HomeMy WebLinkAboutRESPONSES TO COMMENTSAddress: Cayuga Ave
City I State / Zip Fort Pierce , FIL 34947
Parcel: 1428-702-0232-00017 Jurisdiction: St. Lucie County
Zoning: IL Lot: 1 Block: 15
Owner(s): International Airport Businnes
&plication Information
OR b
vrmti�um—iserz C)BqD-j- 0�68
—WctiVjty1Tqp �. 1,31;0=58w I F1�5�
Permit Type: Building Commercial �'j j] F23 1 1 2039
Contractor Information:
Contractor Name: Richard Morris
Business Name: MDM Services, Inc
Business Addr: 1412 SW 34� Ave SCANNED
BY
St. Lucie County
Zoning Review
07/16/2006 1 / Comment THE GENERAL CONTRACTOR IS ON HOLD. W/C IS EXPIRED YOU NEED TO
UPDATE YOUR LICENSE WITH OUR CONTRACTOR LICENSING DER PLEASE
CONTACT; (772) 462-1673
Response: Updated licenses and insurance attached
07/18/2008 2 V/Comment APPLICATION AND FILLED LANDS AFF1 DAVIT ARE SIGNED BY GABRIEL
VOLANTE. WHAT IS THE TITLE OF THIS PERSON?
Response: Mr. Volante is one of the original Members of the LLC. See attached documents.
ONLY OWNERS. REGISTERED MANAGEMENT MEMBERS OR REGISTERED
AGENTS ARE ALLOWED TO SIGN THE APPLICATION. ACCORDING TO FLORIDA
DEPARTMENT OF STATE GABRIEL VOLANTE IS NOT A REGISTERED MEMBER OR
AGENT.
WE NEED A NEW SIGNATURE PAGE AND A NEW FILLED LANDS AFFIDAVIT. THE
CONTRACTOR IS ALLOWED TO SIGN BOTH SIDES OF THE APPLICATION. THE
FILLED LANDS AFFIDAVIT NEEDS TO BE SIGNED BY OWNER OR REGISTERED
AGENT
07/18/2008 3 Aornment WE NEED A SUB SUMMERY AND SUB AGREEMENTS FOR ELECTRICAL.
PLUMBING, MECHANICAL AND ROOF. THE ROOF SUB REQUIRES A ROOF
CONTRACTOR. GC IS NOT ALLOWED TO DO METAL ROOF
Response. Will submit roof permit application and sub agreements once permit is ready.
07/18/2008 4 V Comment WE NEED A SECOND APPLICATION WITH FILLED LANDS AFFIDAVIT AND SUBS
FOR THE CANOPY FOR THE FUEL ISLAND. WE CAN USE ONE SET OF PLANS, BUT
THEY EACH NEED TO HAVE THEIR OWN PERMIT.
Response: Will submitsub agreements once permit is ready forpickup.
Canopy permit application and lands affidavit attached.
PLEASE BRING IN A SECOND APPLICATION SIGNED AND NOTARIZED. ORIGINAL
FILLED LANDS AFFIDAVIT. SUB SUMMARY AND A SUB AGREEMENT FOR THE
ROOF.
Response: Will submitcanopy roof permit application and sub agreements once permit is
ready.
Lands affidavit attached.
IF THERE IS ANY PLUMBING OR ELECTRICAL WORK TO BE DONE WE NEED SUBS
FOR THAT AS WELL.
Response: Will submit sub agreements once permit is ready for pickup.
07/18/2008 5 Comment V THE PARKING SPACES AROUND THE CONVENIENCE STORE ARE NOT
MEASURING THE REQUIRED 18'AND ARE MISSING THE WHEEL STOP.
Response., Parking spaces are 16'to match approved site plan.
Wheel stop added See attached tank & piping plan G-1.
PLEASE REVISE ALL THE PAGES SHOWING THE PARKING.
WE NEED 3 SEALED SETS OF CORRECTIONS.
Response: Attached.
