Loading...
HomeMy WebLinkAboutRESPONSES TO COMMENTSAddress: Cayuga Ave City I State / Zip Fort Pierce , FIL 34947 Parcel: 1428-702-0232-00017 Jurisdiction: St. Lucie County Zoning: IL Lot: 1 Block: 15 Owner(s): International Airport Businnes &plication Information OR b vrmti�um—iserz C)BqD-j- 0�68 —WctiVjty1Tqp �. 1,31;0=58w I F1�5� Permit Type: Building Commercial �'j j] F23 1 1 2039 Contractor Information: Contractor Name: Richard Morris Business Name: MDM Services, Inc Business Addr: 1412 SW 34� Ave SCANNED BY St. Lucie County Zoning Review 07/16/2006 1 / Comment THE GENERAL CONTRACTOR IS ON HOLD. W/C IS EXPIRED YOU NEED TO UPDATE YOUR LICENSE WITH OUR CONTRACTOR LICENSING DER PLEASE CONTACT; (772) 462-1673 Response: Updated licenses and insurance attached 07/18/2008 2 V/Comment APPLICATION AND FILLED LANDS AFF1 DAVIT ARE SIGNED BY GABRIEL VOLANTE. WHAT IS THE TITLE OF THIS PERSON? Response: Mr. Volante is one of the original Members of the LLC. See attached documents. ONLY OWNERS. REGISTERED MANAGEMENT MEMBERS OR REGISTERED AGENTS ARE ALLOWED TO SIGN THE APPLICATION. ACCORDING TO FLORIDA DEPARTMENT OF STATE GABRIEL VOLANTE IS NOT A REGISTERED MEMBER OR AGENT. WE NEED A NEW SIGNATURE PAGE AND A NEW FILLED LANDS AFFIDAVIT. THE CONTRACTOR IS ALLOWED TO SIGN BOTH SIDES OF THE APPLICATION. THE FILLED LANDS AFFIDAVIT NEEDS TO BE SIGNED BY OWNER OR REGISTERED AGENT 07/18/2008 3 Aornment WE NEED A SUB SUMMERY AND SUB AGREEMENTS FOR ELECTRICAL. PLUMBING, MECHANICAL AND ROOF. THE ROOF SUB REQUIRES A ROOF CONTRACTOR. GC IS NOT ALLOWED TO DO METAL ROOF Response. Will submit roof permit application and sub agreements once permit is ready. 07/18/2008 4 V Comment WE NEED A SECOND APPLICATION WITH FILLED LANDS AFFIDAVIT AND SUBS FOR THE CANOPY FOR THE FUEL ISLAND. WE CAN USE ONE SET OF PLANS, BUT THEY EACH NEED TO HAVE THEIR OWN PERMIT. Response: Will submitsub agreements once permit is ready forpickup. Canopy permit application and lands affidavit attached. PLEASE BRING IN A SECOND APPLICATION SIGNED AND NOTARIZED. ORIGINAL FILLED LANDS AFFIDAVIT. SUB SUMMARY AND A SUB AGREEMENT FOR THE ROOF. Response: Will submitcanopy roof permit application and sub agreements once permit is ready. Lands affidavit attached. IF THERE IS ANY PLUMBING OR ELECTRICAL WORK TO BE DONE WE NEED SUBS FOR THAT AS WELL. Response: Will submit sub agreements once permit is ready for pickup. 07/18/2008 5 Comment V THE PARKING SPACES AROUND THE CONVENIENCE STORE ARE NOT MEASURING THE REQUIRED 18'AND ARE MISSING THE WHEEL STOP. Response., Parking spaces are 16'to match approved site plan. Wheel stop added See attached tank & piping plan G-1. PLEASE REVISE ALL THE PAGES SHOWING THE PARKING. WE NEED 3 SEALED SETS OF CORRECTIONS. Response: Attached. 