HomeMy WebLinkAboutEVALUATION REPORTU
RECEIVED
MAR 12 2019
57. 6a61e County, Pormltting
NEMO l etc.
Certificate of Authorization N32455
353 Christian Street, Unit #13
Oxford, CT 06478
(203) 262-9245
ENGINEER EVALUATE TEST CONSULT CERTIFY
GAF Evaluation Report 01506.04.08-1114
SCampus Drive UEL_106ZI5�7R_Jy
Parsippany, NJ 07054 SCANNED Date of Issuance: 04/25/2008
(800) 766-3411 BY Revision 14: 06/06/2018
SCOPE: St. Lucie County
This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of
construction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen,
P.E. for use of the product under the Florida Building Code and Florida Building Code, Residential Volume. The
products described herein have been evaluated for compliance with the 6u'Edition (2017) Florida Building Code
sections noted herein.
DESCRIPTION: GAF Roof Underlayments
LABELING: Labeling shall be in accordance with the requirements of the Accredited Quality Assurance Agency noted
herein.
CONTINUED COMPLIANCE: This Evaluation Report is valid until the named product(s) changes, the referenced Quality
Assurance documentation changes, or provisions of the Code that relate to the product change. Acceptance of this
Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. of any changes to the
product(s), the Quality Assurance or the production facility location(s). NEMO ) etc. requires a complete review of this
Evaluation Report relative to updated Code requirements with each Code Cycle.
ADVERTISEMENT: The Evaluation Report number preceded by the words "NEMO Ietc. Evaluated" may be displayed in
advertising literature. If any portion of the Evaluation Report is displayed, then it shall be done in its entirety.
INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or
its distributors and shall be available for inspection at the job site at the request of the Building Official.
This Evaluation Report consists of pages 1 through 11.
Prepared by:
Robert J.M. Nieminen, P.E.
Florida Registration No. 59166, Florida DC4 ANE1993
The facsimile seal appearing was authorized by Robert
`.�Sg �9•"E''?
Nleminen, P.C. on 06/0512018. This does notserve as an
electronically signed document.
CERTIFICATION OF INDEPENDENCE:
1. NEMO ETC, LLC does not have, nor does it intend to acquire, or will it acquire, a financial interest in any company manufacturing or
distributing products it evaluates.
2. NEMO ETC, LLC is not owned, operated or controlled by any company manufacturing or distributing products it evaluates.
3. Robert Nieminen, P.E. does not have nor will acquire, a financial interest In any company manufacturing or distributing products for
which the evaluation reports are being issued.
4. Robert Nieminen, P.E. does not have, nor will acquire, a financial interest in any other entity involved in the approval process of the
product.
5: —"This is a building code evaluation. Neither NEMO Ietc. nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any
project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained
specifically for that purpose.
ONEMOletc.
ROOFING COMPONENT EVALUATION:
Product Category: Roofing
Sub -Category: Underlayment
Compliance Statement: GAF Roof Underlayments, as produced by GAF, have demonstrated compliance with the
following sections of the Florida Building Code through testing in accordance with the following Standards.
Compliance is subject to the Installation Requirements and Limitations / Conditions of Use set forth herein.
1504.3.1
1507.1.1, R905.1.1 Exception
1507.1.1, R905.1.1 Exception
1507.2.3 / 1507.1.1
1507.2.4 / 1507.1.1, 1507.2.9.2
1507.3.3
1507.11.2
Ent! _
ERD (TST 6049)
ERD (TST 6049)
ERD (TST 6049)
ERD (TST 6049)
ERD (TST 6049)
ERD (TST 6049)
ERD (TST 6049)
PRI (TST 5878)
PRI (TST 5878)
PRI (TST 5878)
PRI (TST 5878)
PRI (TST 5878)
PRI (TST 5878)
PRI (TST 5878)
PRI (TST 5878)
PRI (TST 5878)
PRI (TST 5878)
PRI (TST 5878)
PRI (TST 5878)
PRI (TST 5878)
PRI (TST 5878)
UL (TST 1740)
UL (TST 1740)
Miami -Dade (CER 1592)
Miami -Dade (CER 1592)
[CC -ES (EVL2396)
ICC-ES (EVL2396)
ICC-ES (EVL2396)
ICC-ES(EVL2396)
UL, LLC (QUA 9625)
UL, -LLC(QUA 9625)
UL, U.C. (QUA 9625)
UL, U.C. (QUA 9625)
Property. _ Standard
Wind Uplift FM 4474
Unrolling, Breaking Strength,
ASTM D226
Pliability
Tear Strength
ASTM D4533
Physical Properties
ASTM D6757
Physical Properties
ASTM D1970
Physical properties
FRSA/TRI April 2012 (04-12)
Physical Properties
ASTM D6164
Physical Properties
Physical Properties
FRSA/TRI April 2012 (Slippage)
ASTM D6164
ASTM D6164
ASTM D1970
ASTM D1970
Physical properties
ASTM D1970
ASTM D1970
Physical properties
Physical properties
ASTM D1970
ASTM D1970
Physical properties
Wind Uplift
Wind Uplift
Wind Uplift
FBC 1507.1.1 (Exception)
FBC 1507.1.1 (Exception)
FBC 1507.1.1 (Exception)
Physical properties
ASTM D6757
HVHZ compliance
HVHZ compliance
IBC/IRC compliance
IBC/IRC compliance
IBC/IRC compliance
IBC/IRC compliance
Quality Control
Quality Control
Quality Control
Quality Control
Reference.
