Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
EVALUATION REPORT
r, 0 ENGINEER EVALUATE EVALUATION REPORT Polyglass USA, Inc. 1111 West Newport Center Drive Deerfield Beach, FL 33442 (954)233-1230 TEST SCANNED BY St. Lucie County CONSULT NEMO l etc. Certificate ofAuthorization N32455 353 Christian Street, Unit #13 Oxford, CT 06478 (203)262-9245 CERTIFY Evaluation Report P32060.02.09-R24 FL5259-R28 Date of Issuance:02/24/2009 Revision 24: 01/24/2018 SCOPE: This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of construction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen, P.E. for use of the product under the Florida Building Code and Florida Building Code, Residential Volume. The products described herein have been evaluated for compliance with the E Ttl_on 3012 F ari a Buin_ I Go a sections noted herein. DESCRIPTION: Po ass Roo tUn er ayments LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted herein. CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s) changes, the referenced Quality Assurance documentation changes, or provisions of the Code that relate to the product change. Acceptance of this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. of any changes to the product(s), the Quality Assurance or the production facility location(s). NEMOietc. requires a complete review of this Evaluation Report relative to updated Code requirements with each Code Cycle. ADVERTISEMENT: The Evaluation Report number preceded by the words "NEMOietc. Evaluated" may be displayed in advertising literature. If any portion of the Evaluation Report is displayed, then it shall be done in its entirety. INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This Evaluation Report consists of pages 1 through 14. Prepared by: Robert J.M. Nieminen, P.E. Florida Registration No. 59166, Florida DC4 ANE1983 CERWICATION OF INDEPENDENCE: The facsimile seal appearing was authorized by Robert Nieminen, P.E. on 01/24/201& This does notserve as an electronically signed document 1. NEMOietc. does not have, nor does it intend to acquire or will it acquire, a financial interest in any company manufacturing or distributing products it evaluates. 2. NEMO I etc is not owned, operated or controlled by any company manufacturing or distributing products it evaluates. 3. Robert Nieminen, P.E. does not have nor will acquire, a financial interest in any company manufacturing or distributing products for which the evaluation reports are being issued. 4. Robert Nieminen, P.E. does not have, nor will acquire, a financial interest in any other entity involved in the approval process of the product. 5. This is a building code evaluation. Neither NEMOIetc nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically for that purpose. "NEMOletc. ROOFING COMPONENT EVALUATION: 1. SCOPE: Product Category: Roofing Sub -Category: Underlayment Compliance Statement: Roof Underlayments, as produced by Polyglass USA, Inc., have demonstrated compliance with the following sections of the 6 Eton 2 17►3F or) a Bur mgtCo a through testing in accordance with - the following Standards. Compliance is subject to the Installation Requirements and Limitations / Conditions of Use set forth herein. 2. STANDARDS: Section Pro a Standard Year 1504.3.1 Wind Uplift FM 4474 2011 1504.3.1 Wind Uplift UL 1897 2012 1507.2:3 / 1507.1.1 Physical Properties ASTM D226 2009 1507.2.4 / 1507.1.1,1507.2.9.2 Physical Properties ASTM D1970 2015 1507.3.3 Physical Properties FRSA/rRl April 2012 2012 1507.11.2 Physical Properties ASTM D6164 2011 1507.21.2 Physical Properties ASTM D6222 2011 TAS 110 Accelerated Weathering ASTM D4798 2011 3. REFERENCES.- KniiJbif Examination Reference Date FM Approvals (TST 1867) Wind Uplift 3004091 01/12/2000 PRI (TST 5878) Physical Properties PRI01111 04/08/2002 PRI (TST5878) Physical Properties PUSA-005-02-01 01/31/2002 PRI (TST5878) Physical Properties PUSA-013-02-01 12/23/2002 PRI (TST 5878) Physical Properties PUSA-013-02-02 12/23/2002 PRI (TST 5878) Physical Properties PUSA-013-02-03 12/23/2002 PRI (TST 5878) Physical Properties PUSA-019-02-01 07/14/2003 PRI (TST 5878) Physical Properties PUSA-028-02-01 07/13/200S PRI (TST 5878) Physical Properties PUSA-033-02-01 01/12/2006 PRI (TST5878) Physical Properties PUSA-035-02-01 09/29/2006 PRI (TST 5878) Physical Properties PUSA-055-02-02 12/10/20D7 PRI (TST 5878) Physical Properties PUSA-061-02-02 01/28/2008 PRI (TST 5878) Physical Properties PUSA-076-02-01 02/22/2008 PRI (TST5878) Physical Properties PUSA-083-02-01 04/14/2008 PRI (TST 5878) Physical Properties PUSA-088-02-01 07/29/2009 MTI (TST 2508) Physical Properties JX201-17A 04/01/2008 MTI (TST 2508) Physical Properties RX14E8A 01/29/2009 ERD (TST 6049) Physical Properties 11752.09.99-1 02/08/2000 ERD (TST 6049) Wind Uplift 11757.08.01-1 08/13/2001 ERD (TST 6049) Wind Uplift 11776.06.02 01/16/2003 ERD (TST 6049) Physical Properties 02200.07.03 07/14/2003 ERD (TST 6049) Wind Uplift P1740.01.07 01/04/2007 ERD (TST 6049) Physical Properties P5130.04.07-1 04/11/2007 ERD (TST 6049) Wind Uplift P9260.03.08 03/21/2008 ERD (TST 6049) Physical Properties P13450.08.09 08/13/2009 ERD (TST 6049) Wind Uplift P30540.11.09-R1 11/30/2009 ERD (TST 6049) Physical Properties P11030.11.09-1 11/30/2009 ERD (TST 6049) Wind Uplift P11030.11.09-2 11/30/2009 ERD (TST 6049) Physical Properties P13030.1LO9-3 11/30/2009 ERD (TST 6049) Physical Properties P33360.06.10 06/25/2010 ERD (TST 6049) Physical Properties P33370.03.11 03/02/2011 ERD (TST 6049) Physical Properties P33370.04.11 04/26/2011 ERD (TST 6049) Physical Properties P37300.10.11 10/19/2011 NEMO ETC, U.C. Evaluation Report P12060.02.09-R24 Certificate ofAuthodzotion p32455 6ie EDITION (2017) FBC NON-HVHZ EVALUATION FL5259-R29 Polyglass Roof Undedayments, (964) 233-2230 Revision 24:01/24/2018 Page 2 of 14 4. En_� ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6D49) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) [CC -ES (EVL 2396) Miami -Dade (CER 1592) Polyglass USA Polyglass USA Polyglass USA UL, LLC.