-6" 2 ROOF 4" AND 6" 14GA C-JST W/ #8 SELF DRILL SCREWS 8" OC STAG. AND 2X4 BLK'G AS INDICATED W/ A23 CLIP TO 2X4 RAFTERS +0„ 1 1 st FLC -2' -1 Found; 2" CANT AND DRIP CONT. W/ BASE FLASH'G EXISTING SLOPE F TRUSS STRUCTURE EXISTING FLAT ROOF STIR CTURE--___,� +7'-6' —2LOQF ----- 2X4 TOP PLATE 16d NAIL 8" OC TO EXISTING HDR INFILL WALL AT PREVIOUS DR LOCATION (ALIGN W/ ADJACENT): HARDIBOARD SIDING TYVEK 5/8" PLYWD SHEATH'G R13 BATTINSUL 2X4 STUDS 16" OC GYPBD 2X4 PT SILL PLATE 1 /4" MAS SCREW 12" OC TO EXISTING CONC SLAB 1 1st F -1 F -2' SINGLE PLY TPO MEMBRANE FULLY ADHERE 3/4" PLYWD 2X12 JST 24" OC 1 X6 T/G WD SOFFIT RCA 335/68 W/ 8 - #10X3"/ 1 1/2" SCREW EA JST SISTER G/G OVERHANG 2X12 LEDGER W/ 2.1 /2" X 5" HDG LAG BOLTS TO EXISTING — — — — — — FLAT ROOF HEADER - FIELD VERIFY EXISTING CONT HDR ISTING ROOF, WALL W/ STRAPS JD WINDOW kUCTURE TO REMAIN EXISTING WALL W/ NEW IMPACT WINDOW IN SAME OPENING 2" CANT AND DRIP CONT. W/ SINGLE PLY TPO FULLY ADHERE ALUM WRAP W/ CONCEALED / FASTENERS - CUT RECESS F R +7'-6" 2X12 JST SET TO SOFFIT FIN FLUSH 2 ROOF TOP BM / A23 CLIP TO EXTEND LOWER FASCIA 3' 0" 1, 0„ 4" DIA STL PIPE COL SLOPE DN 1" r: +0 1 1st FLOOR 2' 1 Foundation L_ N 0 a O a. = AO W 6m 0 L i O y O O= a > a o OD N• c L E- -F- i O LU LU > W N W H LD JOB # DATE 1 / 29 / 19 Q 0 s A 6 .T a 0 'i FOOTING SCHEDULE TYPE DESCRIPTION T.O.F. 7 5/8" ° L 16" x 20" CONC MONO FT'G W/ 0'-0" O'O O p 3 • #5 CONT 3" CLR BOTT ° 30"W DBL PERIMETER WWM 8" x 10" CONC MONO FT'G W/ ® M o 45° 1 • #5 CONT -6 1 /2" > 3" CLR BOTT 8' 30"W DBL PERIMETER WWM EXISTING FTG 20"x 14" CONC MONO FT'G W/ VARIES 2 • #5 CONT D SEE FOUND PLAN FOR DOWELS v 4 3" CLR BOTT 6X6X10/10 WWM Foundation Plan TYPE DESCRIPTION T.O.F. SL GL DR RECESS N° - ` - 24" x 19" CONC THIN SLAB FT'G W/ 8 3 • #5 CONT AND 4' WIDE DB'L LAYER 6 X 6 10/10 WWF 0' 0" 5" 45° 3" CLR BOTT EXISTING FTG 8" x 8" CONC THKN SLAB FT'G W/ 1 0'-0" #5 CONT AND 12" #5 TRANS 48" OC SET INTO EXISTING FOOTING 6" DEPDXY 3" CLR BOTT 8" TYPE DESCRIPTION T.O.F. 24" x 12" CONC SPREAD FT'G W/ 2 D #5 CONT 3" CLR BOTT 1'-4" -IF- = STL COL 36' x 36" x 12" CONC PAD FT'G W/ 4 • #5 EA WAY Dv B. v •' °' o .:' 3" CLR BOTT v 0 3 O 0 LU LU w W Q o= J Q 0 N L Q 0 a 0 a 0 N U O O a D 4) Im 4) Q. y� W O= UM A, 06 W O H O o = •0 O C � > a � U U L 0 0 V) _ CL ILI- Z O LU JOB # DATE 1 / 29 / 19 SHEET &M i MSTA30 W/ PAN '7/54 /2 'EW F FLOW IF TOP VIEW OF BEAM /RAFTER AT CMU EXT. WALL SCALE: 3" = U-0" Roof Plan SCALE:1/4" = 1'-0" FAI EXIST'G ROOF STRUCTURE TO REMAIN. NEW ROOF TO BE /) PARALLEL SLOPE AS > EXISTING