R3360.02.07-2-R1
G12110.12.08
G34150.08.11
G40630.01.14-2B
G46160.09.14-3A
GAF-SC13285.03.17-3
GAF-SC13285.03.17-4
BRY-003-02-01
GAF-026-02-01
GAF-027-02-01
GAF-042-02-01
GAF-224-02-01
GAF-238-02-01
GAF-275-02-01
GAF-349-02-01
GAF-434-02-01
GAF-434-02-03
GAF-434-02-04
GAF-818-02-01
GAF-826-02-01
GAF-847-02-01
02NK22569
1ONK11990
16-1216.02
18-0119.15
ESR-2053
ESR-2808
ESR-1322
ESR-3286
Inspect,, File R10689 (BC)
Inspect, File R10689 (CA)
Inspect, File R10689 (GA)
Inspect, File R10689 (IN)
Year
2011
2009
2015
2016
2015
2012
2011
Date
03/13/2007
12/02/2008
11/14/2011
01/07/2014
09/09/2014
03/01/2017
03/01/2017
03/19/2002
03/26/2002
03/26/2002
06/03/2005
07/27/2009
03/03/2010
11/11/2010
07/03/2012
09/16/2013
09/16/2013
09/16/2013
12/05/2017
06/04/2018
06/04/2018
06/04/2002
05/18/2011
02/02/2017
02/22/2018
07/01/2017
07/01/2017
01/01/2018
02/01/2018
06/27/2017
07/07/2017
02/02/2018
01/10/2018
NEMO ETC, LLC Evaluation Report 01506.04.08-R14
Certifinne of Authatization#32455 6TMEDITION(2017)FBC NON-HVHZ EVALUATION FL10626-1114
GAF Roof Underlayments; (800) 766-3411 Revision 14: 06/05/2018
Page 2 of 11
ONEMID I etc
Eniitt
Examination
Reference
Date.—
UL, LLC. (QUA 9625)
Quality Control
Inspect, File R10689 INC)
03/14/2018
UL, LLC (QUA 9625)
Quality Control
Inspect, File R10689 (OK)
06/20/2017
UL, LLC (QUA 9625)
Quality Control
Inspect, File R10689 (ON, QC)
05/18/2018
UL, LLC (QUA 9625)
Quality Control
Inspect, File R10689 (SC)
06/16/2017
UL, LLC (QUA 9625)
Quality Control
Inspect, File R10689 (TX)
05/24/2016
UL, LLC (QUA 9625)
Quality Control
Inspect, File R10689 (INDIA)
04/13/2018
UL, LLC (QUA 9625)
Quality Control
Inspect, File R10689 (LA)
04/23/2018
4.1 Self -Adhering Underlayments:
4.1.1 LibertVTM SBS Self -Adhering Base/Ply Sheet is a smooth -surfaced, fiberglass -reinforced, self -adhering SBS modified
bitumen roof underlayment; meets ASTM D1970.
4.1.2 StormGuard° Film Surfaced Leak Barrier is a film -surfaced, fiberglass -reinforced, self -adhering SBS modified
bitumen roof underlayment; meets ASTM D1970. StormGuard® Film Surfaced Leak Barrier is also used as a
secondary water barrier to seal roof decks.
4.1.3 WeatherWatch® Mineral Surfaced Leak Barrier is a mineral -surfaced, fiberglass -reinforced, self -adhering SBS
modified bitumen roof underlayment; meets ASTM D1970. WeatherWatch° Mineral Surfaced Leak Barrier is also
used as a secondary water barrier to seal roof decks.
4.2 Mechanically Fastened Underlayments:
4.2.1 VersaShield° Fire -Resistant Roof Deck Protection is a non -asphaltic, fiberglass -based roof underlayment and/or
fire barrier; meets physical requirements of ASTM D6757.
4.2.2 Deck -Armor' Premium Breathable Roof Deck Protection is a non -woven, spun -bonded polypropylene laminated
polyethylene scrim sheet roof underlayment, available in 48-inch or 54-inch roll widths; meets FBC 1507.1.1 &
R905.1.1 (Exception).
4.2.3 RoofPro' SBS-Modified All -Purpose Underlayment is a fiberglass -reinforced, SBS modified bitumen roof
underlayment; meets AC165.
4.2.4 Shingle -Mate® Roof Deck Protection is a fiberglass reinforced, asphaltic roof underlayment; meets FBC 1507.1.1 &
R905.1.1 (Exception).
4.2.5 StormSafem Anchor Sheet is a polypropylene woven fabric which serves as an anchor sheet in two-ply roof
underlayment systems; meets FBC 1507.1.1 & R905.1.1 (Exception).