(QUA9625) PRODUCT DESCRIPTION: Examination Physical Properties Physical Properties Physical Properties Wind Uplift Physical Properties Wind Uplift Wind Uplift Wind Uplift Wind Uplift Wind Uplift Physical Properties Physical Properties Physical Properties Physical Properties Physical Properties Physical Properties Physical Properties Physical Properties Physical Properties Physical Properties Physical Properties Physical Properties Physical Properties Wind Uplift Physical Properties Wind Uplift Physical Properties Physical Properties Physical Properties IBC Compliance HVHZ Compliance Manufacturing Affidavit P/L Affidavit Materials Affidavit Quality Control Reference P40390.08.12-1 P40390.08.12-2 C41420.09.12-3 P39680.03.13 P45370.04.13 P1738.02.07-R2 11757.04.01-1-R1 P41630.08.13 P11751.05.03-R1 P11781.11.03-R1 P45270.05.14 6020.07.14-1 6020.09.14-2 6020.09.14-3 6020.09.14-4 6020.09.14-5 6020.09.14-6 P46520.10.14 P43290.10.14 PLYG-SC7550.03.15 P40390.04.15 P44360.10.14-R1 PLYG-SC8080.05.15-1 PLYG-SC8905.05.16-1 PLYG-SC8080.07.16 PLYG-SC12025.10.16 PLYG-SC13040.12.16 PLYG-SC11900.03.17 PLYG-SC12115.08.17 ESR-1697 NOA 14-0717.08 Products Current Mule -Hide Cross Ltg Polystick SA Compound Service Confirmation ONEMOletc. Date 08/06/2012 08/07/2012 09/11/2012 03/04/2013 04/26/2013 04/29/2013- 04/30/2013 D8/06/2013 11/26/2013 11/26/2013 05/12/2014 09/08/2014 09/08/2014 09/08/2014 09/08/2014 09/08/2014 09/08/2014 10/03/2014 10/17/2014 03/24/2015 04/03/2015 05/18/2015 05/20/2015 05/17/2016 07/16/2016 10/12/2016 12/27/2016 03/10/2017 08/08/2017 11/01/2014 01/22/2025 02/18/2009 03/01/2008 08/18/2011 Exp.10/05/2018 4.1.1 Elastobase is a fiberglass reinforced, SBS modified bitumen base sheet. 4.1.2 Elastobase P is a polyester -reinforced, SBS modified bitumen base sheet. 4.1.3 Polyglass G2 Base is a fiberglass -reinforced, asphaltic base sheet. 4.1.4 Polyglass APP Base is a fiberglass -reinforced, APP modified bitumen base sheet. 4 2 , Self Adhering Underlayments '_ 4.2.1 Polystick MTS or Polystick MTS PLUS is a nominal 60-mil thick rubberized asphalt waterproofing membrane, glass fiber reinforced, surfaced with polyolefinic film surface; meets FRSA/1'RI April 2012. 4.2.2 Polystick IR-Xe is a nominal 60-mil thick rubberized asphalt waterproofing membrane, glass fiber reinforced, with an aggregate surface; meets ASTM D1970. 4.2.3 Polystick.TU Plus is a nominal 80-mil thick rubberized asphalt waterproofing membrane, glass fiber reinforced, with a polyester fabric surface; meets ASTM D1970 and FRSA/TRI April 2012. NEMO ETC, U.C. Evaluation Report P12060.02.09-1124 Cer0mie ofAufhomodon 032455 (P EDITION (2017)FBC NON-HVHZ EVALUATION F1.5259-1179 Polyglass RoofUnderlayments; (954) 233.1230 Revision 24:01/24/2018 Page 3 of 14 ONEMOletc. 4.2.4 Polystick TU P is a nominal 130-mil thick rubberized asphalt waterproofing membrane, glass-fiber/polyester reinforced, with a granular surface; meets FRSA/TRI April 2012. —) 4.2.5 4.2.6 Polyflex SAP, Polyflex SAP FR, Mule -Hide SA-APP Cap Sheet and Mule -Hide SA-APP Cap Sheet (FR) are polyester reinforced, APP modified bitumen cap sheets; meet FRSA/TRI April 2012. - 4.2.7 Polystick Dual Pro"' is a nominal 60-mil thick dual -layer rubberized asphalt waterproofing membrane, fiberglass reinforced, with a polyester fabric surface; meets ASTM D1970. 4.2.8 Polystick Tile Pro'" is a nominal 60-mil thick dual -layer rubberized asphalt waterproofing membrane, fiberglass reinforced, with a polyester fabric surface; meets ASTM D1970 and FRSA/TRI April 2012. 4.2.9 Polystick MU-X is a nominal 54-mil thick dual -layer rubberized asphalt waterproofing membrane, fiberglass reinforced, with a polypropylene film surface; meets AC188 and physical requirements of ASTM D1970 (See Section 5.8). 4.3.1 Elastoflex G TU is a polyester reinforced, modified bitumen tile underlayment composed of a sand -surfaced SBS modified bitumen back -side and granule -surfaced APP modified bitumen top -side. Elastoflex G TU is for use as an alternate to "Mineral Surface Roll Roofing" (ASTM D6380, Class M) in the "Single Ply System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened tile roof systems or Hot Asphalt applied "Cap Sheet" in the 'Two Ply System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened or adhered tile roof systems. 4.3.2 Elastoflex 56 G and Elastoflex S6 6 FR are polyester reinforced, SBS modified bitumen cap sheets; meet ASTM D6164. Elastoflex S6 G and Elastoflex S6 G FR are for use as an alternate to "Mineral Surface Roll Roofing" (ASTM D6380, Class M) in the "Single Ply System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened tile roof systems. Elastoflex S6 G is for use as an alternate to Hot Asphalt applied "Cap Sheet" in the 'Two Ply System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened or adhered file roof systems. Elastoflex S6 G FR is for use as an alternate to Hot Asphalt applied "Cap Sheet" in the 'Two Ply System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened tile roof systems. 