SCOPE:
This Evaluation Report is issued under Rule 61620-3 and the applicable rules and regulations governing the use of
construction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen,
P.E. for use of the product under the Florida Building Code. The product described �e eNl Dbpee��alluuaateeddA7TACHMEN78
compliance with the 6`" Edition (2017) Florida Building Code sections noted herein. ARETHERESPONSIBILRYOFTHE
DESCRIPTION: TRI-BUILT Modified Bitumen Roof Systems CONTRACTOR OR RECORD
LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted
herein.
CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s) changes, the referenced
Quality Assurance documentation changes, or provisions of the Code that relate to the product change. Acceptance of
this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product
changes or the referenced Quality Assurance documentation changes. Trinity( ERD requires a complete review of this
Evaluation Report relative to updated Code requirements with each Code Cycle.
ADVERTISEMENT: The Evaluation Report number preceded by the words "Trinity I ERD Evaluated" may be displayed in
advertising literature. If any portion of the Evaluation Report is displayed, then it shall be done in its entirety.
INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or
its distributors and shall be available for inspection at the job site at the request of the Building Official.
This Evaluation Report consists of pages 1 through 4, plus a 26-page Appendix.
Prepared by:
Robert J.M. Nieminen, P.E.
Florida Registration No. 59166, Florida DCA ANE1983
THESE PLANS AND ALL PROPOSED WORK
REQU R DEBYFIELDINSPEC OHSTHAT
COMPLNECESSARY
WI �ALLLL. APPLICABLETCODES.
The facsimile seal appearing was authorized by Robert Nieminen,
P.E. on 09/25/2017. This does not serve as an electronically signed
document.
CERTIFICATION OF INDEPENDENCE:
1. Exterior Research & Design, LLC. d/b/a Trinity I ERD does not have, nor does it intend to acquire or will it acquire, a financial interest
in any company manufacturing or distributing products it evaluates.
2. Exterior Research & Design, LLC. d/b/a Trinity I ERD is not owned, operated or controlled by any company manufacturing or
distributing products it evaluates.
3. Robert Nieminen, P.E. does not have nor will acquire, a financial interest in any company manufacturing or distributing products for
which the evaluation reports are being issued.
4. Robert Nieminen, P.E. does not have, nor will acquire, a financial interest in any other entity involved in the approval process of the
product.
5. This is a building code evaluation. Neither Trinity l ERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any
project on which this Evaluati eport, or previous versions thereof, is/was used for permitting or design guidance unless retained
specifically for that purposeC Jam`l/'57O G
ST. LUCIE COUNTY BUILDING DIV ON
REVIEWED FOR COMPLIANCE-,,
PLANS AND PERMITT7UST BE
SITE OR NO INSPECTION(S) I
'5T2 uu 4A'f�
Table
Deck
Application
3A-1
Wood
New or Rero
3A-2
Wood
New, Reroof
1B
Wood
New, Reroof
SC
Wood
New, Reroof
1D
Wood
New, Reroof
lE-1
Wood
New or Reno
1E-2
Wood
New, Reroof
1F
Wood
New or Rerc,
2A
Steel or Structural concrete
New, Reroof
2B
Steel or Structural concrete
New, Reroof
2C -
Steel or Structural concrete
New, Reroof
3A
Structural concrete
New or Pero
.,.,V.r�
CE511n : i.I �..
a.
ittC�.i.i
TYP
A-2
or 6'ecoye_•"
A-2
or Reto'y. QjrN'd
B
or ffecovetj --i >
C
or Recover
Mech. Attached Anchor
Mech. Attached Anchor
Mech. Attached Base In.