07/18/2008 6 Comment V/THE SUBMITTED COPY OF THE APPROVED SITE PLAN IS MISSING THE
APPROVED LANDSCAPE PLAN.
PLEASE PROVIDE US 3 COPIES OF APPROVED LANDSCAPE PLANS.
Response: 111611 submitsub agreements once permitis ready forpickup.
07118/2008 7 Comment V1 ANY WALL OR GROUND SIGNS ON THE PROPERTY REQUIRE SEPARATE
PERMITS. THEY WILL NOT BE INCLUDED IN THESE PERMITS.
Response: Will submitseparate applications forsigns.
07/18/2008 8 Comment //ACCORDING
TO THE RESOLUTION THE DEVELOPER NEEDS TO TAKE CARE OF:
THE DEDICATION OF THE NORTH 30'OF THE PARCEL FOR FUTURE WIDENING
OFTHEROAD
L/ THE DEDICATION OF THE EAST 3'FOR FUTURE WIDENING OF THE ROAD
A LEFT TURN LANE FOR THE PROPOSED PROJECT ON SAINT LUCIE BLVD
6'WIDE SIDEWALK ALONG THE FRONTAGE OF ST LUCIE BLVD.
HAVE ANY OF THESE ITEMS BEEN TAKEN CARE OF OR ARE THEY IN PROCESS?
IF NOT WHEN ARE THEY GOING TO BE DONE?
IF ANY OF THE ITEMS HAS BEEN TAKEN CARE OF WE WOULD LIKE TO SEE ANY
PROOF THAT THE COUNTY HAS SIGNED OFF ON IT, OR RECORDED COPIES
Response:
See attached Warranty Deed
07/18/2008 9 Comment
/�H�AS THE ENVIRONMENTAL DEPARTMENT ISSUED A VEGETATION REMOVAL
PERMIT? PLEASE PROVIDE US OF A COPY.
Response:
In process
07/181200810 Comment vz�THE TOTAL VALUE OF CONSTRUCTION FOR PHASE 4 (CONVENIENCE STORE
AND CANOPY FOR FUEL ISLAND) IS S 1.000.000.00 ACCORDING TO THE BUILDING
APPLICATION. PLEASE PROVIDE US A BREAK DOWN OF THE COSTS SPLIT OUT IN
THE COST FOR THE CONVENIENCE STORE AND THE COSTS FOR THE CANOPY.
Response: Convenience store $150,000.00
Canopy $200,000.00
07/18/2008 11 Comment \Y PARKING SPACE 1 IS INA DIFFERENT LOCATION THAN ON THE APPROVED SITE
PLAN. YOU ADDED A GENERATOR ENCLOSURE ON THE LOCATION OF PARKING
SPACE 1 THE AIR VAC IS IN THE REQUIRED 10'SETBACK AND UTILITY
EASEMENT. THIS IS NOT ALLOWED.
Response: Corrected. See attached tank & piping plan G-1.
07/18/200S 12 Comment THE CONCRETE TANK PAD HAS A DIFFERENT LAYOUT THAN IN THE APPROVED
SITE PLAN AND IS NOW PARTLY GOING OVER THE PARKING SPACES.
Response: Corrected. See attached tank & piping plan G-1.
IF YOU CHANGE OR ADD ANYTHING THAT IS NOT APPROVED PER SITE PLAN,
YOU NEED TO HAVE APPROVAL FROM OUR GROWTH MANAGEMENT
DEPARTMENT. PLEASE CHECK WITH OUR GROWTH MANAGEMENT DEPARTMENT
IF YOU NEED TO SUBMIT A MINOR SITE PLAN ADJUSTMENT.
07/24/2006 13 Comment THE SEALED PAGE 2 OF 7 AND 3A OF 7 IS MATCHING THE APPROVED SITE PLAN
BUT NOT MATCHING THE PAGE SP1 PAGE Tl, THE TANKS AND THE TANK PAD
ARE MATCHING THE ARPROVED SITE PLAN BUT ARE ALSO NOT MATCHING WITH
PAGE SP1
Response: Corrected See attached tank & piping plan G-1.