4.3.3 Polyflex G and Polyflex G FR are polyester reinforced, APP modified bitumen cap sheets; meet ASTM D6222. Polyflex G is for use as an alternate to Heat Applied "Cap Sheet" in the 'Two Ply System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened or adhered file roof systems. Polyflex G FR is for use as an alternate to Heat Applied "Cap Sheet" in the 'Two Ply System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened tile roof systems. S. WiTATioNs: 5.1 This is a building code evaluation. Neither NEMO)etc. nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically for that purpose. 5.2 This Evaluation Report is not for use in the HVHZ 5.3 Fire Classification is not part of this Evaluation Report; refer to current Approved Roofing Materials Directory for fire ratings of this product 5.4 Polyglass Roof Underlayments may be used with any prepared roof cover where the product is specifically referenced within FBC approval documents. If not listed, a request may be made to the Authority Having Jurisdiction for approval based on this evaluation combined with supporting data for the prepared roof covering. MEMO ETC, LLC. Evaluadon Report P12060.02A9-R24 rertificote ojAuthanration#32455 6r"EDMON(2027)FOC NON-HVHZ EVALUAT1oN FL5259-R29 Polyglass Roof Underlaymentr, (954) 233-1230 Revision 24: 01/24/2018 Page 4 of 14 NNEMOjetc. 5.5 Allowable Roof Covers: ABLE ROOF COVER OPnONS Underlayment Asphalt Shingles Nail -On Tile Foam -On Tile Metal Wood Shakes & Shingles Slate Elastobase Yes Yes (Base Sheet in 2-ply system) Yes (Base Sheet in 2-ply system) Yes Yes Yes _ Elastobase P Yes -Yes (Base Sheeting-plysystem) Yes (ease5heetin2-plysystem) Yes Yes Yes Polyglass G2 Base No Yes IBase Sheetin 2-pNsYxtem) Yes Iaase Sheatin 2ylysystem) No No No Polyglass APP Base No Yes (Base Sheet in2-plysystem) Yes (Base Sheet In 2-oysymm) No No No Polystick MTS or MTS PLUS Yes Yes No Yes Yes Yes Polystick lR-Xe Yes No No No Yes Yes Polystick TUP No Yes Yes (See55.1) No No No Polystick TU Plus Yes Yes Yes (see 5.5.1) Yes Yes Yes ey_LL_j_,_I_ ax No Yes (See 5.5.1) Yes No No Polystick Dual Pro Yes No No Yes Yes Yes Polystick Tile Pro Yes Yes Yes (See 5.5.1) Yes Yes Yes Polystick MU-X Yes No No Yes Yes Yes Elastoflex S6G Yes Yes Yes (See5.5.1) No Yes Yes Elastoflex S6 G FR Yes Yes No No Yes Yes Elastoflex GTU Yes Yes Yes (See 55.1) No Yes Yes PolyflexG Yes Yes Yes (See 55.1) No Yes Yes PolyflexG FR Yes Yes No No Yes Yes Polyflex SAP or SAP FR Yes Yes Yes (See 5.5.1) No Yes Yes Mule -Hide SA-APP Cap Sheet or SA-APP Cap Sheet (FR) yes Yes Yes (See 5.5.1) No Yes Yes 5.5.1 "Foam -On Tile" is limited to use of the following Approved tile adhesives / underlayment combinations. :.TABLE -A: ALLOWABLE TILEA0HESiiE1, LND6LAYNIEHT-COMBINATLONSl Adhesive Florida Product Approval Underlayments DAP Foam Touch 'n Seal StarmBond Roof Tile Adhesive FL14506 Polystick TU Plus, Polystick TU Max Dow Tileliond"' FL22525 Polystick TU P, Polystick TU Plus, Polyflex SAP or Tile Pro Polystick TU P, Polystick TU Plus, Polystick TU Max, Polystick Tile Pro, ICP Adhesives Polyset® AH-160 FL6332 Elastoflex G TU, Elastoflex S6 G, Polyflex G, Polyflex SAP, Polyflex SA Cap FR, Mule -Hide SA-APP Cap Sheet or Mule -Hide 5A-APP Cap Sheet (FR) Polystick TU P, Polystick TU Plus, Polystick TU Max, Polystick Tile Pro, ICP Adhesives Polyset® RTA-1 FL6276 Elastoflex G TU, Elastoflex S6 G, Polyflex G, Polyflex SAP, Polyflex SA Cap FR, Mule-Hlde SA-APP Cap Sheet or Mule -Hide SA-APP Cap Sheet (FR) 'Refer to 771e Manufacturer's orAdhesive Manufacturers Florlda ProductApproval for Overturning Moment Resistance Performance. NEMO ETC, LLC. Evaluation Report P12060.02.09-R24 CetejswteofAuthorlmtion N32455 6s"EDITION (2017)FEC NON-HVHZ EVALUATION FL5259-R28 Polyglass Roof Underlayments, (954) 233-1230 Revision 24: 01/24/2018 Page 5 of 14 ONEMO I etc. 5.6 Allowable Substrates: —> 5.6.1 Irect-Bon to: ec Polystick (all variations), Dual Pro, Tile Pro, Polyflex SAP or SAP FR, Mule -Hide SA-APP Cap Sheet or SA-APP Cap Sheet (FR) self -adhered to: ➢ New untreated plywood; ASTM D41 primed new untreated plywood; Existing plywood; ASTM D41 primed existing plywood; New or existing, unprimed. OSB;_ASTM D41 primed-OSB; Souther Yellow Pine; ASTM D41 primed southern Yellow Pine; ASTM D41 primed structural concrete; Huber Engineered Woods '21P System" Panels (designed and installed to meet wind loads for project). Note: Polyglass does not require priming of new or existing plywood or OSB sheathing. New or existing plywood or OSB sheathing should be cleaned of all dirt and debris prior to application of Polystick membranes. Elastoflex G TU, Elastoflex S6 G or Elastoflex S6 G FR in hot asphalt to: ➢ ASTM D41 primed structural concrete. Polyflex G or Polyflex G FR torch -applied to: ➢ ASTM D41 primed structural concrete. 