Prelim. Attached
3onded,Insulation, Bonded Roof Cover
, Bonded'TolYInsulation, Bonded Roof Cover
ded Roof Cover
ch. Attached Base Sheet, Bonded Roof Cover
Base Sheet, Bonded Roof Cover
Base Sheet, Bonded Roof Cover
Bonded Roof Cover
ulation, Bonded Roof Cover
sulation, Mech. Attached Bz
Bonded Roof Cover
"'A
TRINITY ERD
4
5
5
6
6
7
8
8
9
9
10
11-14
3B
Structural concrete
New or Reroof (Tear -Off)
F
Non -Insulated, Bonded Roof Cover
14
4A
LWIC
New or Reroof (Tear -Off)
A-1
Bonded Insulation, Bonded Roof Cover
15-16
48
LWIC
New or Reroof (Tear -Off)
A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
16
'f '4C
LWIC
New or Reroof (Tear -Off)
E
Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover
17-19
'-SA
CWF
New or Reroof (Tear -Off)
A-1
Bonded Insulation, Bonded Roof Cover
20
5B
CWF
New, Reroof (Tear -Off) or Recover
A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
21
SC
CWF
New, Reroof (Tear -Off) or Recover
B
Mech. Attached Base Insulation, Bonded Top Insulation, Bonded Roof Cover
22
- SO
CWF
New, Reroof (Tear -Off) or Recover
C
Mech. Attached Insulation, Bonded Roof Cover
22
"- 5E
CWF
New, Reroof (Tear -Off) or Recover
E
Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover
22
6A
Gypsum
New or Reroof (Tear -Off)
A-1
Bonded Insulation, Bonded Roof Cover
23
' 6B
Gypsum
New, Reroof (Tear -Off) or Recover
A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
24
- 6C
Gypsum
New, Reroof (Tear -Off) or Recover
C
Mech. Attached Insulation, Bonded Roof Cover
24
6D
Gypsum
New, Reroof (Tear -Off) or Recover
E
Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover
24
�- -7A
Various
Recover
A-1
Bonded Insulation, Bonded Roof Cover
25-26
IV 7-B .
Various
Recover
F
Non -Insulated, Bonded Base Sheet, Bonded Roof Cover
26
1. c The roofsystem evaluation herein pertains to above -deck roof components. Roof decks and structural members shall be in accordance with FBC requirements to the satisfaction of the Authority Having Jurisdiction.
Load resistance of the roof deck shall be documented through proper codified and/or FBC Approval documentation. -
2. ' "Insulation / base sheet fasteners shall be of sufficient length for the following deck engagement: y
D; Wood: Minimum 0.75-Inch penetration. -
➢ Steel: Minimum 0.75-inch penetration and engage the top flute of the steel deck.
➢ Structural concrete: Minimum 1-inch embedment into pilot hole in accordance with fastener manufacturer's published installation Instructions.
3. Unless otherwise noted, insulation may be any one layer or combination of polyisocyanurate, polystyrene, wood fiberboard, perlite, gypsum -based roof board or mineral -wool roof board that meets the QA
requirements of F.A.C. Rule 61G20-3 and Is documented as meeting FBC 1505.1 and, for foam plastic, FBC Chapter 26, when Installed with the roof cover.
J
Exterior Research and Design, I.I.C. d/b/a Trinity) ERD Evaluation Report A42970.30.12-R2 for FL36027-R2
Certificate of Authorization #9503 - CH EDITION (2017) FBC NON-HVHZ EVALUATION Revision 2: 09/25/2017
Prepared by: Robert Nieminen, PE-59166 TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Appendix 1, Page 1 of 26x
i
�l I KINITY ER&
15. Unless otherwise noted, refer to the following references for bonded base, ply or cap sheet applications.
TABLE 1: TRI-BUILT RODF COVERS..
Reference
Layer
Material
Application
BP -AA
Base Ply
FBC Approved ASTM D4601, Type II
(Base and Ply sheets, Asphalt -Applied)
HA at 2040lbs/square
Ply
FBC Approved ASTM D2178, Type IV or VI
SBS-AA
(SBS, Asphalt -Applied)
Cap Ply
TriBuilt SBS Granular
HA at 20-40lbs/square
SBS-TA
(SBS, Torch -Applied)
Cap Ply
TriBuilt SBS Granular
Torch -Applied
SBS-SA
Base Ply
TriBuilt SA SBS Base
SBS, Self -Adhering)
Self -Adhering
Cap Ply
TriBuilt SA SBS Cap
-
Base Ply or Ply
,-jljeuilt APP SIDoot
(APP, Torch•A.plied)
Cap Ply
uiItAPPSnmoth, fiBuiB.APP..Granula
Torch -Applied
APP-SA
(APP, Self -Adhering)
Cap Ply
TriBuilt SA APP Cap
Self -Adhering
16. Vapor barrier options for use over structural concrete deck followed by adhered insulation carry the following Maximum Design Pressure (MDP) limitations. The lesser of the MDP listings below vs. those in Table 3A
applies:
VAPOR BARRIER OPTIONS; STRUCTURAL CONCRETE DECK; ADHERED INSULATION PER TABLE 3A
Option #
Primer
Vapor Barrier
Insulation Adhesive
MDP (psf)
Type
Attach
VB-1.
