Loading...
HomeMy WebLinkAbout0412-0354 - 707 KITTERMAN RD PAPERWORKsf�o°jeY�FO CERTIFICATE OF OCCUPANCY This Certificate is issued pursuant to the requirements of the Florida Building Code certifying that at the time of issuance this structure was in compliance with,the various ordinances of St. Lucie County regulating building construction or use. For the followingC� , Parcel/Folio Nbr: 3415-501-0041-000/0 Lot # 3 Subdivision: Kitterman Woods Occupancy: Assembly - food & drink Building Address: 707 KITTERMAN Rd Legal Description: Permit Job CONSTRUCT CHURCH BUILDING Description Permit Finaled: 04/26/2011 Contractor REAVES INNIS L STEWARDSHIP SERVICES 2333 wynnewood st PORT SAINT LUCIE, FL 34953 (386) 679-0486 Kenneth Arnold Building Official Tuesday, April 26, 2011 Date Printed NOTE: This Certificate of Occupancy is issued to the above named, for building at the above named location only upon the express provision that the applicant will abide by and comply with all the conditions of the Zoning Ordinances and all Ordinances or Building Codes of Saint Lucie County pertaining to the erection, construction or remodeling of buildings or structures. This also certifies that the electrical wiring and/or equipment, and the plumbing work have been inspected and approved. The issuance of this Certificate grants permission to occupy and use the property described herein only for the use indicated. Any change in use will require -a new Certificate of Occupancy. POST IN A CONSPICUOUS PLACE Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 S c+ C CERTIFICATE OF TERMITE TREATMENT Sft���aytiFo CONSTRUCTION SOIL TREATMENT &Co el PERMIT #. ' " OB ADDRESS: 1 On kigeiMntj �� L• �� `�°I��. BUILDER/CONTRACTOR: PEST CONTROL CONTRACTOR: PEST CONTROL LICENSE #: We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: S r50 `If- Chemicals used: UIaSPdug Percentage of solution: U 6 Date of Treatment: Footing 19'Treatment Re -Treat Driveway 15t Treatment Re -Treat Other 1't Treatment Re -Treat Total gallons used: , 111,9 Time of Treatment:. jj} 3 6 Slab 11t Treatment Re -Treat Pools Treat Inspection Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job s/te to be p/dced up by the Inspector at time of each inspection or the scheduled inspection wl//fall and a re-lnspecdon fee charged FBC104.2.6 Cert/f/cete of pmtect/ve it eatment for prevention of_termites A weather resistant jobs/te posting board shall be pmWded to receive duplicate Treatment Certfficates as each required proteit/ve treatment Is wmpleted, prov/d/ng a copy for the person the penn/t is issued to and another copy for the building permit fifes The Treatment Certirrcate shall prov/de the product used, Identity of the applicator, time and data of the treatment, site /ocadon, area treated, chem/cat used, percent concentration and number of gallons used, to estabilsh a ver/Aable record of protective treatment. If the soil chemical battler method for termite prevention Is useo,final exterior treatment shall be completed prior to Anal building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on e International e Certified Independent Test & Balance Air - Hydronic - Sound & Vibration Building