4.2.6 Tiger PawTM Roof Deck Protection is a non -woven, polypropylene reinforced, polymer coated roof underlayment;
meets FBC 1507.1.1 & R905.1.1 (Exception).
4.3 Asphalt -Applied Underlayments:
4.3.1 Ruberoid® Mop Granule is a granule -surfaced, polyester -reinforced, asphalt -applied SBS modified bitumen roof
underlayment; meets ASTM D6164.
4.3.2 Ruberoid® Mop Granule FR is a granule -surfaced, polyester -reinforced, asphalt -applied SBS modified bitumen roof
underlayment; meets ASTM D6164.
NENIO ETC, LLC Evaluation Report 01506.04.08-R14
Certificate ofAuthoriaation N32455 6r EDITION (2017) FBC NON-HVHZ EVALUATION FL10626-1174
GAF Roof Underlayments; (800) 766-3411 Revision 14: 06/05/2018
Page 3 of 11
ON EMO etc.
5.1 This is a building code evaluation. Neither NEMO ETC, LLC nor Robert Nieminen, P.E. are, in anyway, the Designer
of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting
or design guidance unless retained specifically for that purpose.
5.2 This Evaluation Report is not for use in FBC HVHZ jurisdictions.
5.3 Fire Classification is not part of this Evaluation Report; refer to current Approved Roofing Materials Directory or test
report from accredited testing agency for fire ratings of this product.
5.4 GAF Roof Underlayments may be used with any prepared roof cover where the product is specifically referenced
within FBC approval documents. If not listed, a request may be made to the Authority Having Jurisdiction for
approval based on this evaluation combined with supporting data for the prepared roof covering.
5.5 Allowable Roof Covers:
?,I SOV�RQPTI�tS
-
Asphalt
Foam -On
Wood
Slate or
Underlayrent
Nail -On Tile
Metal
Shakes&
Simulated
Shingles,
Tile
Shingles
Slate
Deck -Armor'° Premium Breathable
Contact
Contact
Contact
Roof Deck Protection
Yes
No
No
GAF
GAF
GAF
RoofProT"SBS-Modified All -Purpose
Underlayment
Yes
No
No
No
Yes
Yes
Shingle -Mate® Roof Deck Protection
Yes
No
No
No
No
No
Tiger Pawl" Roof Deck Protection
Yes
No
No
Contact
Contact
Contact
GAF
GAF
GAF
VersaShield° Fire -Resistant Roof Deck
Protection
Yes
No
No
No
No
No
LibertyT" SBS Self -Adhering Base/Ply
Sheet
Yes
No
No
No
No
No
StormGuarda Film Surfaced Leak
Barrier
Yes
No
No
Yes
No
No
WeatherWatcha Mineral Surfaced
Leak Barrier
Yes
No
No
No
No
No
Ruberoid® Mop Granule
Yes
Yes
Yes
Yes
Yes
See 5.5.1
Ruberoid® Mop Granule FR
Yes
Yes
Yes
FN
Yes
Yes
See 5.5.1
5.5.1 "Foam -On Tile' is limited to use of the following Approved tile adhesives / underlayment combinations.
ALLOWABLETABLE 1A: •.HESIVE/
.
UNDERVAYMENT COMBINATIONS
Adhesive Florida- Product Approval
Underlayments
Dow TileBondT FL22525
IRuberoid® Mop Granule; Ruberoid° Mop Granule FR
t Refer to Tile Manufacturers or Adhesive Manufacturer's Florida Product Approval for Overturning Moment Resistance Performance.
NEMO ETC, LLC I Evaluation Report 01506.04.08-R34
Certificate afAuthor&otion#32455 6T"EOITION(2017)FBC NON-HVHZ EVALUATION F1.10626-1114
GAF Roof Underlayments; (800) 766-3411 Revision 14: 06/05/2018
Page 4 of 11
IN NEMO I etc.
5.6 Allowable Substrates:
5.6.1 Direct -Bond to Deck:
✓ Liberty"" SBS Self -Adhering Base/Ply Sheet; StormGuard® Film Surfaced Leak Barrier and Weather Watch®
Mineral Surfaced Leak Barrier self -adhered to new untreated plywood or existing untreated ASTM D41
primed plywood.
✓ Ruberoid® Mop Granule and Ruberoid® Mop Granule FR in hot asphalt to ASTM D41 primed structural
concrete.
5.6.2 Bond to Mechanically Attached Base Laver:
✓ Libertyn' SBS Self -Adhering Base/Ply Sheet; StormGuard® Film Surfaced Leak Barrier and WeatherWatcho
Mineral Surfaced Leak Barrier self -adhered to ASTM D226, Type II felt
✓ Ruberoid® Mop Granule and Ruberoid® Mop Granule FR in hot asphalt to GAFGLAS® #80 Ultima'" Base Sheet
or Ruberoid® 20 Smooth.
5.6.3 Bond to Other Substrate TVDes:
✓ ASTM D41 primed metal (flashing metal, valley metal, etc.)
