Loading...
HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATESPlanning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT _CONSTRUCTION -SOIL TREATMENT- - PERMIT #: BUILDER/CONTRACTOR: goe PEST CONTROL CONTRACTOR: SY54 PEST CONTROL LICENSE #: JB175775 St I , _"Y e Cotinty We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated; 00 Chemicals used: DOMINION 2L Percentage of solution: .05% Total gallons used: ec Date of Treatment: 445 201e Time of Treatment: 0 D Footing Slab 1st Treatment 1s` Treatment Re -Treat Re -Treat _Driveway Pools 1st Treatment 1t Treatment Re re Re -Treat Other O xxxxx Perimet for Final Inspection _�1�* Treatment Re -Treat / 07 re of Exterminator Date Note. There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistantjobsite posting board shall be provided to receive duplicate Treatment Certilicates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014 N planning & Development Services gaii➢ding & (Code (Regulation Division 2300 Virginia Ave SCANNED o o Fort Pierce, FL 34982 BY 772-462-2172 Fax 772-482-W3 St. Lucie Counti CERTIFICATE OF TERMITE TREATME CONSTRUCTION SOIL TREATMENT - PERMIT #: 02, & 91 JOB ADDRESS: �t 3i`1.S' 1 BUILDER/CONTRACTOR: PEST CONTROL CONTRACTOR: EMT -A --BUG TERMITE B PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites In accordance with the standards of the National Pest Control Association. Square feet if area treated: J140 U Percentage of solution: -05 Date of Treatment: llerf —&—Footl se Treatment Re -Treat Driveway ist Treatment _fie -Treat Other 15c Treatment Re -Treat Chemicals used: DOMINION 2L Total gallons used: 2Or,> Time of Treatment: p o D _Slab 1s` Treatment Re -Treat Pools 15� Treatment Re -Treat Perim ter for Final Inspection Si a e of Exterminator Date Note. There must be a completed form for each required treatment or re -treatment and this form mustbe on the job site to be picked up by the Inspector at time of each Inspection or the scheduled Inspection w111 fall and a re -Inspection fee charged. FOC164.2.6CertftateofProtective Treabnentforpreventlonoftermltes. Aweather resistantJobslteposting board shall be provided to receive duplicate Treatment CertlAcates as each required protective treatment Is completed, providing a copy for the person the permit Is issued to and another copy for the building permit tiles The Treatment Certlficate shall provide the product used, Identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to estabOsh a verifiable record of protective treatinent. If the soil chemical baffler method for termite prevention Is used, final exterior treatment shall be completed prior to final bullding approval. St Lucie (County requires for the final inspection for CO, a Permanent Sticker to One placed on the electrical panel box cover, listing all the treatments and dates of applications.