Commissioning - LEED Consulting CERTIFIED TEST & BALANCE REPORT DATE: March 25, 2011 _ PROJECT:, WANNED NAME: Grace Emmanuel gY ADDRESS: Port St. Lucie, Florida EE ��1C1@ COUiIf}/ DESIGN ENGINEER: - NAME: Not Available ADDRESS: Not Available \ -ARCHITECT: I NAME: Not Available ( ADDRESS: Not Available r HVAC CONTRACTOR: NAME: Not Available l . ADDRESS: Not Available PROJECT NUMBER: 1615 W*LE National Enviromental Balancing Bureau Certification THE DATA PRESENTED IN THIS REPORT IS A RECORD OF SYSTEM MEASUREMENTS AND FINAL ADJUSTMENTS THAT HAVE BEEN OBTAINED IN ACCORDANCE WITH THE CURRENT EDITION OF THE NEBB PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, AND BALANCING OF ENVIRONMENTAL SYSTEMS. ANY VARIANCES FROM DESIGN QUANTITIES, WHICH EXCEED NEBB TOLERANCES, ARE NOTED IN THE TEST- ADJUST- BALANCE REPORT PROJECT SUMMARY. Submitted & Certified By: ?124,xlreu< 9. 7M Matthew F. Fulghum NEBB Certified Professional Certification Number: 3459 Expiration Date: March -3151, 2013 MATTHEW F. FULGHUM CERTIFICATION 3459 E.xlx 3/31l13 Seal: TABCO International 3832-10 Baymeadows Rd. Suite 344 Jacksonville, Florida 32217 Office: 904.371.9077 e-mail: Info@tabcollc.com web site: www.tabcolic.com Fax: 904.371.9345 Certified Pro ect Grace Emmanuel Church Location PSL, Florida TABLE OF CONTENTS TABLE OF CONTENTS INSTRUMENT CALIBRATION AHU-1 AIR SIDE EQUIPMENT DATA DX- COOLING COIL DATA AIR COOLED DX- CONDENSING UNIT EQUIPMENT DATA AIR DISTRIBUTION DATA AHU-2 AIR SIDE EQUIPMENT DATA DX- COOLING COIL DATA AIR COOLED DX- CONDENSING UNIT EQUIPMENT DATA AIR DISTRIBUTION DATA AHU-3 AIR SIDE EQUIPMENT DATA DX- COOLING COIL DATA AIR COOLED DX - CONDENSING UNIT EQUIPMENT DATA AIR DISTRIBUTION DATA AHU-4 AIR SIDE EQUIPMENT DATA DX- COOLING COIL DATA AIR COOLED DX - CONDENSING UNIT EQUIPMENT DATA AIR DISTRIBUTION DATA AHU-5 AIR SIDE EQUIPMENT DATA DX- COOLING COIL DATA AIR COOLED DX- CONDENSING UNIT EQUIPMENT DATA AIR DISTRIBUTION DATA AHU-6 AIR SIDE EQUIPMENT DATA DX- COOLING COIL DATA AIR COOLED DX- CONDENSING UNIT EQUIPMENT DATA AIR DISTRIBUTION DATA AHU-7 AIR SIDE EQUIPMENT DATA DX- COOLING COIL DATA AIR COOLED DX - CONDENSING UNIT EQUIPMENT DATA AIR DISTRIBUTION DATA Measurements By. Fulahum TABCO International / 20110 Date: March 25, 2011 Page: 1 of 18 Test Dates: March 24. 2011 and March 25 2011 2 12 3 7 9 13 4 7 10 14 4 7 10 15 5 8 10 16 5 8 10 17 6 8 11 18 rjl l; Certified Project Grace Emmanuel Church Location PSL, Florida INSTRUMENT LIST Date: March 25, 2011 Page: 2 of IS Instrument Manufacturer Model Serial Number Calibration Data H dronic Manometer Alnor HM-680 70734124 02-10-2011 Micromanometer Alnor EBT-721 90717007 02-10-2011 lowhood Alnor EBT-721 90717007 02-10-2011 elometer Alnor EBT-721 90717007 02-10-2011 haser Laser Tachometer Monarch PM-6669 SM3421 09-12-2010 Humidity Measurment Alnor AL72-TH1 90717007 07-01-2010 oIYArnmeter Fluke 116-RMS 474505 - eloci Matrix Alnor VLG84 1406-7 Airfoil Alnor SVP18 1406-8 Slag -Tube Manometer Dwyer 1223-36WM 3575-8 itot Tube 12" Dwyer NAP 3575-3 itotTube 18" Dwyer NAP 3575-3 itotTube 36" Dwyer NAP 3575-4 itot Tube 48" Dwyer NAP 3575-3 itot Tube 60" Dwyer NAP 3575-4 elProbe Alnor SVP18 1406-8 ill Measurements By.Rdghum TABCO Intemational / 20110 Test Dates: March 24. 