5.6.4 Wind Resistance for Underlayment Systems in Foam -On Tile Applications:
FRSA/TRI April 2012 (04-12) does not address wind uplift resistance of all underlayment systems beneath foam -
on or mortar -set tile systems, where the underlayment forms part of the load -path. The following wind uplift
limitations apply to underlayment systems that are not addressed in FRSA/TRI April 2012 (04-12) and are used in
foam -on or mortar -set tile applications. Maximum Design Pressure is the result of testing for wind load
resistance based on allowable wind loads and reflects the ultimate passing pressure divided by 2 (the 2 to 1
margin of safety per FBC 1504.9 has already been applied). Refer to FRSA/TRI April 2012 (04-12), Appendix A,
Table 1A or FBC 1609 for determination of design wind loads.
#1 Maximum Design Pressure =-45 psf.
Deck: Min. 19/32-inch plywood to meet project requirements to satisfaction of Authority Having
Jurisdiction.
Base Layer: GAFGLAS® #80 Ultima'' Base Sheet or Ruberoid® 20 Smooth mechanically attached with 12 ga., min.
1.25-inch long ring shank nails through 32 ga., 1-5/8-inch diameter tin caps spaced 9-inch o.c. at the
4-inch wide side laps and 9-inch o.c. at two (2), equally spaced, staggered center in the field of the
sheet.
Top Layer: Ruberoid® Mop Granule or Ruberoid® Mop Granule FR applied in full mopping of ASTM D312, Type
IV hot asphalt at 20 to 25 Ibs/square.
#2 Maximum Design Pressure=-75 psf.
Deck: Min. 19/32-inch plywood to meet project requirements to satisfaction of Authority Having
Jurisdiction.
Base Layer: GAFGLAS® #80 Ultima'" Base Sheet or Ruberoid® 20 Smooth mechanically attached with 12 ga., min.
1.25-inch long ring shank nails through 32 ga., 1-5/8-inch diameter tin caps spaced 8-inch o.c, at the
4-inch wide side laps and 8-inch o.c. at three (3), equally spaced, staggered center in the field of the
sheet.
Top Layer: Ruberoid® Mop Granule or Ruberoid® Mop Granule FR applied in full mopping of ASTM D312, Type
IV hot asphalt at 20 to 25 Ibs/square.
#3 Maximum Design Pressure = -442.5 psf.
Deck: Min. 2,500 psi structural concrete to meet project requirements to satisfaction of Authority Having
Jurisdiction
Base Layer: GAFGLAS #75 Base Sheet, Tri-Ply #75 Base Sheet, GAFGLAS $180 Ultima Base Sheet, GAFGLAS Ply 4,
Tri-Ply Ply 4 or GAFGLAS Flex Ply 6 applied in full mopping of ASTM D312, Type IV hot asphalt at 20
to 25 Ibs/square.
-- - - -Top Layer: Ruberoid® Mop Granule or Ruberoid° Mop Granule FR applied in full mopping of ASTM D312, Type
IV hot asphalt at 20 to 25 Ibs/square.
NEMO ETC, LLC Evaluation Report 01506.04.08-R34
Certifimte of Authorization#32455 6'"EDITION(2017)FBC NON-HVHZ EVALUATION F1.30626-1114
GAF Roof Underiayments; (800) 766-3411 Revision 14: 06/05/2018
Page 5 of 11
NNEMOletc.
5.6.4.1 For mechanically attached Base Sheet, the maximum design pressure for the selected assembly shall meet or
exceed that required under FRSA/TRI April 2012 (04-12), Appendix A, Table 1A.
Alternatively, the maximum design pressure for the selected assembly shall meet or exceed the Zone 1 design
pressure determined in accordance with FBC 1609. In this case, Zones 2 and 3 shall employ an attachment
density designed by a qualified design professional to resist the elevated pressure criteria. Commonly used
methods are ANSI/SPRI WDi, FM Loss Prevention Data Sheet 1-29 and Roofing Application Standard RAS 117.
Assemblies marked with an asterisk" carry the limitations set forth in Section 2.2.10.1 of FM Loss Prevention
Data Sheet 1-29 (January 2016) for Zone 2/3 enhancements.
5.7 Exposure Limitations:
5.7.1 Deck -Armor"" Premium Breathable Roof Deck Protection; RcofProTM SBS-Modified All -Purpose Underlayment;
Shingle -Mate® Roof Deck Protection; StormSafe'" Anchor Sheet and Tiger Paw'" Roof Deck Protection shall not
be left exposed for longer than 30-days after installation.
5.7.2 VersaShield® Fire -Resistant Roof Deck Protection, Ruberoid® Mop Granule and Ruberoids Mop Granule FR shall
not be left exposed for longer than 180-days after installation.
5.7.3 Liberty'" SBS Self -Adhering Base/Ply Sheet; StormGuard® Film Surfaced Leak Barrier and WeatherWatchs Mineral
Surfaced Leak Barrier shall not be left exposed for longer than 30-days after installation.