5.6.2 Bond -to -Insulation: Polystick (all variations), Polyflex SAP or SAP FR, Mule -Hide SA-APP Cap Sheet or SA-APP Cap Sheet (FR) self -adhered to: ➢ ASTM C1289, Type 11, Class 1 polyisocyanurate or Type V polyisocyanurate-composite insulation; Dens Deck DuraGuard; Dens Deck Prime; or SECUROCK Gypsum -Fiber Roof Board. Elastoflex G TU, Elastoflex S6 G or Elastoflex S6 G FR in hot asphalt to: ➢ Dens Deck Prime or SECUROCK Gypsum -Fiber Roof Board. Polyflex G or Polyflex G FR torch -applied to: ➢ ASTM D41 primed structural concrete; Dens Deck Prime or SECUROCK Gypsum -Fiber Roof Board. For installation under mechanically attached prepared roof coverings, insulation shall be attached per minimum requirements of the prepared roof covering manufacturer's Product Approval. For installations under foam -on tile systems, insulation attachment shall be designed by a qualified design professional and installed based on testing of the insulation/underlayment system in accordance with FBC Section 1504.3.1. 5.6.3 Bond to Mechanically Attached Base Laver: Polystick (all variations), Polyflex SAP or SAP FR, Mule -Hide SA-APP Cap Sheet or SA-APP Cap Sheet (FR) Dual Pro or Tile Pro self -adhered to: ➢ ASTM D226, Type I or II felt; Elastobase; Elastobase P or Mule -Hide Nail Base. Elastoflex G TU, Elastoflex S6 G or Elastoflex S6 G FR in hat asphalt to: ➢ ASTM D226, Type I or 11 felt; Elastobase; Elastobase P, Mule -Hide Nail Base or Polyglass G2 Base. Polyflex G or Polyflex G FR torch -applied to: ➢ Elastobase; Elastobase P, Mule -Hide Nail Base, Polyglass G2 Base or Polyglass APP Base. For installations under mechanically attached prepared roof coverings, base layer shall be attached per minimum codified requirements. For installations under foam -on tile systems, base layer shall be attached per minimum requirements of FRSA/TRI April 2012 (04-12), Appendix A, Table 1, or as listed in Section 5.6.4 herein, or as tested in accordance with FBC Section 1504.3.1. NFmo ETC,reVf I.I.C.Evaluation Report P12060.02.09-R24 [eroJlmreolauthomaoon p32455 6'"EDITION(2017)F8C NON-HVHZ EVAWATION Ft5259-R28 Poiyglass Roof Undedayments; (954) 233-ISO Revision 24: 01/24/2018 Page 6 of 14 NNEMOjetc. 5.6.4.2 For mechanically attached Base Sheet, the maximum design pressure for the selected assembly shall meet or exceed that required under FRSA/TRI April 2012 (04-12), Appendix A, Table 1A. Alternatively, the maximum design pressure for the selected assembly shall meet or exceed the Zone 1 design pressure determined in accordance with FBC 1609. In this case, Zones 2 and 3 shall employ an attachment density designed by a qualified design professional to resist the elevated pressure criteria. Commonly used methods are ANSI/SPRI WD1, FM Loss Prevention Data Sheet 1-29 and Roofing Application Standard_RAS 117. Assemblies marked — with an asterisks carry the limitations set forth in Section 2.2.10.1 of FM Loss Prevention Data Sheet 1-29 (January 2016) for Zone 2/3 enhancements. 5.7 xoosure Imltatlons: Elastobase, Elastobase P, Polyglass G2 Base or Polyglass APP Base shall not be left exposed for longer than 30-days after installation. Polystick IR-Xe or Polystick MU-X shall not be left exposed for longer than 90-days after installation. (P,o ysdc _ S MTS I L SSTUfP,7iTUtP us, PD7Max, ua Pro, I e pro or Elasio ex a!G s a not e e emftT—5seUVo'r'1 Polyflex SAP or SAP FR, or Mule -Hide SA-APP Cap Sheet or SA-APP Cap Sheet (FR) does not have an exposure limitation, unless the prepared roof covering is to be adhesive -set tile, in which case the maximum exposure is 30 days. Elastoflex S6 G or Elastoflex S6 G FR or Polyflex G or Polyflex G FR does not have an exposure limitation, unless the prepared roof covering is to be adhesive -set tile (Elastoflex S6 G or Polyflex G only), in which case the maximum exposure is 180 days. 5.8 Polystick MU-X has been found through comparative testing to have a lesser coefficient of friction than ASTM D226 roofing felt in a dry condition, tested at standard laboratory conditions. Agreement between purchaser and seller, as set forth in Section 4.3, Note 1 of ASTM D1970-15, should be established as to slip resistance. 5.9 Tile Slippage Limitations (FRSA/FRI April 2012 (04-12)): When loading roof tiles on the underlayment in direct -deck tile assemblies, the maximum roof slope shall be as follows. These slope limitations can only be exceeded by using battens during loading of the roof tiles. - ''1'ABLE2 TILESUPPAGE LIMITATIONS FOR .DIRECr-DEOC TILE INSTALUITIONS ^; - Underlayment Tile Profile Staging Method Maximum Slope Elastoflex G TU Flat 10-tile stack 7:12 Lugged 8-tile stack (6 over 2) 6:12 Elastoflex S6 G or S6 G FR Flat or lugged 6-tile stack (4 over 2) 4:12 Polystick MTS or MTS PLUS Flat 6-tile stack (4 over 2) 5:12 Lugged 6-tile stack (4 over 2) 4:12 Polystick Tile Pro Flat or Lugged 6-tile stack (4 over 2) 712 Polystick TU Max Flat 6-tile stack (4 over 2) or 30-tile stack 7:12 Lugged 6-tile stack (4 over 2) 7:12 0 ugg.. 0-Me stac :12 Polystick TUP Flat 6-tile stack (4 over 2) 6:12 Lugged 6-tile stack (4 over 2) 4:12 Polystick TU Plus Flat or Lugged 6-tile stack (4 over 2) 7:12 Flat or Lugged 10-tile stack 6.12 Polyflex G or G FR Flat or Lugged 6-tile stack (4 over 2) 4:12 Polyflex SAP or SA P FR Fiat or Lugged 6-tile stack (4 over 2) 14:12 NEMO ETC, LLC Evaluation Report P12060.02.09-R24 [erNfimte ofAuthonzation g32455 6'EDITION(2017)FBC NON-HVHZ EVALUATION FL5259-RZS Polyglass Roof Umfedayments, (954) 733-1230 Revision 24:01/24/2018 Page 12 of 14 "NEMOletc. 6. INSTALLATION: 6.1 Polyglass Roof Underlayments shall be installed in accordance with Polyglass published installation requirements subject to the Limitations set forth in Section 5 herein and the specifics noted below. 