2011 and Mamh 25 2011 hi* Certified Project Grace Emmanuel Church Location I PSL, Florida AIR SIDE EQUIPMENT DATA Date: March 25. 2011 Page: 3 of 18 Unit No. AHU-1 AHU-2 Equipment Location Mechanical Room Mechanical Room Area Served West Sanctus / Sound Room East Sanctuary I Sound Room Equipment Manufacture Trane Trane Model Number TWE180E300AA TWE180E300AA edal Number 104510CGWA 11022NRDWA Fan Data Specified Actual Specified Actual Total CFM - Fan 4800 4545 4800 4590 Total CFM - Outlets 4800 4545 4800 4590 Return Air CFM 3900 3682 3900 3675 ut Side Air CFM 900 863 900 915 otal / Ext. Static Pressure 1.0" 0.79 1.0" 0.82 Inlet Pressure 0.37. 0.33 Discharge Pressure 0.42 0.39 Fan RPM NA 802 NA 794 Motor Data Specified Actual S edfied Actual Motor Manufacture Marathon Marathon Motor Horse Power / RPM 3.0 / - 3.0 / 1725 3.0 / - 3.0 / 1725 Phase /Hz 3/60 3/till _ 3160 3/60 Service Factor / Frame No. 1.15 / 56HZ 1.15 / 56HZ otor Voltage 208-208-208 231-228-230 .208-208-208 228-225-231 otorAm era a 9.0-9.0-9.0 1 7.3-7.2-7.4 9.0-9.0-9.0 6.9-7.0-6.6 Drive Padm e Motor Sheave & Shaft 1VP44 X 718 1VP44 X 7/8 Fan Shave & Shaft BK90 X 1-7/16 BK90 X 1-7116 Number / Belt Size 1 BX58 1 BX58 Center to Center 20.5 20.5 Final Filters 8 15X20X2 8 15X20X2 Comments: - Measurements By. Fulahum TABCO Intematlonal 120110 Test Oates: March 24. 2011 and March 25 2011 Certified Project Grace Emmanuel Church Location PSL, Florida AIR SIDE EQUIPMENT DATA Date: March 25, 2011 Page: 4 of 18 Unit No. AHU-3 AHU4 Equipment Location Mechanical Room Mechanical Room Area Served Administration Offices Youth / Nurse / Conference Equipment Manufacture Trane Trane Model Number ZTEC3F60B1000AA ZTEC3F60B1000AA. Serial Number 8065LCFZV 8065K4D2V Fan Data Specified Actual Spectilled Actual Total CFM - Fan 2000 1758 2000 1593 Total CFM- Outlets 2300 * 1758 * 1600 ** 1593 ** Return Air CFM 1770 1516 1770 1370 ut Side Air CFM 230 242 230 223 Total / Ext. Static Pressure 0.64 0.47 1.0 0.45 Inlet Pressure 0.18 0.19 Dischar a Pressure 0.29 0.26 Fan RPM Direct Drive Direct Drive Motor Data Specified Actual Specified Actual Motor Manufacture General Electric General Electric. Motor Horse Power / RPM 1.0 / - 1.0 / - 1.0 / - 1.0 / - Phase / Hz 1160 1 160 1 / 60 1 / 60 Service Factor / Frame No. - - Motor Voltage 230 233 230 233 MotorAm era a 3.0 1 2.5 1 3.0 2.5 Drive Package Motor Sheave & Shaft Direct Drive Direct Drive Fan Shave & Shaft Number / Belt Size Center to Center Final Filters 1 20 X 25 X 1 1 20 X 25 X 1 Comments: * Hallway diffusers omitted new supply design =1740 CFM. Valanced to obtain summation of supply diffusers. ** Also, air distribution does not match schedule, balanced to obtain summation of supply diffusers. Measurements By. Fulghum Test Dates: March 24. 