5.8
6.1
6.2
6.3
6.4
6.5
6.5.1
6.5.2
Tile Slippage Limitations (TAS 103 per FRSAlTRI April 2012 (04-12)):
When loading roof tiles on the underlayment in direct -deck tile assemblies, the maximum roof slope shall be as
follows. These slope limitations can only be exceeded by using battens during loading of the roof tiles.
Underlayment
TileProfile
Staging Method
Maximum
Slope
Ruberoid° Mop Granule
Flat
Max. 10-tile stack
4:12
Flat
Max. 6-tile stack (4 over 2)
5:12
Lugged
Max. 10-tile stack
5:12
Ruberoid° Mop Granule FR
Flat or Lugged
Max. 6-tile stack (4 over 2)
5:12
Lugged
Max. 10-tile stack
4:12
GAF Roof Underlayments shall be installed in accordance with GAF published installation instructions subject to
the Limitations set forth in Section 5 herein and the specifics noted below.
Re -fasten any loose decking panels, and check for protruding nail heads. Sweep the substrate thoroughly to
remove any dust and debris priorto application and prime the substrate (if applicable).
Install self -adhering underlayments when ambient temperatures are minimum 45"F and rising.
All metal surfaces shall be primed with MatrixTM 307 Premium Asphalt Primer or alternate GAF accepted ASTM
D41 primer prior to application of self -adhering membranes.
:Roof beck Protection:
Shall be installed in compliance with the requirements for ASTM D226, Type 1 or II underlayment in FBC Table
1507.1.1 or R905.1.1 for the type of prepared roof covering to be installed, considering the wider sheet -width for
double -layer applications.
Minimum fasteners shall be 1-inch diameter plastic -capped corrosion resistant nails or 1-inch diameter plastic -
capped, corrosion resistant staples.
Code Reference: The Exception statement in FBC 1507.1.1 and FBC R905.1.1 requires use of metal cap nails
where the ultimate design wind speed, Veh, equals or exceeds 150 mph.
NEMO ETC, LLC Evaluation Report 01506.04.08-R14
Cerfifane ofAuth.,h. ion p324SS 6'"EDITION (2017) FBC NON-HVHZ EVALUATION FL10626-R34
GAF Roof Underlayments; (800) 766-3411 Revision 14: 06/05/2018
Page 6 of 11
*NEMO I etc.
6.5.3 Optional, or if required by the Authority Having Jurisdiction: Install a leak barrier of Liberty'" SBS Self -Adhering
Base/Ply Sheet; StormGuard® Film Surfaced Leak Barrier; UnderRoof" 2 Polyester -Surfaced Leak Barrier or
WeatherWatch® Mineral Surfaced Leak Barrier at vulnerable leak areas, including but not limited to eaves,
valleys, rakes, skylights and dormers. At eaves and valleys, install the leak barrier prior to installation of the
underlayment. Along the rake, install the underlayment, leaving 6 to 8-inch of the deck exposed, and then install
the leak barrier over the underlayment and exposed decking. At other areas, install the leak barrier over the
underlayment.
6.5.4 Non -Tile Roof Installations:
Single Laver: Roof Slope > 4:12:
Starting at the eave, fasten the eave edge and 6-inch wide end -laps 6-inch o.c. Fasten in the field of the roll 12-
inch o.c. in two, equally spaced, staggered center rows.
Continue upslope in a similar manner, maintaining minimum 3-inch side -laps and minimum 6-inch end -laps.
Fasten 6-inch c.c. in the laps and 12-inch o.c. in two, equally spaced, staggered center rows in the field. Ensure
all end laps are staggered at least 3-feet apart.
Double Laver: 2:12 < Roof Slope <4:12:
If leak barrier (6.3.3) is not used, install a half -width sheet at the eave prior to subsequent courses. Starting at
the eave, fasten the eave edge and 6-inch wide end -laps 6-inch o.c. Fasten in the field of the roll 12-inch o.c. in
two, equally spaced, staggered center rows.
Continue upslope in a similar manner, with minimum 25.5-inch side -laps for 48-inch wide rolls (resulting in
maximum 22.5-inch exposure) or minimum 28.5-inch side -laps for 54-inch wide rolls (resulting in maximum 25.5-
inch exposure) and minimum 6-inch end -laps. Fasten 6-inch o.c. along the low edge and end laps and 12-inch o.c.
in two, equally spaced, staggered center rows in the field. Ensure all end laps are staggered at least 3-feet apart.
6.6 I Tiger'PawTM Roof Deck Protectiorf:
6.6.1 Shall be installed in compliance with the requirements for ASTM D226, Type I or II underlayment in FBC Table
1507.1.1 or R905.1.1 for the type of prepared roof covering to be installed, considering the wider sheet -width for
double -layer applications.
6.6.2 Minimum fasteners shall be 1-inch diameter plastic -capped corrosion resistant nails or 1-inch diameter plastic -
capped, corrosion resistant staples.
Code Reference: The Exception statement in FBC 1507.1.1 and FBC R905.1.1 requires use of metal cap nails
where the ultimate design wind speed, Vun, equals or exceeds 150 mph.
