Loading...
HomeMy WebLinkAboutPLANS9 1 8 1 7 An 1 6 1 5 1 4 1 3 1 2 t qo l/ c— e Y __ RESIDENTIAL GENERIC CTURAL PLAN. IGEMFYW THE SMEETNOnmAMINGO nucTUREvCLELSMELr w DESIGNED FOR V '200 MPH., COMMON SOLAR COMPONENT E%AMPLES SHOWN- nccoMMDDAM CXCUu EDvnNO UPOPT , u1ERAL Poac6su+D FBC 2017 6D EDITION FLORIDA BUILDING CODE Z ULT— NO PLANS ON FILE- EACH PERMIT REQUIRES SIGN. APPEARANCE MAY VARY. EQUIPMENT DEnnmADS.TNIS ISATTPSTEDroDv hrc slcuATUNE ANOSEA. O I RISK II, EXPOSURE D. RAISED SEAL PLAN FROM FOR ON THIS DRANNG AT THE UPPER RIGHT. U n B c1, g E a o w 4 H w Z D t7 m w N b (aJ z 3 C 3 0 IRONRIDGE PV RAIL GENERIC INSTALLATION PLAN 1. THIS IS A SINGLE SHEET GENERIC STRUCTURAL PLAN. ELECTRICAL PLAN IS SEPARATELY SEALED DOCUMENT. 2. THIS PLAN OFFERS THREE INSTALLATION METHODS. a. FRAMING METHOD. SEE DRAWINGS. b. SHEETING METHOD. SEE DRAWINGS. C. STANDING STANDING SEAM/PBR(PURLIN-BEARING) METALROOF. USE —CLAMP/BRACKET OF CHOICE; - ACE. http://www.pmcind.com/aceciamp/ S-S. https7/w ww.s-S.com/products/clamps-brackets/s-5-u-clamps/ https://www.s-5.com/products/clamps-brackets/proteabracket/ 3. CONTRACTOR SHALL MAKE CLEAR TO AHJ WHICH INSTALLATION DETAILS WILL BE USED. 4. SOLAR EQUIPMENT ADDS LESS THAN 4-PSF GRAVITY LOAD TO STRUCTURE. S. THERE SHALL BE A PV MODULE TO RAIL MOUNTING CLAMP AT EVERY MODULE/RAIL CROSSING POINT WITH MINIMUM 4 CLAMPS PER MODULE. ADJOINING MODULES SHALL SHARE MID CLAMPS. MODULES MAY BE LANDSCAPE OR PORTRAIT AT CONTRACTOR OPTION. 6. PV MOUNTING RAILS SHALL BE INSTALLED PERPENDICULAR TO ROOF FRAMING. SEE ROOF ATTACHMENT SPAN TABLE @ LOWER RIGHT 7. THERE SHALL BE A MINIMUM OF TWO RAILS UNDER EACH PV MODULE. 8. RAILS SHALL NOT CANTILEVER BEYOND OUTSIDE OF END ROOF ATTACHMENT BY MORE THAN V 9. RAILS SHALL ATTACH TO ROOF THRU L-FEET AS SHOWN HEREON. L-FEET REQUIRE FLASHINGS WHICH CAN BE SF -SO (SELF -FLASHING, SHEETING ONLY) SHOWN HEREON OR MIN 4" x 8" x 26 GA. GALV , 0.032 ALUM, OR INDUSTRY STANDARD OEM FLASHINGS OVER ATTACHMENTS LAGGED INTO ROOF FRAMING, E.G. SOLAR MOUNT, IRONRIDGE FLASHFOOTlor2, OTHER ACCEPTABLETO AHJ. 10. SF -SO ROOF ATTACHMENTS ARE INTENDED TO BE INSTALLED INTO SHEETING ALONE, HAVE BEEN SO TESTED AND ARE RATED AT 900-POUNDS ALLOWABLE PER ROOF ATTACHMENT. 11. ALL FLASHINGS SHALL BE INSTALLED IN A GENEROUS BED OF FLORIDA PRODUCT CONTROL APPROVED(PCA) POLYURETHANE ROOF SEALANT. 12. LONG L-FEET &/OR STANDOFFS ARE PERMITTED AS NEEDED FOR ROOF CLEARANCE. 13. ENGINEER OF RECORD (EOR) PREFERS EMAIL COMMUNICATION: ST.LUCIE PLAN R PLLDA = DATE Y y E r 3/8-16 x: = 7r� HE%HRQ@gM 'r a --• -� FLABJJET0 . FOR GALVANIZED PLATE a3 IRONRIDGE RAIL, APPEARANCE MAY VARY STANDARD OR FOR 7-IN L-FOOT. MIN. 4 #14 X2' EMS SS PER ATTACHMENT o EPDM—/ 3Z -p'J s i, '•� GASKET ' g � 3/8' SS BOLT u�$ _ F dos - — Ft ^SHEETNG OI Y, SELFFIASHNG ROOF AIIM"ENI 9 I 8 I 7 SERRATED L ROOF MOUNT ROOF OPTIONAL DOW FOAM . TILE ROOF STANDOFF WATERPROOFING OR LONG WITH SONOLASTIC L-FOOT MIN. 4 #14 X 2" SMS -SS NP-1 OR EQUAL 1' BEYOND BOTTOM OF DECK POLYURETHANE CAULK ❑ :r" 13 ewe ■ calm. PZt: ROOF INTERIOR PZ3: ROOF PERIMETER (MIN. 3' 8 LEAST OF 40% EAVE HEIGHT OR 10%BUILDING _ W. PZ3: OUTSIDE CORNERS L & W - PZ2, a - PZ2 WIDTH., h- EAVE HEIGHT. 6 1 EXIST. MErAL DECKING ON ROOF SHEATHING PROOFING EXISTING FRAMING 5/16' CRS. LAG W/ 3" THREAD EMBEDMENT IN BLOCKING, ]GIST, OR TRUSS DPRESSUREZONES. 5 4 ALLEN GE2ELMAN 16502 MANNA RD. LUTZ, FLORIDA 33549 A PH.813 9091956 Allen@Ge elmaOPEmm Nvw.GeielmaME.cam PE 59180 FE=121019. — uS4Mti n A B DRAFTSMAN: ALPERICELI alpe4ce0(�maausledG C Z Z O Y N V W /ld IRONRIDGE Roof Mount System ]1R10Ra6 MICO N mlmRap Bardwspllass 00 <30' WIND (MPH) PZ1 PZ2 IRONRIDGE RAIL 110 8 fi PL B: 4 %R-10 120 8 8 2 XR-10 130 6 4 B XR-100 140 6 4 FJ; 2 RR-100 150 6 4 2 %R-100 160 6 4----�-- %R-1000 170 4 4 XR-1000 180 5t. Luc APPROPRIATE LICENSE OR OWNER/BUILDER 0 4 1018 E AI—IR-7 08.AUG.18 F 1 5t. Luc APPROPRIATE LICENSE OR OWNER/BUILDER 0 4 1018 E AI—IR-7 08.AUG.18 F 1