2011 and March 25 2011 TABCO International 12011© Ni* Certified Date: March 25, 2011 Page: 5 of 18 Project Grace Emmanuel Church Location PSL, Rodda AIR SIDE EQUIPMENT DATA Unit No. AHU-5 AHU-6 Equipment Location Mechanical Room Above Ceiling ea Served Front main Buildin / Westside Stage / Music Room Equipment Manufacture American Standard Trane Model Number TWE120A300EL 2TEC3F36B1000AA anal Number 7366KB4BD 80735821V Fan Data Specified Actual Specified Actual otal CFM -fan 4000 3537 1000 1191 otal CFM - Outlets 3830 * 3537 * 990 * 1191 Return Air CFM 3500 3083 900 1089 ut Side Air CFM 500 454 100 102 Total / Ext. Static Pressure 1.0 0.80 0.80" 0.61 Inlet Pressure 0.29 0.25 ischar a Pressure 0.51 0.36 Fan RPM NA 1031 NA Direct Drive Motor Data Specified Actual S edfied Actual Motor Manufacture General Electric General Electric Motor Horse Power / RPM NA 2.0 / 1725 3/4 / - % / - hase/Hz 3/60 3/60 1/60 1/60 Service Factor / Frame No. 1.15 / 145T - Motor Voltage 208-208-208 231-227-226 230 227 otorAm era a 6.2-6.2-6.2 4.7-5.1-4.9 2.2 1.9 Drive Package Motor Sheave & Shaft 4-1/2 X 7/8 Direct Drive Fan Shave & Shaft 7 X 1 Number / Belt Size 1 A50 Center to Center 17.5" Final Filters 4 16X25X1 1 20 X 20 X 1 Comments: ' Balanced to obtain design summation of supply air distribution. Measurements By. Fulghurn TABCO International / 2011© Test Dates: March 24. 2011 and March 25. 2011 Ni6 Certified Project Grace Emmanuel Church Location PSL, Florida AIR SIDE EQUIPMENT DATA Date: March 25* 2011 Page: 6 of 16 Unit No. AHU-7 NAP Equipment Location Above Ceiling - rea Served Stage / Music Room - Equipment Manufacture Trane - Model Number 2TEC3F36B1000AA - Serial Number 807377AV - Fan Data Specified Actual Speeffied Actual Total CFM - Fan 1000 1200 Total CFM - Outlets 990 * 1200 Return Air CFM 900 1103 Out Side Air CFM 100 97 Total / Ext.:Static Pressure 0.80" 0.58 Inlet Pressure 0.23 Discharge Pressure 0.35 Fan RPM NA Direct Drive Motor Data Specified Actual Specified Actual Motor Manufacture General Electric Motor Horse Power / RPM 3/4 / - % / - - - hase / Hz 1 / 60 1160 Service Factor / Frame No. - Motor Voltage 230 225 otorAm era a 2.2 1 1.8 Drive Package NAP otor Sheave & Shaft Direct Drive :an Shave & Shaft Number / Belt Size enter to Center Final Filters 1 202 X 20 X 1 Comments: * Balanced to obtain design summation of supply air distribution. Measurements By: Fulghum TABCO International 12011© Test Dates: March 24. 2011 and March 25, 2011 m4i� Certified Date: March 25, 2011 Page: 7 of 18 P,ro ect Grace Emmanuel Church Location PSL, Florida DX- COOLING COIL DATA Unit No. AHt1,1 Mechanical Room AHU-2 Mechanical Room Equipment Location Area Served West Sanctus / Sound Room East Sanctus / Sound Room Equipment Manufacture Trane Trane Model Number TWE18OE300AA TWE180E300AA Serial Number 104510CGWA 11022NRDWA Temperature Profile E.A.T. DB/WB Specified 78.6 / 65.5 Actual 74.2163.1 Speafied 78.6 / 65.5 Actual .73.9 / 62.6 L.A.T. DB / WB :54.8 / 53.6 54.7153.8 54.8 / 53.6 54.1 / 52.8 FM '4800 4545 4800 4590 .