6.6.3 Optional, or if required by the Authority Having Jurisdiction: Install a leak barrier of Liberty" SBS Self -Adhering
Base/Ply Sheet; StormGuard® Film Surfaced Leak Barrier; UnderRoof" 2 Polyester -Surfaced Leak Barrier or
WeatherWatch® Mineral Surfaced Leak Barrier at vulnerable leak areas, including but not limited to eaves,
valleys, rakes, skylights and dormers. At eaves and valleys, install the leak barrier prior to installation of the
underlayment. Along the rake, install the underlayment, leaving 6 to 8-inch of the deck exposed, and then install
the leak barrier over the underlayment and exposed decking. At other areas, install the leak barrier over the
underlayment.
6.6.4 Non -Tile Roof Installations:
Single Laver: Roof Slope> 4:12:
Starting at the eave, fasten the eave edge and 6-inch wide end -laps 6-inch o.c. Fasten in the field of the roll 12-
inch o.c. in two, equally spaced, staggered center rows.
Continue upslope in a similar manner, maintaining minimum 3-inch side -laps and minimum 6-inch end -laps.
Fasten 6-inch o.c. in the laps and 12-inch o.c. in two, equally spaced, staggered center rows in the field. Ensure
all end laps are staggered at least 3-feet apart.
NEIAO ETC, LLC Evaluation Report 01506.04.08-R14
Certificate of Authorization p32455 6mEDITION(2017)FBC NON-HVHZ EVALUATION FL10626-R14
GAF Roof Underlayments; (800) 766-3411 Revision 14: 06/05/2018
Page 7 of 11
ONEMO I etc.
Double Laver; 2:12 < Roof Slope <4:12:
If leak barrier (6.4.3) is not used, install a half -width sheet at the eave prior to subsequent courses. Starting at
the eave, fasten the eave edge and 6-inch wide end -laps 6-inch o.c. Fasten in the field of the roll 12-inch o.c. in
two, equally spaced, staggered center rows.
Continue upslope in a similar manner, with minimum 25.5-inch side -laps (resulting in maximum 22.5-inch
exposure) and minimum 6-inch end -laps. Fasten 6-inch o.c. along the low edge and end laps and 12-inch o.c. in
two, equally spaced, staggered center rows in the field. Ensure all end laps are staggered at least 3-feet apart.
6.7 StormSafe"'.Anchor Sheet:
6.7.1 StormSafe'" Anchor Sheet is limited to use as a mechanically attached base layer in 2-ply underlayment systems.
6.7.2 Minimum fasteners shall be 1-inch diameter plastic- or steel -capped corrosion resistant nails; corrosion -resistant
nails & 1-5/8-inch tin -caps; or Drill-Tec screws and plates.
Code Reference: The Exception statement in FBC 1507.1.1 and FBC R905.1.1 requires use of metal cap nails
where the ultimate design wind speed, Vam, equals or exceeds 150 mph.
6.7.3 Non -Tile Roof Installations:
Starting at the eave, fasten the eave edge and 6-inch wide end -laps 6-inch o.c. Fasten in the field of the roll 12-
inch o.c. in two, equally spaced, staggered center rows.
Continue upslope in a similar manner, maintaining minimum 3-inch side -laps and minimum 6-inch end -laps.
Fasten 6-inch o.c. in the laps and 12-inch o.c. in two, equally spaced, staggered center rows in the field. Ensure
all end laps are staggered at least 3-feet apart.
One the same day, install Liberty'"' SBS Self -Adhering Base/Ply; StormGuard8 Film Surfaced Leak Barrier or
WeatherWatch® Mineral Surfaced Leak Barrier over the StormSafe'' Anchor Sheet.
6.8 ROO[Pr0" SBS-Modified All-Purpose.Underlayment and Shingle -Mate® Roof Deck Protection:.
6.8.1 Shall be installed in compliance with the requirements for ASTM D226, Type I or II underlayment in FBC Table
1507.1.1 or R905.1.1 for the type of prepared roof covering to be installed. No hammer tacks or staples are
permitted.
Code Reference: The Exception statement in FBC 1507.1.1 and FBC R905.1.1 requires use of metal cap nails
where the ultimate design wind speed, VI,, equals or exceeds 150 mph.
6.8.2 Optional, or if required by the Authority Having Jurisdiction: Install a leak barrier of Liberty' SBS Self -Adhering
Base/Ply Sheet, StormGuard® Film Surfaced Leak Barrier or WeatherWatch® Mineral Surfaced Leak Barrier at
vulnerable leak areas, including but not limited to eaves, valleys, rakes, skylights and dormers. At eaves and
valleys, install the leak barrier prior to installation of the underlayment. Along the rake, install the underlayment,
leaving 6 to 8-inch of the deck exposed, and then install the leak barrier over the underlayment and exposed
decking. At other areas, install the leak barrier over the underlayment.