ROOF < �Z �o •. w - a ^O + N V Z �O ..W = n� O CMU PARAPET - WALL W/ 2.2X10 PT LEDGER LUS210 - _- FRAME OR TAPER INSUL VALLEY 2X10 BLK CONT MID SPAN CMU BRG BELOW W/ HETALI2 I EXISTING R I REMOVED ALIGN NEW ROOF SURFACE W/ EXISTI 11 1 I 1 2.1 L GANG o NAIL HEADER SPAN I 1 I I 1 1 j PKT DR BELOW O II /4 XI4 X5/16 X10" ITL q IL/ ANGLE EA SIDE 1 1 1 ry 4_/h{RU EA JVD- - - - Lu °° INSTALLATION OF KING\- 1 'HHTS20 OO POST DETERMINE AFTER II O DEMO d 1 2X10 RAFTLRS 24"13C 1 II O 2X10 BLK CONT I I I 1 1 1 z MID SPAN w NEW 2X4 WD FRAME BRG WALL OVER 1 EXISTING BRG WALL / 1 I I 1 UNDER ROOF 1 I. �-IHTS20 I 1 1 S21d 2X12 LEDGER W/ 3� 1 /4" DIA GALV WD SC E: INTO TRUSS FRAM'G 24" OC EXIST'G ROOF STRUCTURE & ROOFING TO REMAIN ECC44 WELD TO STL COL I 1 "�F 0. 1 1�� 1 11T1 1X 1 1 RAFTIRS 24"I0C 4 1 I 1 CMl1 ABOVE RO 1 1 1 1 (STEP BIOND W I IINRAITER I 1/2"HIG I} 1 1 I BOLT 1HRU --I---4C- OLI_ _ 1 2 • 911 /2' LUL - - G/G PM ANT 1 I 1 1 I�I I I I 1 1 1 1 1 I 2 1 9 1/2I•LVL�1 1-^""''1 G/G BM CONEI 1 1 1 1 I�I I I I �JI 2X10IBLK 16[OCI i I 3 BAYS CENTER OVEI WALI i I 1 I I 4 X 4 X1 /4 STL ANGLE LINTEL TO EXTEND CMU VENEER TO GABLE END m 0 0 N 0 U < < 6 c LEDGER CANT] —4.5/8" DIA X 7" EXP ANC - BOTH 1 SIDE OF BLDG CANTI 4/6" 14 GA C-JST CONT U 0 t 6 4/6" 14 GA o C-JST CONT 0 n - 4/6" 14 GA C-JST CONT TYP SYMBOL: RCA335/97 8 SCREWS CC44 WELD TO STL COL 2. 2X6 W/ 1/2" PLYWD G/G CONT. BM ** SEE A8 FOR DETAILS RCA335/68 W/8-#10 X 3" JST TO LEDGER- EXIST'G +/- 5" : 12" SLOPE DN 2. 2X6 W/ 1/2" PLYWD G/G CANTI. BM — CMU PARAPET WALL ALIGN W/ SEAMLESS VENEER U O__ _ v N CC44 WELD TO -STLCQL- N 1/4": 12" SLOPE DN �`II II I I ECC44 WELD TO II _ =STLCq -` II I i 3X3X1/4X7"STL ANGLE EA SIDE 2.1 /2" EXP CMU-2.5/8" THRU 2.28 W/ 1/2" PLYWD G/ CONT. BM 2• qX6 W/ 1/2" PLYWD G/ CONT. BM v x N N X N O < Z O Z < U A23 CLIP N� 11 2 �C 4 0000 JEI g SCREWS7 JST TO I II 1111 21 "Q(D 11- II LEDGER 8 SCREWS L ON 0 L J O H �� = : LL .O Ell -c i O U O `) _ O.� 0 ce - w Luj w 0 w L) JOB # Q DATE 00 1 SHEET 0 (V 1/29/19 Q A8 o U 2 X 10 BLKG BTWN RAFT RS 16" CC AT 2 X 10 BLKG BTWN RAFTERS 16" CC AT ADJAY W/ 2•#10 CENTER BAY EXT. TO INT. W/ A23 CLIPS TOE REW n ROOF SHEATHING A23 INSIDE BAY EA END 2• #10 TOE SCREW BLG OUTSIDE BAY FA FIND EXT w1STA30 W/ 3 PAN k #10 EA F ELOW IF 1 3/4' 2• #11tCRE CCT X10 ILAe eocP C4 i JPJ INT COLUMN HEAD SCALE: 3" = 1'-0" COLUMN JAMB SCALE: 3" = 1'-0" IEW OF BEAM / RAFTER �ERIOR WALL TYPICAL ROOF CONSTRUCTION: TPO FULLY ADHERE SINGLE PLY MEMBRANE 1/2" DENSE BOARD 5/8' CDX PLYWD SHEATHING W/ 10d SCREW NAILS 4" OC FIELD AND