•�lJmt,No.:' .:_� I AHU-4_x , , Equipment Location Mechanical Room Mechanical Room Area Served Administration Offices Youth / Nurse / Conference Equipment Manufacture Trane Trane Model Number ZTEC3F60B1000AA ZTEC3F60B1000AA Seriaf Number 8065LCFZV 8065K4D2V Tem natureProfile S edRM KW.Kcff$M jW8pMclfiidWjWPWAZQlw •. E.A.T. DB / WB NA 73.7 / 62.1 NA 74.1 162.5 L.A.T. DB / WB NA 53.8 / 570 NA 54.3 152.7 CFM 2000 1758 2000 1593 Comments Measurements By. FWahum TABCO Intemabonal12011© f Test Dates: March 24, 2011 and March 25, 2011 Certified Date: March 25, 2011 Page: 8 of 18 WWA Project I Grace Emmanuel Church Location PSL, Florida DX- COOLING COIL DATA VOWWRNOMO R&WHOWAHWOKAMM" Equipment Location Mechanical Room Above Ceiling rea Served Front main Building / Westside Stage / Music Room Equipment Manufacture American Standard Trane Model Number TWE120A300EL 2TEC3F36BI000AA enalNumber 7366KB4BD 80735821V Temperature Profile Specified Actual Speafied Actual EAT DB/WB NA 73.7162.5 77.8 / 64.7 74.1 / 63.2 L.A.T. DB / WB NA 54.1 153.5 54.4 / 54.0 53.5 / 52.4 CFM 4000 3537 1000 1191 NAP Equipment Location Above Ceiling - Area Served Stage / Music Room - Equipment Manufacture Trane - ModelNumber 2TEC3F36B1000AA - Serial Number 807377J1V - Tem ratumreWProfile T gip- S ecifiedl : }!? Actual S eafied r - Acival E.A.T. DB / WB 77.8 / 64.7 73.7 / 62.1 L.A.T. DB / WB 54.4 / 54.0 53.8 /52.4 CFM 1000 1200 wmments Measurements By Fed hum Test Dates: Mardi 24 2011 and March 25 2011 TABCO Intemational / 2011© Certified Date: March 25, 2011 Page: 9 of 18 AIR COOLED DX - CONDENSING UNIT EQUIPMENT DATA Unit No. CU-1 CU-1 ui menttocation Mechanical Pad NE Mechanical Pad NE rea Served AHU-1 AHU-1 ui ment Manufacture Trane Trane odel Number TTA 180 E300AA TTA 180 E300AA anal Number 11012Y8LTA 11012Y8LTA Condenser S cified Actual Specified Ardual lEntering Air Temp NA 78.3 NA 78.3 Electflod Specified Actual S cified I Actual om ressorAm s 25.0-25.0-25.0 18.3-17.2-17.4 25.0-25.0-25.0 17.6-17.7-17.3 om ressor Volts 230-230-230 238-242-237 230-230-230 240-237-241 ondenser Fan Amps 5.0 4.1 5.0 3.9 ondenser Fan Volts 230 238 230 240 Unit No. CU-2 CU-2 ui ment Location Mechanical Pad NE Mechanical Pad NE rea Served AHU-2 AHU-2 ui ment Manufacture Trane Trane odel Number TTA 180 E300AA TTA 180 E300AA erial Number 10393U91TA 10393U91TA EJectdcal Specified Actual SDeclfied Actual om ressorAm s 25.0-25.0-25.0 17.6-17.1-17.2 25.0-25.0-25.0 16.8-17.3-17.1 om ressor Volts 230-230-230 233-234-237 230-230-230 230=231=222 ondenser Fan Amps 5.0 3.9 5.0 3.8 ondenser Fan Volts 230 233 230 234 Measurements By: Fulabum TABCO Intemational / 2011© Test Dates: March 24. 2011 and March 25 2011 Ni6 Certified Project I Grace Emmanuel Church Location I PSL, Florida Date: March 25, 2011 Page: 10 of 18 AIR COOLED DX - CONDENSING UNIT EQUIPMENT DATA Unit No. CU5 CU4 ui ment Location Mechanical Pad NE Mechanical Pad NE rea Served AHU-3 AHU-4 ui ment Manufacture Trane Trane ode[ Number 2TTA 0060A3000AA 2TTA 0060A3000AA e0alNumber 43253J23F 4325U9L3F Condenser Specified Actual Specified Actual Entering Air Tern NA 78.3 NA 78.3 Electrical Specified Actual S ecified Actual om ressorAm s 19.7-19.7-19.7 15.6-16.1-16.2 19.7-19.7-19.7 17.1-16.3-16.2 om ressor Volts 208-208-208 233-231-240 208-208-208 238-236-134 ondenser Fan AnnDs 1.9 1.3 1.9 1.6 ondenser Fan Volts 208 233 208 238 Unit No. CU5 CU5 ui ment Location Mechanical Pad NW Mechanical Pad SW rea Served AHU-5 AHU-6 ui ment Manufacture Trane Trane odelNumber TTA120D300AA 4A7C3036A3000BA erial Number 10425M49YA 10394WY43T Condenser Specified Actual Specified Actual FntedngAirTemp NA 78.3 NA 78.3 Electrical