Loading...
HomeMy WebLinkAboutPLANS5-1 SIDEWALL ELEVATION N.7.5 4" 5LAE, I LAYER SAN OUT' C L F�UNPATION JT5, AT FOUNDATION PLAN N.T.S. U, n 2 NO. 5 CONT 22" 77 �T NO. 5 052" O.C. TYF. FRONTWALL ELEVATION N.7.5. REARWALL ELEVATION N.T.�5- V41TH SILAS HITHOUT SLAB 4-NO. 4 BARS CONT. I #6 TIE BARS a5'-O" O.C. SECTION A -A N.7.5. 51T--T 1/2" OUT TO OUT OF FOUNDATION 2211 HITH SLAB HITHOUT SLAB 221, 4 NO, 4 BAF5 CONT. ------------ A // T\\F/ NO. !3 052" O.C. 7YF. 41, TYR SECTION 13-13 N.T.S. GENERAL NOTES 1. ALL MATERIAL AND HORKMANSHIP SHALL CONFORM V41TH THE REGUIREMEN7�5 OF THE 2006 SUPPLEMENT OF THE .2004 F5r, 2. NO LOADS OTHER THAN TH05E 01VEN UNDER 'DE5(5N DATA" BELCH BE IMPOSED ON THE "STRUCTURE". 5. THE FOUNDATION ON THE DRANINC, 15 A SUCSOESTEP SOLUTION ONLY. CHANOES MAY BE NECE55APY DUE TO LOCAL BUILPINC, REOULATION5. 4. THE FOUNDATION SHALL BE FOUNDED ON NATURAL UNDISTURBED BOIL CAPABLE OF SAFELY eU5TAININCS 2000 PSF. AND AT LEAST 12 IN. BELCH FINISHED ORADE. 5. SLAB ON CRAVE SHALL BE PLACED ON SOIL CAPABLE OF SU5TAININS, 500 PSF, V41THOUT APPROPRIATE SETTLEMENT. 6. BUILDINO MUST BE (SROUTED INTO TROU(5H INSIDE AND OUT TO MAINTAIN STRUCTURAL INTEORITY -7. GROSS TIES MUST ME INCA5ED IN CONCRETE NHEN CONCRETE SLAB IN NOT USED. e,. VERIFY ALL FOUNDATION DIMENSIONS HITH STEEL FACTORY BEFORE CONSTRUCTION q. DRANINOS ARE FOR PERMIT ONLY DIMENSIONS ARE N07 FOR CONSTRUCTION. ARCH DATA 24 2" ApprovoLNurnipers: Aztec. Steel BuildinQ Cor FL-551r; Arch Panel (Oolvolume 4 Color Roof and 51CICV4011 Systems) FL-5&qC�: Standard Endv4all Panel (5.5" deep / 6alvolume) Steel mjt-�20�: FL-5aq5i ("R" Panel / Cae Channel Color endNoll s�ystem5) DESIGN DATA STEEL &AU(9E: 23 50 K51 MIN. YIELD 5ALVALUME SHEET STEEL LIVE LOAD: 55 FSF KNO, LOAD:V55=140 MPH EXF. 6 ADDITIONAL HIND DE51ON INFORMATION 1. Basic Hind Speed = 140 mph 2 . Hind Importance Portor = 1.0 5. Hind exposure = 5 4. Applicable Internal pressure roeFflclant= ±055 5.Components and Cladding designed by others shall be designed for a "Ind pressure of ±40 psf. MATERIALS 1. CONCRETE 57RENOTH AT 2a DAYS To BE 2500 P51 2. REINFORCIN& STEEL TO BE DEFORMED BARS. ORAPE 60, 5. ALL MATERIALS SHALL CONFORM TO THE APPROPRIATE ASTM SPECIFICATIONS. THESE PLANS AND ALL PROPOSED WORK ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS THAT MAY BE NECESSARY IN ORDER To COMPLY WITH ALL APPWCAILI CODjS, CONCEMS FASTENERS OR ATTACHMENTS ARE THE RESPONSIBUN OF ME CONWMROF=RO "-#1 .0. 