Loading...
HomeMy WebLinkAboutSOIL NUCLEAR GAUGESoil Nuclear Gauge Client: AID Project: Report Date: 8/26/2019 Innovation Contracting, Inc. �� �"� 12757 19-5297.00 3595 N. Kings Highway �4ea<now•. Test Method: ASTM D 6938 P.O. BOX �,P��l Goy' Ft. Pierce, FL 34979 5 Ft Pierce, FL Pon St. w �e410 FBPECA#4930 601 NW Commodity Cove Por15t. Ludo. FL 34986 V Phone: 1']-M3575I Fax: 772-9243580 Test Results Test# Retest Of Test Date Proctor ID Method Soil Classification Optimum Moisture N%) Maximum Dry Density pc In Place Moisture °/ In Place Dry Density pe Probe Depth In Percent Compaction Min/Max Comp. N Remark 1 8121/19 P-1 N/A 11.0 115.9 8.8 109,9 12 97 951 105 Pass 2 8/21119 P-1 NIA 11.0 115.9 9,1 110.4 12 98 95/ 105 Pass 3 8/21/19 P-1 N/A 11.0 115.9 9.6 110.8 12 98 95/ 105 Pass 4 8121/19 P-1 N/A 11.0 115.9 9.0 112.7 12 100 951105 Pass 5 8/21/19 P-1 NIA 11.0 115.9 8.7 111.4 12 99 95/ 105 Pass Test Information Test # Test Location Elevation Reference Gauge Make I Model / SN / Calibrated Field Technician 1 Below Bottom of Footing: NE Comer 0-1' Troxler / T3440127974 / Liverman, Robert 2 Below Bottom of Footing: NW Comer 0-1' Troxler I T3440 127974 / Liverman, Robert 3 Below Bottom of Footing: SW Comer 0-1' Troxler / T3440127974 / Liverman, Robert 4 Below Bottom of Footing: SE Corner 0-1' Troxler/ T3440 / 27974/ Liverman, Robert 5 Below Bottom of Footing: Center 0-1' Troxler/T3440127974 / Liverman, Robert Remarks Comments Pass: Tests results comply with specifications Tests are'Direct Transmission° (Method A) unless probe depth is noted as °Backscatter'. Gauge calibration data on ale'wilh the testing agency. 3 M ilAN �o.......... NT , n r•r 1, Wile. �� .•' �tCENgF'•. * 7 �p tv o 63 8 0 C O o � 2612 hhKen,P.E. 'X_ �(DfegsioeaAfalBineepYt�?18 `�C r�-t• 3t��RPF�IQiteDP.•'•G��� TONAL P _ ® yS 1E.� rt Test Reports shall not be reproduced, except in full, without the written approval of GFA International Inc. Digitally signed printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. Page 1 of 1 Soil Nuclear Gauge Client: Project: OW Report Date: 812612019 Innovation Contracting, Inc. 19-5297.00 Test Method: ASTM D 6938 P.O. BOX 12757 3595 N. Kings Highway Part at. W41e Ft. Pierce, FL 34979 Ft Pierce, FL FBPECA94930 607 NW Commodity Cove Pon St Lode, FL 34986 Phone' 772-924-3575 1 Fax; 772-9243680 Test Results Test# Retest Of Test Date ProctorlD Method Soil Classification Optimum Moisture %) Maximum Dry Density pc In Place Moisture % In Place Dry Density ct) Probe Depth in Percent Compaction Min/Max Comp, N Remark 1 8121/19 P-1 N/A 11.0 115.9 8.8 109.9 12 97 951105 Pass 2 8/21119 P-1 N/A 11.0 115.9 9.1 110.4 12 98 951 105 Pass 3 8121119 P-1 N/A 11.0 115.9 9.6 110.8 12 98 951105 Pass 4 8121/19 P-1 N/A 11.0 115.9 9.0 112.7 12 100 951105 Pass 5 8/21119 P-1 NIA 11.0 115.9 8.7 111.4 12 99 95 / 105 Pass Test Information Test # Test Location Elevation Reference Gauge Make/ Model I SN / Calibrated Field Technician 1 Below Bottom of Fooling: NE Comer 0-1' Troxler I T3440127974 1 Liverman, Robert 2 Below Bottom of Footing: NW Comer 0.1' Troxler / T3440 / 27974/ Liverman, Robert 3 Below Bottom of Footing: SW Comer 0-1' Troxler / T3440 127974 / Liverman, Robert 4 Below Bottom of Footing: SE Comer 0-1' Troxler / T3440 / 27974 / Liverman, Robert 5 Below Bottom of Fooling: Center 0-1' Troxler / T3440127974 / Liverman, Robert Remarks Comments ' Pass: Tests results comply with specifications Tests are'Direct Transmission' (Method A) unless probe depth is noted as 'BackscatteP. Gauge calibration data on file wish Ne testing agency. rt 3 M n n fD to c " M O (D tD m C r=rt J Wom T m r� trt Test Reports shall not be reproduced, except in full, without the written approval of GFA International Inc. \`111il ll lr/ry/ 0 63 8. • 26/i P.E. �� (�firy _� �(Ofessi0sah''FavineerJ.218 YOI NA� E? Digitally signed printed copies,of this document are not considered signed and sealed and the signature must be verified on any electronic copies. Page 1 of 1