6.2 Re -fasten any loose decking panels, and check for protruding nail heads. Sweep the substrate thoroughly to remove any dust and debris prior to application, and prime the substrate (if applicable). 6.3.1 Shall be installed in compliance with the codified requirements for ASTM D226, Type II underlayment in FBC Table 1507.1.1 for the type of prepared roof covering to be installed. Elastobase, Elastobase P or Mule -Hide Nail Base may be covered with a layer of Polystick, Polyflex SAP, Polyflex SA P FR, Mule -Hide SA-APP Cap Sheet or SA-APP Cap Sheet (FR), self -adhered, Elastoflex G TU, Elastoflex S6 G or Elastoflex S6 G FR in hot asphalt or Polyflex G or Polyflex G FR, torch applied. Roof cover limitations are those are those associated with the top -layer underlayment, as set forth in Table 1. 6.3.2 Tile Applications: Elastobase, Elastobase P or Mule -Hide Nail Base are limited to use as a mechanically attached base sheet in the "Two Ply System" from FRSA/TRI April 2012 (04-12). Reference is made to Table 1 and Section 5.6.4 herein, coupled with FRSA/TRI April 2012 (04-12) Installation Manual. 6 4 o Ic TS, MTS PLUS, IR Xe,',Tll P, TU Plu4 ,Dual Pro, Tile Pro or MU=X or PobA SAP, Polyflez SAP FR tdeISAAPPCap'SheetorMule-Hide§A-A - p_Sheet(FR): _ _ - 6.4.1 Shall be installed In compliance with the codified requirements for ASTM D1970 (except Polystick TU P) underlayment in rou 1 ame ibu7.1 i Tor the type of prepared root covering to be installed. 6.4.2 Direct -to -Deck with Mechanically Fastened Roof Covers: All self -adhering materials, with the exception of Polystick TU Plus, Polyflex SAP or SAP FR and Mule -Hide SA-APP Cap Sheet or SA-APP Cap Sheet (FR) s au j_ ei ac.-nai. a ;raise Re;e ee seamrinraccar ante, r ,o ve as'l--1 s�/s'ili,IP nailed using the above noted fasteners and spacing, membrane. The head lap membrane is to cover All seal -lap seams (selvage laps) must be firmly rolled with a minimum 28 lb. hand roller to ensure full contact and adhesion. For Dual Pro and Tile Pro, align the edge of the top sheet to the end of the glue pattern (the sheet will overlap the fabric). aTminimtfm rate ofF]2"do''c9 Polystfck TU Pius should be back - in area marked "nail area, area para clavar" on the face of wew of Ovelap Seam of Dual Pro and Tile Pro All over -fabric and over -granule end -laps shall have a 6-inch wide, uniform layer of Polyplus 50 Premium Modified Wet/Dry Cement or Polyglass PGS00 Modified Cement applied in between the application of the lap. Polystick TU Plus, Dual Pro and rile Pro may not be used in any exposed application such as crickets, exposed valleys, or exposed roof to wall details NEMO ETC, U.C. Evaluation Report P32060.0209-RZ4 Certifimte of Authodzution#32455 6n'EDITION (2017)FBC NON-HVHZ EVALUATION FI5259-R28 Polyglass Roof Underlayments,, (954) 233-1230 Revision 24:01/24/2018 Page 12 of 14 ONEMOletc. Repair of Polystick membranes is to be accomplished by applying Polyplus SO Premium Modred Wet/Dry Cement or Polyglass PG500 Modred Cement to the area in need of repair, followed by a minimum 6 x 6 inch patch of the Polystick material of like kind, set and hand rolled in place over the repair area. Patch laps, if needed, shall be installed in a watershedding manner. All Polystick membranes shall be installed to ensure full contact with approved substrates. Polyglass requires a minimum of 40-lb weighted -roller or, on steep slopes, use of a stiff broom with approximately 40-lbs of load applied for the field membrane. Hand rollers are acceptable for rolling of patches, laps (min. 28 lb roller) or small areas of the roof that are not accessible to a large roller or broom. 6.4.3 Tile Applications (not allowed for PolvstfckDual Pro, /R-XeorPolystick M", Reference is made to FRSA/TRI April 2012 (04-12) Installation Manual and Table 1 herein, using the instructions noted above as a guideline. For mechanically fastened tile roofing over 2-ply system, consisting of Base Sheet and self -adhering top sheet(s), Base Sheet fastening shall be not less than FRSA/TRI April 2012 (04-12), Table 1. For adhesive -set tile applications, refer to Section 5.6.4 herein. 6.4.4 Two (2) Ply Underlavment Systems, Polystick MTS or MTS PLUS followed by Polystick MTS, MTS PLUS, TU P, TU Plus, TU Max, Tile Pro, MU-X or Polyflex SAP is allowable for use under mechanically attached prepared roof systems. Limits of use are those associated with the top -layer material. This is not a requirement, but is allowable if a 2-ply underlayment system is desired. Polystick MTS or MTS PLUS followed by Polystick TU P, TU Plus, TU Max, Tile Pro or Polyflex SAP is allowable for use under foam -on tile systems. limits of use are those associated with the top -layer material. This is not a requirement, but is allowable if a 2-ply underlayment system is desired. 