6.9 VersaShieldO Fire -Resistant Deck Protection: '
6.9.1 Shall be installed in compliance with the codified requirements for ASTM D6757 underlayment in FBC Table
1507.1.1 for the type of prepared roof covering to be installed. No hammer tacks or staples are permitted.
6.9.2 Optional, or if required by the Authority Having Jurisdiction: Install a leak barrier of Liberty' SBS Self -Adhering
Base/Ply Sheet; StormGuard° Film Surfaced Leak Barrier or WeatherWatch® Mineral Surfaced at vulnerable
leak areas, including but not limited to eaves, valleys, rakes, skylights and dormers. At eaves and valleys, install
the leak barrier prior to installation of the underlayment. Along the rake, install the underlayment, leaving 6 to
8-inch of the deck exposed, and then install the leak barrier over the underlayment and exposed decking. At
other areas, install the leak barrier over the underlayment.
NEMO ETC, LLC Evaluation Report 01506.04.08-R34
certificate of Authorbation#32455 6'"EDITION(2017)F13C NON-HVHZ EVALUATION FL10626-1114
GAF Roof Underlayments; (800) 766-3411 Revision 14: 06/05/2019
Page 8 of 11
ON EMO I etc.
6.10 Libe rty'" SBS Self -Adhering Base/Ply Sheet: -
6.10.1 Shall be installed in compliance with the codified requirements for ASTM D1970 underlayment in FBC Table
1507.1.1 for the type of prepared roof covering to be installed.
6.10.2 The minimum and maximum roof slopes are Y:12 and 6:12, respectively. Back -nailing is required when slope is
1:12 or greater. Back -nailing shall consist of minimum 1-inch square or round cap nails spaced 18" o.c. within 3-
inch side laps.
6.10.3 Non -Tile Applications:
Shall be fully self -adhered to the substrates noted in Section 5.6. For direct -bond to deck applications plywood
shall be primed with Matrix'" 307 Premium Asphalt Primer or alternate GAF accepted ASTM D41 primer at Y= to
Y. gallon per square.
Prior to removal of release film, align sheets properly starting at the low -point of the roof leave) with the selvage
edge upslope and for minimum 2-inch overhang at eaves and rakes. Roll out sheet and allow to 'relax' for min. 30
minutes. Remove the lower piece of release film and bond to substrate and fold the overhanging 2-inch over the
eave and nail into place 12" o.c. Remove the top piece of release film and bond to substrate. Install primed drip
edge and fasten to meet FBC Chapter 16 wind load requirements. Install 1/8-inch troweling of MatrixTM 201
Premium SBS Flashing Cement over drip edge.
Continue upslope in a similar manner, maintaining minimum 3-inch side -laps and minimum 6-inch end -laps.
Ensure all end laps are staggered at least 18-inch apart.
Use a weighted lawn or linoleum roller to ensure complete adhesion to the substrate. Use a hand roller to firmly
bond side and end laps.
6.11 StormGuard® Film. Surfaced Leak Barrier: -
6.11.1 Shall be installed in compliance with the codified requirements for ASTM D1970 underlayment in FBC Table
1507.1.1 for the type of prepared roof covering to be installed.
6.11.2 Back -nailing is required. Back -nailing shall consist of minimum 1-inch square or round cap nails spaced 18" o.c.
within 3-inch side laps.
6.11.3 Non -Tile Applications:
Shall be fully self -adhered to the substrates noted in Section 5.6. Prior to removal of release film, align sheets
properly starting at the low -point of the roof leave) with the selvage edge upslope and for minimum 2-inch
overhang at eaves and rakes. Remove the lower piece of release film and bond to substrate and fold the
overhanging 2-inch over the eave and nail into place 12" o.c. Remove the top piece of release film and bond to
substrate. Install primed drip edge and fasten to meet FBC Chapter 16 wind load requirements. Install 1/8-inch
troweling of Matrix'" 201 Premium SBS Flashing Cement over drip edge.
Continue upslope in a similar manner, maintaining minimum 3-inch side -laps and minimum 6-inch end -laps.
Ensure all end laps are staggered at least 18-inch apart.
Use a hand roller to firmly bond side and end laps.
NEMO ETC, LLC Evaluation Report 01506.04.08-R34
Certifimte o/Autharizotion #32455 OEDITION (20171 FBC NON-HVHZ EVALUATION F1.10626-R14
GAF Roof Underlayments; (800) 766-3411 Revision 14: 06/05/2018
Page 9 of 11
ONEMID etc.
6.12 WeatherWatchO Mineral Surfaced Leak, Barrier:
6.12.1 Shall be installed in compliance with the codified requirements for ASTM D1970 underlayment in FBC Table
1507.1.1 for the type of prepared roof covering to be installed.
6.12.2 WeatherWatchO Mineral Surfaced Leak Barrier may be installed as a secondary water barrier using minimum 4-
inch wide rolls to seal plywood deckjoints prior to installation of the primary underlayment system.
6.12.3 Back -nailing is required. Back -nailing shall consist of minimum 1-inch square or round cap nails spaced 18" o.c.
within 4-inch side laps.
