PAUL WELCH INC.
Mechanical Electrical Civil Engineering
1984 S.W. Biltmore St. Suite#114
Port Saint Lucie, FL 34984
Phone (772) 785 - 9888
E-mail pwelchinc@aol.com
February 11, 2019
Re: Seaton Re -Roof
1005 Nettles Blvd.
Jensen Beach, FL
SCANNED
BY
St. Lucie County
SCOPE OF WORK:
Install new Metal Roof (Extreme Metal Fabricators, LLC "5-V Crimp" FL #17022.1) at above
referenced address over new underlayment, and existing plywood sheathing.
DESIGN CRITERIA•
FBC 2017
ASCE7-10
PROJECT DATA:
BUILDING HIEGHT = 20'-0"
A= 3'
MEAN ROOF HIEGHT = <28'
ROOF ANGLE = 4:12
SHAPE = PITCHED HIP
ADJUSTMENT FACTOR = 1.00
IMPROTANCE FACTOR = 1.00
WIND VELOCITY V ult=,165MPH
WIND VELOCITY V asd =128 MPH
EXPOSURE = D
ENCLOSURE CLASS = ENCLOSED BUILDING
INTERNAL PRESSURE COEFFICIENT = -0.18
APPLIED UPLIFT DESIGN PRESSURES PER ASCE (PSF):
ZONE 1 (Field) = 40.3
ZONE 2 (Perimeter/ Ridge), = -68.0
ZONE 3 (Corners) = -99.8 Paul Welch Inc.
Paul Welch P.E. Reg. No. 29945
1005 Nettles Blvd. Jensen Beach,, FL
M
so
Metal roofmg to be attached with corrosion resistant Hex -Head wood screws #10 x 1 %:"
minimum with weather sealing washers (minimum 3/16" penetration through deck). Fasteners
- shall -be placed through thelpanel-ribs-at-12" on center -across paffel-widtli and spacing along the
ribs as follows:
ZONE 1 (Field): FASTENER SPACING =16" O.C.
ZONE 2 (Perimeter/ Ridge): FASTENER SPACING = 16" O.C.
ZONE 3 (Corners): FASTENER SPACING = 8" O.C.
NOTE: PROVIDE LAP SEALANT FOR ALL ROOF PANEL LAPS FOR ROOF
SLOPES UNDER 3 VERT.:12 HORZ.
Design uplift Pressure for attachment as per above:
Product Design Pressure: Zones 1 & 2:-93.5PSF / Zone 3:-101PSF
Therefore O.K.
UNDERLAYMENT:
Underlayment shall be Tri-Built Roofing Products FL# 16048.1 "Tri-Built S/A HT TU".
While priming is optional, TRI-BUILT recommends priming the deck if the final roof cover is
not slated for installation within 24 hours.
Apply sheet parallel to the roof edge. Roll out approximately,10 ft of membrane and peel back
the first 3 ft of release film.!
Adhere the exposed part to the substrate and unroll ;the remaining membrane as far as possible.
Once the entire length of membrane is in place, peel -off the release film diagonally while
holding the membrane tight. Firmly roll the membrane into place to achieve a bond. Horizontal
seams should be minimum 8-inches, configured to 'shed water. Vertical seams should be 6inches
and staggered not less than 2-ft from vertical seams in the course below. Alf over -granule end -
laps shall be sealed using either heat -welding or hot air welding techniques. For Valleys and
Ridges: Cut underlayment into 4 to 6,foot lengths. Peel the release paper and center sheet over
valley or ridge. Drape and press sheet into place, working from the center of the valley or ridge
in each direction. For valleys, apply the sheet starting at the lowest point and work upward.
DECK INSTALLATION:i
Re -nail all plywood sheathing (15/32" thick minimum) with 8D ring -shank nails at 4" O.C.
perimeter and 6" O.C. field for all zones.
All work to be in compliance with product approval (FL # 17022.1), (FL# 16048.1),
manufacturer's specifications, and the Florida Building Code 12017.
Paul Welch Inc.
Paul Welch P.E. Reg. No. 29945
February 11, 2019
1005 Nettles Blvd. Jensen Beach, FL k Z� 2 of3
4
A=3'
Q,QQ, 3Q=ZONE DESIGNATION(TPPICAL)
NOTE: PROVIDE LAP SEALANT FOR ALL ROOF P LAPS. FOR ROOF
SLOPES UNDER 3 VER .:12 HORZ.
Paul Welch Inc.
Paul Welch P.E. Reg. No. 29945
February 11, 2019
I
i
1005 Nettles Blvd. Jensen Beach FL 3 of 3