Specified Actual Specified Actual om ressorAm s 30.0-30.0-30.0 24.6-24.3-24.0 11.5-11.5-11.5 9.6-9.1-9.3 om ressor Volts 230-230-230 241-233-240 208-208-208 233-228-230 ondenser Fan Amps 5.0 4.1 0.7 0.51 ondenser Fan Volts 230 232 208 233 Measurements By. Nahum TABCO International / 2011© Test Dates: March 24.2011 and March 25 2011 N40 Certified Pro ect Grace Emmanuel Church Location PSL, Florida Date: March 25, 2011 Page: 11: of 18 AIR COOLED DX - CONDENSING UNIT EQUIPMENT DATA Unit No. CU-7 NAP ui ment Location Mechanical Pad SW rea Served AHU-6 ui ment Manufacture Trane odelNumber 4A7C3036A3000BA e6al Number 11024WYR3F Condenser Specified Actual Spedfied Actual �ntering Ak Temp NA 78.3 Electrical Specified Actual Specified Actual om ressorAm s 11.5-11.5-11.5 10.7-10.4-9.2 om ressor Volts 208-208-208 233-228-237 ondenser Fan Amps 0.7 0.61 ondenser Fan Volts 208 233 Unit No. NAP NAP ui ment Location rea Served 1"Iedal ui ment.Manufacture ode[ Number Number Electrical Spedfied Actual Spedfied Actual om ressorAm s om ressor Volts ondenser Fan Amps ondenser Fan Volts Measurements By. Fulahum Test Dates: March 24. 2011 and March 25 2011 TABCO International 12011© N* - P Certified ProjectGrace Emmanuel Church Location' PSL, Florida AIR DISTRIBUTION DATA Date: March 25. 2011 Page: 12 of 18 YSTEM I AHU-1 Comments:' Unable to capture complete diffuser face. Due to lighting. Velocity pressure measurement performed on diffuser with airfoil. To obtain actual CFM. Return ducting was increased. Due to restriction caused by fired damper connection. FD installed is internal vs external connection blocking net area of return duct, a additional 16" return duct and fire damper was added to sanctuary, installed up stream of existing fire damper. Referenced above in test-1 before and test-2 after. System is balanced to low end of design. If additional airflow is required a pulley change will be required. Measurements By. Fulghurn TABCO International / 2011© Test Dates: March 24, 2011 and March 25 2011 Ni6 Certified Proect Grace Emmanuel Church Location PSL, Florida AIR DISTRIBUTION DATA Date: March 25, 2011 Page: 13 of 18 YSTEM I AHU-2 zpq— (:omments: ' unable to capture complete diffuser face. Due to lighting. Velocity pressure measurement performed on diffuser with airfoil. To obtain actual CFM. Return ducting was increased. Due to restriction caused by fired damper connection. FD installed is internal vs external connection blocking net area of return duct, a additional 16" return duct and fire damper was added to sanctuary, installed up stream of existing fire damper. Referenced above in test-1 before and test-2 after. System is balanced to low end of design. If additional airflow is required a pulley change will be required. Measurements aY: uIF ahem TABCO International / 2011© Test Dates: March 24. 2011 and March 25, 2011 Certified Project Grace Emmanuel Church Location PSL, Florida AIR DISTRIBUTION DATA Date: March 25, 2011 Page: 14 of 18 YSTEM I AHU-3 15:La5i:�JWMWMI Comments:' Hallway diffusers omitted. Due fire barrier, additional CFM proportionally balanced between surrounding diffusers. " Hallway diffusers existing 8" flex ducting, was replaced by HVAC contractor with 10" flex ducting. In order to obtain design CFM. Balanced to obtain summation of supply diffusers. Measurements By. Fulghum TABCO Intemdona112011© Test Dates: March 24. 