6.12.4 Non -Tile Applications:
Shall be fully self -adhered to the substrates noted in Section 5.6. Prior to removal of release film, align sheets
properly starting at the low -point of the roof (eave) with the selvage edge upslope and for minimum 2-inch
overhang at eaves and rakes. Remove the lower piece of release film and bond to substrate and fold the
overhanging 2-inch over the eave and nail into place 12" o.c. Remove the top piece of release film and bond to
substrate. Install primed drip edge and fasten to meet FBC Chapter 16 wind load requirements. Install 1/8-inch
troweling of Matrixm 201 Premium SBS Flashing Cement over drip edge.
Continue upslope in a similar manner, maintaining minimum 3-inch side -laps and minimum 6-inch end -laps.
Ensure all end laps are staggered at least 18-feet apart.
Use a hand roller to firmly bond side and end laps.
6.13 I .Ruberoid® Mop Granule; Ruberoid® Mop Granule FIR:
6.13.1 Ruberoid® Mop Granule or Ruberoidm Mop Granule FIR shall be installed in compliance with current GAF
published installation requirements.
6.13.2 For use in tile applications, Ruberoid° Mop Granule or Ruberoid® Mop Granule FR are for use as an alternate to
"Mineral Surface Roll Roofing" (ASTM.D6380, Class M) in the "Single Ply System" from FRSA/TRI April 2012 (04-
12) beneath mechanically fastened tile roof systems or the Hot Asphalt applied "Cap Sheet' in the 'Two Ply
System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened or adhered tile roof systems.
6.13.3 Fully adhere in ASTM D312, Type IV hot -asphalt to the substrates noted in Section 5.6. Side laps shall be
minimum 4-inch and end -laps minimum 6-inch wide, and offset end -laps minimum 3-feet from course to course.
Side and end -laps shall be fully. adhered in a complete mopping of hot asphalt with asphalt extending
approximately 3/8-inch beyond the lap edge.
6.13.4 Consult GAF instructions regarding back -nailing requirements.
6.14 Tile Staging (Ruberoid® Mop Granule; Ruberoid® Mop Granule FRI:
6.14.1 Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the underlayment.
Refer to Table 2 herein, and GAF published requirements for tile staging.
6.14.2 Battens and/or Counter -battens, as required by the tile manufacturer and FRSA/TRI April 2012 (04-12) must be
used on all roof slopes greater than 7:12. Precautions should be taken as needed, such as the use of battens or
nail -boards, to prevent tile sliding and/or damage to the underlayment during the loading process.
NEMO ETC, LLC Evaluation Report 01506.04.08-R34
Certificate of Authorization a32455 6TMEDITION(2017)FBC NON-HVHZ EVALUATION FL30626-1114
GAF Roof Underlayments; (8001 766-3411 Revision 14: 06/05/2018
Page 10 of 11
A
ONEMO I etc.
As required by the Building Official or Authority Having Jurisdiction to
product.
Contact the noted CA agency for information on product locations covered for F.A.C. 61G20-3 CA requirements.
The following plants have qualified products under their respective physical properties specifications.
Plant
Specificatioh
Rrodud
s
Charleston,SC
FBC 1507.1.1(Exception)
Tiger Paw"' Roof Deck Protection
Conover, NC
ASTM D6757
VersaShield® Fire -Resistant Roof Deck Protection
Dadra, India
FBC 1507.1.1(Exception)
Tiger Paw— Roof Deck Protection
Fontana, CA
AC165
RoofPro' SBS-Modified All -Purpose Underlayment
Homer, LA
FBC 1507.1.1(Exception)
Tiger PawTM Roof Deck Protection (WIP)
McGregor, TX
FBC 1507.1.1(Exception)
Shingle -Mate° Roof Deck Protection
Mission, BC
FBC 1507.1.1(Exception)
Tiger Paw"' Roof Deck Protection
Mt. Vernon, IN
ASTM D1970
Liberty`" SBS Self -Adhering Base/Ply Sheet; StormGuard® Film Surfaced
Leak Barrier; WeatherWatch° Mineral Surfaced Leak Barrier
North Bay, Ontario
FBC 1507.1.1(Exception)
Deck -Armor'" Premium Breathable Roof Deck Protection, StormSafe—
Anchor Sheet, Tiger Paw— Roof Deck Protection (conversion)
Pryor, OK
FBC 1507.1.1(Exception)
Shingle -Mate° Roof Deck Protection
Savannah, GA
ASTM D1970
StormGuard® Film Surfaced Leak Barrier; WeatherWatch° Mineral
Surfaced Leak Barrier
ASTM D6164
Ruberoid® Mop Granule; Ruberoid® Mop Granule FR
UL, L-C. — QUA9625; (847) 664-3281
-END OF EVALUATION REPORT -
NEMO ETC, LLC
certificote ofAuthori:otion k32455 6"EDITION (2017) FBC NON-HVHZ EVALUATION
GAF Roof Underiayments; (800) 766-3411
Evaluation Report 01506.04.08-1134
FL10626-1114
Revision 14: 06/05/2018
Page 11 of 11