6.5.1 Elastoflex G TU, Elastoflex S6 G or Elastoflex S6 G FR shall be Installed In compliance with current Polyglass published installation requirements. For use in file applications: ✓ Elastoflex G TU is for use as an alternate to "Mineral Surface Roll Roofing" (ASTM D6380, Class M) in the "Single Ply System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened tile roof systems or the Hot Asphalt applied "Cap Sheet" in the "Two Ply System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened or adhered tile roof systems. ✓ Elastoflex S6 G is for use as an alternate to "Mineral Surface Roll Roofing" (ASTM D6380, Class M) in the "Single Ply System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened tile roof systems or the Hot Asphalt applied "Cap Sheet" in the `Two Ply System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened or adhered tile roof systems. ✓ Elastoflex S6 G FR is for use as an alternate to "Mineral Surface Roll Roofing" (ASTM D6380, Class M) in the "Single Ply System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened tile roof systems or the Hot Asphalt applied "Cap Sheet" in the "Two Ply System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened the roof systems. 6.5.2 For hot -asphalt -applications, Elastoflex G TU, Elastoflex S6 G or Elastoflex S6 G FR shall be fully asphalt -applied to the substrates noted in Section 5.6. Side laps shall be minimum 3-inch and end -laps minimum 6-inch wide, off -set minimum 3 feet from course to course. Side and end laps shall be fully adhered in a complete mopping of hot asphalt with asphalt extending approximately 3/8-inch beyond the lap edge. `.6 6 Polyflex G(or_06"ex G'FR - 6.6.1 Polyflex G or Polyflex G FR shall be installed in compliance with current Polyglass published installation requirements. For use in tile applications: ✓ Polyflex G is for use as an alternate to the Heat Applied "Cap Sheet" in the "Two Ply System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened or adhered tile roof systems (Base Sheet Limited per 5.6.3). ✓ Polyflex G FR is for use as an alternate to the Heat Applied "Cap Sheet" in the "Two Ply System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened file roof systems (Base Sheet Limited per 5.6.3). NEMO ETC, U.C. Evaluation Report P12060.02.09•R24 CeOcoteojAuthoraaoon 932455 6'"EDITION (2017)FBC NON-HVHZ EVALUATION F1.5259-1128 PoWlass Roof Underlayments, (954) 233-1230 Revision 24: 01/24/2018 Page 13 of 14 NNEMOjetc. 6.6.2 Polyflex G or Polyflex G FR shall be fully torch -applied to the substrates noted in Section 5.6. Side laps shall be minimum 3-inch and end -laps minimum 6-inch wide, off -set minimum 3 feet from course to course. Side and end laps shall be fully heat -welded and inspected to ensure minimum 3/8-inch flow of modified compound beyond the lap edge. 6_7 TileStaginx: 6.7.1 Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the underlayment. Refer to Table 2 herein, and Polyglass published requirements for tile staging. 6.7.2 Battens and/or Counter -battens, as required by the tile manufacturer and FR5A/TRI April 2012 (04-12) must be used on all roof slopes greater than 7:12. Precautions should be taken as needed, such as the use of battens or sail- boards, to prevent tile sliding and/or damage to the underlayment during the loading process. 6.7.3 Polyglass specifies the minimum cure time after installation of self -adhering membranes and before loading of roofing tiles is forty-eight (48) hours. 7. BUILDING PERMIT REQUIREMENTS: As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of this product. 8. MANUFACrURING PLANTS: Contact the noted CIA agency for information on product locations covered for F.A.C. 61G20-3 CIA requirements. The following plants have qualified products under their respective physical Drooerties soecifirationc. 9. Specification Product s Fernley, NV, Hazleton, PA & Winter Haven, FL Hazleton, PA ASTM D1970 M-D 13-0004 Polystick MU-X Elastoflex G TU Hazleton, PA & Winter Haven, FL Tuscaloosa, AL ASTM D1970 Polystick IR-Xe ASTM D1970 & FRSA/TRI April 2022 Polystick TU Plus ASTM D1970 & FRSA/TRI April 2012 ASTM D4601, Type II Polystick TU Max Polyglass G2 Base Winter Haven, FL m Aeo,oew2 Auer e..T,..,. ASTM D226 (physicals) Elastobase, Elastobase P ASTM D6509 Polyglass D. Base FRSA/rRI April 2012 Polystick MTS, Polystick MTS PLUS FRSA/TRI April 2012 Polystick TUP FRSA/TRI April 2012 POlyflex SAP, Polyflex SA P FR ASTM D1970 Polystick Dual Pro ASTM D1970 & FRSA/TRI April 2012 Polystick Tile Pro ASTM D6164 Elastoflex S6, Elastoflex S6 G FR ASTM D6222 Polyflex G, Polyflex G.FR UL, LLC—QUA9625; (314) 578-3406; k.chancellar@us.ul.com NEMO ETC, LLC. - END OF EVALUATION REPORT - Cer0fcate Of Avfhorirntlun#32455 rx Evaluation Report P12060.02.09•R24 6 EDITION ofUn FBCNON-RVHZ EVALUATION Evaluation Potyglass RoofUndedayme ;(954)2;3-]23D Revision 24:01/24/201S Page 14 of 14 TRINITY I ERD EVALUATION REPORT 1'� INTCGRA R O O F T I L E Entegra Roof Tile, LLC 1289.NE 9th Avenue Okeechobee,FL34972 (602)515-6933 EXTERIOR RESEARCH & DESIGN, LLC. Cerilficate of Authorization 89503 353 CHRISTIAN STREET, UNIT#13 OXFORD, CT 06478 (203) 262-9245 Evaluation Report E39310.11.11-1-R4 FL7804-R10 Date of Issuance: 21/02/2011 Revision 4:10/17/2017 SCOPE: This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of construction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen, P.E. for use of the product under the Florida Building Code and Florida Building Code, Residential Volume. The products described herein have been evaluated for compliance with the©(EIItlon ZTW Fon aca E@1 Ina C.R H(( Z sections noted herein. KINNE® DESCRIPTION: (Entegl'a Concrete Rooter i es HVHZyuns tctrons St. Lucie County LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted herein. CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s) changes, the referenced Quality Assurance documentation changes, or provisions of the Code that relate to the product