2011 and March 25 2011 Comments:' Hallway diffusers omitted. Due fire barrier, additional CFM proportionally balanced between surrounding diffusers. " Hallway diffusers existing 8" flex ducting, was replaced by HVAC contractor with 10" flex ducting. In order to obtain design CFM. Balanced to obtain summation of supply diffusers. Measurements By. Fulghum TABCO Intemdona112011© Test Dates: March 24. 2011 and March 25 2011 Certified Date: March 25, 2011 Proieof _ Grace Emmanuel Church Location PSL, Florida AIR DISTRIBUTION DATA Page: 15 of 18 YSTEM I AHU 4 Comments:. Balanced to obtain summation of supply diffusers. Measurements %r. Fulghum TABCO Intemational 120110 Test Dates: March 24 2011 and March 25 2011 Certified Date: March 25, 2011 Page: 16 of 18 Project I Grace Emmanuel Church Location I PSL, Florida AIR DISTRIBUTION DATA YSTEM I AHUS illigN al Nurttber Room T Type size, lDeaign CFM Test -1= Tes CFM T61: 2. ::Test - 3 Final: - CFM Gorrwnenls 1 Food Pantry 114 Lay In 24 X 24 250 251 253 2 Kitchen 115 Lay In 24 X 24 250 166 227 . 3 Women's TLT 116 Lay In 24 X 24 70 96 77 4 Women's TLT 116 Lay In 24 X 24 70 46 73 5 Men's TLT 117 Lay In 24 X 24 70 117 72 6 Men's TLT 117 Lay In 24 X 24 70 62 70 7 Foyer 101 North SW 10" 400 184 368 8 Foyer 101 South SW 10" 400 178 374 9 Class Room 110 Lay In 24 X 24 250 _ NA ** 10 Class Room 105 Lay In 24 X 24 250 280 263 11 Class Room 106 La In 24 X 24 250 256 252 12 Class Room 107 Lay In 24 X 24 250 221 247 13 Class Room 108 Layin 24 X 24 250 336 253 14 Class Room 108 Lay In 24 X 24 250 263 241 15 Class Room 105 La In 24 X 24 250 224 247 16 Class Room 105 Lay In 24 X 24 250 228 262 17 Class Room 109 Lay In 24 X 24 250 284 258 Supply Total 3830 3537 Comments:' Hallway diffusers existing 8" flex ducting, was replaced by HVAC contractor with 10" flex ducting. In order to obtain design CFM. " Class Room 110 supply diffuser omitted, Class Rooms 105 to 110 is one large open area; that will be section off, and appears to have air coverage to all proposed sections. Additional CFM proportionally balanced between surrounding diffusers. Measurements By. ul hu TABCO International / 2011© Test Dates: March 24. 2011 and March 25 2011 Ni ip Certified ftlect Grace Emmanuel Church Locadon PSL, Florida AIR DISTRIBUTION DATA Date: March 25, 2011 Page: 17 of 18 YSTEM I AHU 6 o • .. ®ate®��®o Comments:' Added diffuser no design CFM provided, on revised mechanical drawings. " Balanced to obtain summation of supply diffusers. Measurements By. uF IDhum TABCO Intemabonal / 2011© Test Dates: March 24. 2011 and March 25 2011 Ni ip Certified Project Grace Emmanuel Church Locatlbh. PSL, Florida Date: March 25, 2011 Page: 18 of 18 AIR DISTRIBUTION DATA YSTEM I AHU-7 LJL Lan, 7 �> I of . •� ® .— o (;omments: 'Addeo olltuser no design GFM provided, on revised mechanical drawings. " Balanced to obtain summation of supply diffusers. Measurements By. Fulahum TABCO Intemaltional / 20110 Test Dates: March 24. 2011 and March 25 2011