HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASE09-24-'19 09:00 FROM-
7728787656 y T-954
P0001/0002 F-593
ti��'�DiV3�Pc�tt
L .
RECEMD
SEP 2 4 2019
Permitting Department
St. Lucie County
Me
doAdtlrss. \� S SCAN
St. Lucie County
THE UNRFRSIGNED HEREBY REQUEST REUD SE OF ELECTRICAL POVA R TO THE ABOVE DESCMED
PROPERTY, FOR A PERIOD NOT Tp EaM THIRTY (30) QAIA FOR THE pURIIOSE OFTEMNG SYSi'56
AND EQLUPMENTIN PREPARATION FOR AFINAI:INSPECTICiN. IN CONSIDERATION 10FAPPROVAL OFTHE
A�UI_S?` vM: HERJ.%Y ACKNOi11 EDGE AND AGkEE'kS FOLLOM:
�... ThL&'twpardry Pbww r#;ease is.aGuesled for #tie abova sued Pwpmonty,afidthftvA ban
oe�ipari of any:iYDA,Oh6rldmn that peernitted [g. mi>$b'trdion dwing this time pisda
45iNiSi tip, our sighatures, Wee bOW agrea.Eb abide by'au tennsand corkMons of this agreement,
1ndt1dii5g.8uitding'DhdMon Fblicy, v&d-� is incorpdr3Eeci herein by referenow
3. A0 condrubns:and regWrern" Gs4bd m the a0obed doewlneot eriMed ^Repulre wts for 3o Day
Power far Tiesliitg" ham been fl>ifi W and the premise is Teddy fvr compriari6a.hmpecuon.
4. All requests for art eAtension b4md 30 days must be:made its wMhg to the Building pffi W slating
the reason `fvr the request. Power may be mmauedfiom the sde aWor a Stop W.orcOrdu issuediT
the Final hnspec#ion has dot been approved within 30'days, A iee'of $W0,60 wi0 be required tD tdt
the Stop Work Order.
WE HEREBY RELEASE -AND AMM TO HOLD HAftmmss ST, LUCIE 0OUNTY, AND THEIR S4P4(3 M FRDM
A14 LP8IE,11TES A�Vp.a"! •OF ANY TYPE OF �aAT W' UIYF1It H i4FAY ARC NQUt�:OR TIU THE RU7(JRE OUT
OFT t i YRAiV °iCTIQN, INCi:U!?IIUG AN�':IfiAMAG):11LVI ECK-MAY 8� iNO�1i M DUE TO• THE
DiSC011 NEL',i N OF ELECT 6LPOWFRiij'iHEe*j OF ML-VION OF THIS AGREMMEU.