change. Acceptance of this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product changes or the referenced Quality Assurance documentation changes. Trinity[ERD requires a complete review of this Evaluation Report relative to updated Code requirements with each Code Cycle. ADVERTISEMENT: The Evaluation Report number preceded by the words 'Trinity( ERD Evaluated" may be displayed in advertising literature. If any portion of the Evaluation Report is displayed, then it shall be done in its entirety. INSPErnON: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This Evaluation Report consists of pages 1 through 8. Prepared by: Robert J.M. Nieminen, P.E. Florida Registration No. 59166, Florida DCA ANE1983 The ras -sealaPpearbgwas auNa by Robert N[e.I., P.E en 10/1T/2017. Thb does mturveaz anehttwNOYy signM donne Stgned,—� h-IdWies have been transmitted to the Pmdu AoomwiAdMnN"ateraM.,M gun aM e CERTIFICATION OF INDEPENDENCE: I. Triniity(ERD does not have, nor does it intend to acquire or will it acquire, a financial Interest In any company manufacturing or distributing products it evaluates. 2. Triniityl ERD is not owned, operated or controlled by any company manufacturing or distributing products it evaluates. 3. Robert Nieminen, P.E. does not have nor will acquire, a financial interest in any company manufacturing or distributing products for which the evaluation reports are being issued. 4. Robert Nieminen, P.E. does not have, nor will acquire, a financial interest in any other entity involved in the approval process of the product. 5. This is a building code evaluation. Neither TriniitylERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically for that purpose. 4TKINITYIERD ROOFING SYSTEM EVALUATION: 1. SCOPE: Product Category: Roofing Sub -Category. Roofing Tiles Compliance Statement: Entegra Concrete Roof Tiles, as produced by Entegra Roof Tile, LLC, have demonstrated compliance with the following sections of the Florida Building Code through testing in accordance with the following Standards. Compliance is subject to the Installation Requirements and Limitations / Conditions of Use set forth herein. 2. STANDARDS: Section Pro a Standard Year 1523.6.5.2 Physical Properties TA5112 1995 1523.6.5.2 Wind Driven Rain TA5100 1995 1523.6.5.2.2 Static Uplift Resistance TAS 101 1995 1523.6.5.2.3 Static Uplift Resistance TA5102 1995 1523.6.5.2.3 Static Uplift Resistance TAS 102(A) 1995 3. REFERENCES: Entity Examination Reference Date ERD(TST6049) TA5101 P39740.02.12 02/21/2012 ATL(TST3782) Physical Properties RT0624.05-14 07/03/2014 ATL(TST3782) Physical Properties RT0624.04-14 07/07/2024 ATL(TST3782) Physical Properties RT1210.02-15 12/17/2015 ATL(TST3782) Physical Properties RT1210.03-15 12/17/2015 ATL (TST 3782) Physical Properties RT1103.01-15 11/07/2015 ATL (TST 3782) Physical Properties RT3103.02-15 21/07/2015 ATL (TST 3782) Physical Properties RT1103.03-15 11/07/2015 ATL (TST 3782) Physical Properties RT1103.04-15 11/07/2015 ATL(TST 3782) Physical Properties RT1103.05-15 11/07/2015 Miami-Dade(CER1592) HVHZ Compliance 14-0416.12 11/27/2014 Miami -Dade (CER1592) HVHZ Compliance 15-0721.04 11/05/2015 Miami-Dade(CER1592) HVHZCompliance 16-0112.06 02/25/2016 Miami-Dade(CER1592) HVHZ Compliance 16-0112.07 02/25/2016 Miami-Dade(CER1592) HVHZ Compliance 16-0112.08 02/25/2016 Tile Roof institute TAS 200, TAS 101, 102, 102(A) Membership Confirmation Current PRI (QUA9110) Duality Assurance Service Confirmation Exp.11/02/2018 Exterior Research and Design, LLC Evaluation Report E39310.11.11-1-R4 Certlrrote o/Authoraadan Ass04 6'"EDITION(2017) FRC HVHZ EVALUATION FL7804-R10 Entegra Roof Tiles Revision 4:10/17/2017 Page 2 of 8 4. PRODUCT DESCRIPTION: L I 16• 1-va• 10•, / Y 1 16'-1 -F B- L lo•\ / Y Bermuda Flat 13" 17-114" Horizon Flat 4T'-'RINITYIERD (-P antatlan F a Exterior Research and Design, LLC. Evaluation Report E39310.1L31-1-R4 Certificate olAutharbaticn#903 6'" EDITION 120171 FBC HVHZ EVALUATION FL7804-R10 Entegra Roof Tiles Revision 4: 10/17/2017 Page 3 of \,]\T-PJNITYI ERD S. UmrrATONs: 5.1 This is a building code evaluation. Neither TrinitVIERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically for that purpose. 5.2 This Evaluation Report is for use in FBC HVHZ jurisdictions or others adopting FBC HVHZ requirements. 5.3 Fire classification is not part of this evaluation; refer to FBC 1516 or -listing by an approved testing agency for fire rating of this product. 5.4 Reference is made to FBC 152.4.2.4 regarding field testing of completed tile roof installations. 5.5 Applicant shall retain the services of an FBC listed, accredited laboratory to perform quarterly tests in accordance with TAS 212, Appendix'X. 5.6 Minimum underlayment shall comply with the RAS 118, RAS 119 or RAS 120, as applicable. Underlayment products shall hold current Florida Statewide Product Approval or Local Approval for use in tile roof assemblies in FBC HVHZ jurisdictions. 5.7 Minimum roof deck requirements shall be in accordance with applicable FBC HVHZ requirements. 5.8 All products in the roof assembly shall have quality assurance audit in accordance with the F.A.C. Rule SIG20-3. 6. INSTALLATION: 6.1 Entegra Concrete Roof Tiles may be mechanically fastened, mortar -set or adhesive -set. Installation shall comply with manufacturer's current published instructions, but not less than the requirements of RAS 118, RAS 119 or RAS 120, as applicable. 