0. STfLUCIE COU .BUII'LDING DIYA F OR P R !Ver EVIEWED BY DATE ERMIT MU8T4 E KEPT ON JOB OR NO INS CTION WILL BE MADE - I � N-) C/) U) 0 ry N t (-0 0,0 am Cn D V) => (_0 LLJ 0 �� 0 > Lu (/-) LLJ 0 Cn ME n', LLJ < CL Cn < W V) 0 = C/) = 0 < 00 I I 1 00 v,-,, 6 Uj LU M ul OL LU >= Ld z Z y LL -T-50-0-7 rhoet no. SCANNED By St. Lucie County OF TNO 00 0- LU w ARCH PANEL USE HILTI KNIKI BOTL 11 1/2"(P 2 5/4" LONG INTO TROUGH 5/16"x5/4" LON& 13OLTS Oq" 0,0. 1/4" PUNCHED METAL STRAPPING ARCH PANEL BOLTING DETAIL DRILL HOLES IN HEADER AND VERTICAL FRAME TO ,JAMB/HEADER CLIP USE 5, LONG E30LTS HEADER CLIP DETAIL NOT U5EC) ARCH PANEL BOLTING DETAIL ARCH PANELS ci OA.-JAMB/FLOOR CLIP ZINSERT.JAME3/FLOOR GLIF INTO BOTTOM OF DOOR FRAME JAMB CLIP DETAIL man door onli NOT U5ED INNE�Z CURVED OVERHEAD PC GUIDE SA LAIROE OUTER CURVED ANGLE 2X6 cl&" O.C. 4ARD'rBOARD ENDWALL PANEL BOLTING DETAIL X12 N/ 1/2" FL'rNOOD OLUEP AND LED BETNEEN -.4EAD DOOR HEADER CONNECTION DETAIL overhead door onl PANELS BOLTS 07" O.C. ARCH PANEL BOLTING DETAIL E5/16"x5/4" LON& BOLTE, ARCH PANEL CONNECTION DETAIL E5" LAP NOT U5EE) ARCH PANEL USE NON-FcROU5 CONCRETE OR GROUT RFFINED CONCRETE 5000 F51 STRENGTH OR GREATER MA"r AL50 BE USED ARCH GROUTING DETAIL THE ARCH 510EHALL AND ENDNALL TROU5H 15 GROUTED E30TH IN51DE AND OUTSC)F. THE NSIPEE;� Tl;POUrH 15 FILLED UP NITH A LOROE 5LCFE �250) ANA'T'FROM STEE. 2 INCHES ABOVE CENTER LINE OF 2ND SET OF BOLT O S. ENDWALL GROUTING DETAIL NOT USED Z 2X� OVERHEAD DOOR ATTACHMENT INSIDE VIEN (POOR OPTIONAL) co 2X65 ARE BOLTFn TO BUILPINO DOOR -JAMB OVERHEAD POOR TRACK 15 ATTACHED EVER-r 24 INCHES TO EACH ARCH V41TH 2X2XI/4 15 0A ANGLE THESE PLANS AND ALL PROPOSED WORK ARE SUBJECT To ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS THAT MAY If NECESSARY IN ORDER TO COMPLY WITH ALL APPUCU61 Coprig, CONCEA3 FASTENERS OR ATTACHMENTS ARE THE RESPONSIBIM OF THF CONTRACTOR OF F�FCON 1/4"Xg)" PUNCHED METAL ARCH PANELS STRAPPING FOR ANCHORING INNER CURVED ANGLE OUTER CURVED AN51-E 2X6616" O'c'. EXTERIOR HARDrBOARP 51PINO ENDWALL CONNECTION DETAIL NOTU5EP TO ARCH FANEL �USE 5/1&"X3/4" LONG EOLT5 USE STAINLE55 STEEL HILTI KiNIK BOLT 2, 1/2"(PX 2 514" LON& INTO FOUNDATION It LiZT.lLlyw--cOUNTY BUILDING DIVISION RIEVIEWIED FOR COMPLIANCE REVIEWED BY DATE PLANS AND PERMIT MUST BE KEPT ON JOB OR E3 E3UILPINO TO 5TEEl TIE r�)ONNS NO INSIDE TION WILL BE MAUc - FOR ANr�HOFZINO DURINO EREC�TION ONLT. PERMANENT ANCHORINO STRENOTH 15 DERIVED FROM NO 7ROUOH FOR 0009 OPENING C�ONGRETINO/OROUTING BUiLDINO INTO FOUNDATION AT BASE C46 cn cj� 0 Lij Q0 Ld (-D 6 0 cf) => (0 0 > fl- 1 LU V) W v) < C/� < LLj cf) 0 � = cn = W 0 00 < 00 ui -A LL Lu 14 >m OL RA Z C) Z LL 7-50-07 dro"n bu R.E.5. 