EDGE / GLUE TO RAFTERS 2 X 10 RAFTERS 24' OC R20 SPRAY FOAM INSUL 1X6 T/G CEILING FIN. FERS 16" CC AT 10 R 2AY .063 ALUM. BREAK MTL TRIM INT/EXT. W/ CONCEALED FASTENERS / MATCH WINDOW FIN SILICONE SEALANT SHIM TS6X3X5/ 16 W/ 2X6 SET IN ADH. AND 1/4" THRU BOLT 12" CC STAGGER - 3' FROM END CONT. SILICONE BEAD FOR VIBRATION .063 ALUM. BREAK MTL TRIM INT/EXT. W/ CONCEALED FASTENERS / MATCH WINDOW FIN ALUM WRAP BEYOND SAW CUT ROD TOPS FLUSH W/ NUT AND GROUT LEVEL 1 3/4" NETO�CONC. PORCH SLAB. I I 6 1/2" I II ALUM. BM WRAP 3 „ STL TUBE COL C 1 'All i TOP 2X4 NAILERS G/G FOR BRG SUPPORT OF RAFTER JT 11 1/4' LVL ANG NAILED 16" ST'L PLP /16' DIA. DLT HOLE DIA PIPE C( SX 3X 5/16 )L. NOTE: EXTERIOR STEEL COL TOP BUCKET ALL STEEL AFTER FABRICATION TO BE GRINDED AS NEEDED, CLEANED AND FACTORY PRIMED FOR SM PT FIN. SCALE: 3" = 1'-0" 3"X6" STL TUBE COL AND 10" X 9" X 5/8" ST'L BASE PLATE W/ BITUMINOUS COAT'G FULL/CONT. 1/4" FILLET WELD TO 5/8" THK STL PLATE 4 • 5/8" DIA. X 9" EPDXY SET THREADED ROD W/ NUT & WASHER STEEL COL BASE PLATE A ALL STEEL AFTER FABRICATION SCALE: 3" = 1'-0" TO BE GRINDED AS NEEDED, CLEANED AND FACTORY PRIMED FOR SM PT FIN. 1 TS6X3X 5/16 COL i i 9" X 9" X 5/8" ST'L BASE PLATE GROUT LEVEL AS NEEDED SAW CUT 1 1/2" INTO EXIST'G SLAB AND CHIP FLAT W/� CRACK'G EXIST'G FTG STEEL COL BASE PLATE A SCALE: 3" = 1'-0" STEEL COL BASE PLATE B SCALE: 3" = 1'-0" 5" DIA ST'L PIPE COL 10" X 10" X 5/8" ST'L BASE PLATE W/ BITUMINOUS COAT'G FULL/CONT. 1/4" FILLET WELD TO COL. 4 • 5/8" DIA. X 9" A.B W/ NUT & WASHER NOTE: ALL STEEL AFTER FABRICATION TO BE GRINDED AS NEEDED, CLEANED AND FACTORY PRIMED FOR SM PT FIN. �— 5" DIA 46 KSI ST'L COL -2 PART URETHANE SEALANT FULL PERIMETER 1/2" DENSE WRAP 1-7 ' � PIE,�IMETER 1-7 I D/'� O o 0 0, p o 1. -i_1�� EPDM WRAP PERIMETER ;LD Odoe Q Op o° Q pv O °D opOa 00 0 o 000 0o D op0 ° C n n ° I I X 1 1" X 5/8" ST'L BASE PLVFE W/ 8" O NONSHRINK LEVEL GROUT - COAT I ( CONT IN BITUMEN BELOW SLAB �4.5/8" DIA. X 9" A.B. W/ 2" HOOK O ' AND NUT & SHER o #5 TOP AND BOTT D ----�---SEE FOUND PLAN • • __� • j_� • • O D O F O I�C E_ Q —`� D e p o • ✓Op10 v e D° °d`DO �EO ° Op eO to p°a°a (� aDeO vie ° •��DOy—� p°O ° � °O r7 e °a ��C --�C(�--�) O ppg^O/DQ�,_.�,�`"'�°p•� � ° � ° h--�J°� p O �/—l/"�p�Ot�VDD°� 0 ° ° � ° D ° °� D� �p�/Q D . f /va� �.� � �� OD `� , pD�DOd D • ( f`/ V.-11 �8p � O j1 OD �DD�D STEEL COL BASE PLATE B SCALE: 3" = 1'-0" 0 s • M n t 0 O0 0 0 u u O ON V � cod N L ry O H C3-0 O = LL- .O v= D� O D °� CL O ILL O N w Qui O > f Lu w af JOB # DATE 1 / 29 / 19 Q 00 SHEET 0 (V A9 a 0 O