6.2 Attachment Calculations: Entegra Concrete Roof rile shall be evaluated as a 'Moment -Based System' in accordance with Roofing Application Standard RAS 127-11 using the data outlined herein DDYNANI WqLnP k �MIFF`ajjzL 'TABLE AER ic UIRS el Tile Batten Application Direct -Deck Application Bermuda Flat 0.189 0.205 iP antation Mt) 0.267 - MO Horizon Flat 0.305 0.330 Bella High "s"" 0.349 0.378 Estate "S" 0.267 0.289 Hacienda 0.267 0.289 Galena Spanish "S�' N/A 0.235 Regal 0.287 0.311 .1, TABLE 1: RiggluflildM61MENT DUE TO GRAWIJYm- Roof Slope (0) Tile 2:12 �S 0 < 3:1 5:12 5:12 < I 1 6:12 6:12 < 0 < 7:12 0 > 7:12 Battens Direct Battens Direct Battens DirectBattens Direct Battens Direct Bermuda Flat .22 643 5.27 4.96 6.00 4-72 ntation ftl 7.22 7.91 ___ 6.44 5-2a 832 : 12 1.1 7.416.80 7.95 6.26 0 7.4Horizon Bella High "S" 1.60 5.99 :� 6.51 Estate "S" 6.14 6.84 5.91 6.74 5.92 6.64 5.70 6.50 Hacienda 5.92 6.80 5.92 6.80 5.82 6.6 Galena Spanish -S- N/A 6.20 N/A I All I K, /. 6.03 Regal D Jgn, UQ C"fla VfAUJhQr&Vff0n #9503 EDITION (2017) FBC HVHZ EVALUATION Entegra Roof Tiles Evaluation Report E39310.11.11-l.R4 FL7804-RlO Revision 4: 10/17/21117 Page 5 of 8 0 W Li dg a N N N 0yG N N O ]I-- TM N 0q M O .m-1 N M N I ro a e In IQ n m aa�� m .m-i c .-i ti n m aq ry '� y e .a N ;y m el m in ,'.� N e� n m m m rh v �° °' ry m v a s d y LL ` WW m 9p Y n. V V N O p a 0' 0 m 'l0' Of e�1 OO m t0 end N Ih O1 ei m M"� lD rl t0 1� N T� od N m C m G� t t E s u v m y u c gg a u p mr z 2 w w�0 i� 2 Z Z ® '6 C Z Z m W ^� ry W a rL v Z Z kll c a cp .G n w 0 0 0 e a 0 0 0 0 0 0 . r.' 00 00 O O O p 0 E E E E E E c o E o E 0 E 0 E E E ~� C u =' m 0 0 0 00 00 o m .m E E E E E E E c c¢¢ y§ N T VI m N Vf C C Z Z .0. L v IIG�_ ... .N.. .N.. v u � O O O .N... O .�_. .N.. .�.. .�... .N.. .N_. .N...N _. 0 .�.. .N_. 7r p .N.. C V C c O C O F F- F- O F W O O N O O y 0 0 0 0 0 y 0 W O W y O .N.. O O O .�.. y O C m is m = y m O i z z z h .,—` z z z z z z z z' b G ,u z z n m —` . Y T N f! C R 0 N W i W A i Vr K 'Ya' � IL C O VI O e m m= R n c G T m vai C e09 N w i N 0 W b "d 1 ^ S m c 0 0 W \\j - .(TRINITY I ERA ' 'i'ABLE4 ArrACHMENT RESIgrAN[EEXPRFSSED ASA MOIMEN7 MF;(FT LBF) a. .' MORTAR AND ADHESNESETSYSFEMg Note from Entegm Roof Tile; ILL The performance data bsted m Table 4 are based on the respective ddhesrve manufdcturers' testi reports. and Miami -Dade NOAs. ,iEntegm Roof Tile LLC relies upon tfieadhesae manufacturers, to provide these values forounndusioq; fn this FBC IiVHZ EvaluatromReport Please consult the, mdiwdual adhesive manufacturer for mformatron on product approvalsj; hmitatidns rewsions.-grotherinfprmahon forde[ermmmg wfnd ioad dnd:overturriin "moment e - _ -"` Tile Adhesive Tile Product Product Approval Plarement Mf(ft-lbf) "TILE BOND'"" by Dow Chemical NOA 16-0222.01 Interdependent (2-paddy) 41 Bermuda Flat, 'Touch N' Seal Storm Bond" by DAP Foam NOA 16-0421.03 interdependent (2-paddy) 73 Plantation "Polyset° RTA-1" by ICP Adhesives & Sealants NOA 16-0315.03 Interdependent (2-paddy) 52 Flat or Horizon "Polyset® AH-160" by ICP Adhesives & Sealants NOA17-0322.03 Interdependent (2-paddy) 43 Independent (medium paddy, -30 g) 51 Independent (large paddy, -45 g) 92 "TILE BOND"r" by Dow Chemical NOA 16-0222.01 Interdependent (2-paddy) 44 'Touch N' Seal Storm Bond" by DAP Foam NOA 16-0421.03 Interdependent (2-paddy) 42 Estate "5" or "Polyset® RTA-1" by ICP Adhesives & Sealants NOA 16-0315.03 Interdependent (2-paddy) 44 Hacienda "Polyset®AH-160" by ICP Adhesives& Sealants NOA 17-0322.03 Interdependent(2-paddy) 50 Independent (medium paddy, -30 g) 37 Independent (large paddy, -54 g) 61 Mortar Various Per RA5120 21 'TILE BOND"'" by Dow Chemical NOA 16-0222.01 Interdependent (2-paddy) 48 "Touch N' Seal Storm Bond" by DAP Foam NOA 16-0421.03 Interdependent (2-paddy) 52 Bella High "S", Galena "Polyset® RTA-1" by ICP Adhesives & Sealants NOA 16-0315.03 Interdependent (2-paddy) 36 Spanish "S" or Regal "Polyset® AH-160" by ICP Adhesives & Sealants NOA 17-0322.03 Interdependent (2-paddy) 30 Independent (medium paddy, -30 g) 49 Independent (large paddy, -63 g) 94 Mortar Various Per RAS 120 25 7. LABELING: 7.1 Each unit shall bear the imprint and/or identifiable marking of the manufacturer's name or logo, as detailed below. Tile lots shall be labeled in accordance with the requirements of the Accredited quality Assurance Agency noted herein. _ ENTEURR and/or Labeling: Bermuda Flat, Plantation Flat, Estate "S", Bella High "S", Galena Spanish "S" ErRcrior Re .rch and Dcaign, LLG Evaluation Report E39310.11.11-1-it4 [vtlptme oJAutlrorhogon lr95Q? 6r" EDITION(2017) FBC HVHI EVALUATION FL7904-RSO Entegra Roof Tiles Revision 4:10/17/2017 Page 7 of 8 TPJNI11( ERD and/or Hanson Labeling•. Horizon Flat, Hacienda, Regal 8. BUILDING PERMIT REQUIREMENTS: As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of this product. 9. MANUFACTURING PLANTS: Okeechobee, FL Bermuda Flat, Plantation Flat, Estate "S", Bella High "S", Galena Spanish "S" Ft. Myers, FL Horizon Flat, Hacienda Deerfield Beach, FL Horizon Flat, Hacienda, Regal 10. QuALiTYAssuRANCEENTiTY: PRI Construction Materials Technologies, LLC.—QUA9110; (813) 621-5777 - END OF EVALUATION REPORT — Exterior Research and Design, LLG Evaluation Report E39310.1L11-1-R4 Cerdficote of Authorkation#9503 6TM EDITION (2017) FBC HVHZ EVALUATION FL7804-R30 Entegra Roof Ides Revision 4.10/17/2017 Page 8 of 8