5haet no. ENDWALL PANEL BOLTING DETAIL OF TWO 17.1 N.T.5. 4" SLA13 I LA'rER SAN CUT C... L. UNDATION JT�5. AT. FOUNDATION PLAN N.T.S. �9,0� FRONTWALL ELEVATION N.T.S. OPADWAI I 1=1 I=VATION HITH SLAB P41THOUT SLAB 4-NO. 4 BARS CONT. #6 TIE BARS oV-C" O.G. A -1 --1'- I- I - No 5 a 52,, or, TYF --/ 4" TYP. SECTION 13-13 "V I I" �� - � � 1, Q9:r-T1AK1 A -A OUT TO OUT OF FOUNDATION V41TH SLAB HITHOUT SLAB W', TIE BARS aa,-v b.]. / N.T.S. L7 N GENERAL NOTES 1, ALL MATERIAL AND HORKMAN5HIF SHALL CONFORM NITH THE REQUIREMENTS OF THE 2006 SUPPLEMENT OF THE 2004 F15C 2. NO LOADS OTHER THAN TH05E 01VEN UNDER "DESION DATA" SELON BE IMF05ED ON THE `STRIJ�' TURE". 5. THE FOUNDATION ON THE DRANIN& 15 A 5UOr5E57ED SOLUTION ONLY. CHANCES MAY BE NECE55ARY DUE To LOCAL 5UILPINO REOULATION5, 4, THE FOUNDATION SHALL BE FOUNDED ON NATURAL UNDISTURBED F501L CAPABLE OF SAFELY SU5TAININ5 2000 FSF. AND AT LEAST 12 IN. BELCH FIN15HED &RAVE. 5. SLAB ON ORAVE SHALL BE! PLACED ON 501L CAPABLE OF 5U5TAININ6 5CO F5F. V41THOUT APPROPRIATE SETTLEMENT. 6. BUILDIN<5 MUST BE SROUTED INTO TIROUOH IN51PE AND OUT TO MAINTAIN STRUCTURAL INTE-CRITY 'T. CRO55 TIES MUST ME INCA5EP IN CONCRETE NHEN CONCRETE 51-AB IN NOT USED. e�. \/ERIFY ALL FOUNDATION DIMENSIONS NITH STEEL FACTORY BEFORE CONSTRUCTION ,1. DRANIN(55 ARE FOR PERMIT ONLY DIMENSIONS ARE NOT FOR CONSTRUCTION. ARCH DATA 24 2" AzteC. Steel Building 00 PL-5e�crli Arch Panel (C�cllvolum* $ Color ROOf and 51dewall Systems) FL-59�,Ie,� Standard EndNall Panel (5.5" cleep / eolvoli)me) Steel Built COC12: FL-5e�cl5i (11R11 Panel / Cee Channel Color endNoll systems) DESIGN DATA STEEL 6AUOE:25 50 <51 MIN, YIELD (SALVALUME SHEET STEEL LIVE LOAD: 55 F5F HIND LOAPtV55=140 MPH EXP. 5 ADnTIONAL HIND DESION INFORMATION 1. Bastc. Hind Speed = 140 mph 2. HInd Importorre factor = 1.0 5. Hind exposure = 5 4. Applicable lnt--mql pressure ao-aPficlant= ±055 5.Comporent5 and 61odding desigreeJ by others sholi be designed for a viind pressure of t4o psf. MATERIALS 1. CONCRETE STRENOTH AT 25 DAYS TO BE 2500 FSI 2. REINFOROINO STEEL TO BE DEFORMED BARS. r5RADE &0. 3. ALL MATERIALS SHALL CONFORM TO THE APPROPRIATE A5TM SPECIFICATIONS, CONCEALED FASTENERS OR ATTACHMENTS ARE THE RESPONSIBITY OF THE THESE PLANS AND ALL PROPOSED WORK ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS THAT MAY BE NECESSARY IN ORDER TO COMPLY WITH A" APPWQAaLj GOD% OCT - 3 2007 Cn U) 0, C\4 -,I- (�o CD 0,0 0 C) 0 > LLJ 0 Cf) LLJ < CL Lli n LU 0 0 � = U) = LLJ 0 00 < 00 V -�� C*1) C> 00 C) Uj w Iiinn -1 LL CO 11111C , 11 LU Is) OL LU >= L-d z Z V .401 a LL dote -7-50-0-7 dra"n bt4 checked bul revised JA