07/18/2008 6 Comment V/THE SUBMITTED COPY OF THE APPROVED SITE PLAN IS MISSING THE APPROVED LANDSCAPE PLAN. PLEASE PROVIDE US 3 COPIES OF APPROVED LANDSCAPE PLANS. Response: 111611 submitsub agreements once permitis ready forpickup. 07118/2008 7 Comment V1 ANY WALL OR GROUND SIGNS ON THE PROPERTY REQUIRE SEPARATE PERMITS. THEY WILL NOT BE INCLUDED IN THESE PERMITS. Response: Will submitseparate applications forsigns. 07/18/2008 8 Comment //ACCORDING TO THE RESOLUTION THE DEVELOPER NEEDS TO TAKE CARE OF: THE DEDICATION OF THE NORTH 30'OF THE PARCEL FOR FUTURE WIDENING OFTHEROAD L/ THE DEDICATION OF THE EAST 3'FOR FUTURE WIDENING OF THE ROAD A LEFT TURN LANE FOR THE PROPOSED PROJECT ON SAINT LUCIE BLVD 6'WIDE SIDEWALK ALONG THE FRONTAGE OF ST LUCIE BLVD. HAVE ANY OF THESE ITEMS BEEN TAKEN CARE OF OR ARE THEY IN PROCESS? IF NOT WHEN ARE THEY GOING TO BE DONE? IF ANY OF THE ITEMS HAS BEEN TAKEN CARE OF WE WOULD LIKE TO SEE ANY PROOF THAT THE COUNTY HAS SIGNED OFF ON IT, OR RECORDED COPIES Response: See attached Warranty Deed 07/18/2008 9 Comment /�H�AS THE ENVIRONMENTAL DEPARTMENT ISSUED A VEGETATION REMOVAL PERMIT? PLEASE PROVIDE US OF A COPY. Response: In process 07/181200810 Comment vz�THE TOTAL VALUE OF CONSTRUCTION FOR PHASE 4 (CONVENIENCE STORE AND CANOPY FOR FUEL ISLAND) IS S 1.000.000.00 ACCORDING TO THE BUILDING APPLICATION. PLEASE PROVIDE US A BREAK DOWN OF THE COSTS SPLIT OUT IN THE COST FOR THE CONVENIENCE STORE AND THE COSTS FOR THE CANOPY. Response: Convenience store $150,000.00 Canopy $200,000.00 07/18/2008 11 Comment \Y PARKING SPACE 1 IS INA DIFFERENT LOCATION THAN ON THE APPROVED SITE PLAN. YOU ADDED A GENERATOR ENCLOSURE ON THE LOCATION OF PARKING SPACE 1 THE AIR VAC IS IN THE REQUIRED 10'SETBACK AND UTILITY EASEMENT. THIS IS NOT ALLOWED. Response: Corrected. See attached tank & piping plan G-1. 07/18/200S 12 Comment THE CONCRETE TANK PAD HAS A DIFFERENT LAYOUT THAN IN THE APPROVED SITE PLAN AND IS NOW PARTLY GOING OVER THE PARKING SPACES. Response: Corrected. See attached tank & piping plan G-1. IF YOU CHANGE OR ADD ANYTHING THAT IS NOT APPROVED PER SITE PLAN, YOU NEED TO HAVE APPROVAL FROM OUR GROWTH MANAGEMENT DEPARTMENT. PLEASE CHECK WITH OUR GROWTH MANAGEMENT DEPARTMENT IF YOU NEED TO SUBMIT A MINOR SITE PLAN ADJUSTMENT. 07/24/2006 13 Comment THE SEALED PAGE 2 OF 7 AND 3A OF 7 IS MATCHING THE APPROVED SITE PLAN BUT NOT MATCHING THE PAGE SP1 PAGE Tl, THE TANKS AND THE TANK PAD ARE MATCHING THE ARPROVED SITE PLAN BUT ARE ALSO NOT MATCHING WITH PAGE SP1 Response: Corrected See attached tank & piping plan G-1.