ASTM D41
TriBuilt SA SBS Base
Self -Adhering
Inta-Stik or CR-20, 12-inch o.c.
-60.0
VB-2.
ASTM D41
TriBuilt SA SBS Cap
Self -Adhering
Insta-Stik, 12-inch o.c.
-75.0
VB-3.
ASTM D41
TriBuilt SA SBS Cap
Self -Adhering
Millennium One Step Foamable Adhesive, 12-inch o.c.
-157.5
VB-4.
ASTM D41
TriBuilt SA SBS Cap
Self -Adhering
CR-20,12-Inch o.c.
-270.0
ASTM D41
TriBuiltSA SBS'Base
Sell f-Adherin -- -
Zi4i0enrtium On' `per- e.St pfoamabte Ad'T-�hesiv Millennium -PG T6umn c.a@
A hesry -. y@gnd5000. - -2D 12-mch.o,c.
-290.0
17. Dens Deck shall be field -primed with PG100 prior to self -adhering membrane application. Refer to tables herein for other priming requirements.
18. "MDP" = Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads. Refer to FBC 1609 for determination of design wind loads.
Exterior Research and Design, I.I.C. d/b/a Trinity] ERD Evaluation Report A42970.10.12-R2 for FL36027-R2
Certificate of Authorization #9503 6' EDITION (2017) FBC NON-HVHZ EVALUATION Revision 2: 09/25/2017
Prepared by: Robert Nieminen, PE-59166 TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Appendix 1, Page 3 of 26
�I TRINITY ERD
TABLE 1E-2: WOOD DECKS -NEW CONSTRUCTION, REROOF'(TEAR-OFF) OR RECOVER
SYSTEM TYPE.E: NON -INSULATED, MECHANICALLY ATTACHED BASE SHEET, BONDED'ROOF COVER' '
System
Deck (Note 3)
Base Sheet
Roof Cover (Note 15)
MDP
No.
Base
Fasteners
Attach
Base Ply
Cap Ply
(psf)
Min. 19/32-inch
Polyglass Elastobase, Polyglass Elastobase
Poly, Polyglass G2 Base, CertalnTeed
OMG Flat Bottom Plates (square) with
32-inch o.c. in 4-inch lap and 12-inch
(Optional) One or
-
W-1
plywood at max.
Glasbase, Firestone MB Base, JM Perma-
Roofgrip #14, Dekfast Hex with Dekfast #14
o.c. two, equally spaced, staggered
more BP -AA or
SBS-AA, SBS-
TA APP TA
-52.5
24-Inch spans
Ply 28, Tamko Glass Base or GAFGLAS #75
or TruFast MP-3 with TruFast HD
center rows
APP-TA
Min. 19/32-inch
Polyglass Elastobase or Polyglass
Dekfast Hex with Dekfast #14 or TruFast MP-
12-inch o.c. in 4-inch lap and 12-inch
One or more SBS-
SBS-SA, APP-
W-2
plywood at max.
Elastobase Poly with poly top surface
3 with TruFast HD
o.c. in two, equally spaced, staggered
SA
SA, SBS-TA or
-52.5'
24-Inch spans
P
center rows,,,,,, ,.
.
APP-TA
Min. 19/31-inch
Polyglass Elastobase or Polyglass
OMG Flat Bottom Plates (square) with
12-inch o.c. in 4-inch lap and 12-Inch
'(Optional) One or
SBS-AA, SBS-
W-3
plywood at max.
Elastabase Poly
Roofgrip #12
o.c. In two, equally spaced, staggered
more BP -AA or
TA APP TA
-60.0
24-inch spans
center rows
APP-TA
W-4
Min. 19/32-inch
at max.
Polyglass Elastobase or Polyglass
OMG Flat Bottom Plates (square) with
12-Inch o.c. in 4-Inch lap and 12-inch
One or more SBS-
SBS-SA, APP-
plywood
Elastobase Poly with poly top surface
Roofgrip #12
o.c. in two, equally spaced, staggered
SA
SA, SBS-TA or
-60.0'
24-inch spans
center rows
APP-TA
TABLE IF: WOOD DECKS - NEW CONSTRUCTION on REROOF(TEAR-OFF).
SYSTEM TYPE F:.NON-INSULATED, BONDED ROOF COVER
System
Deck
Primer
Roof Cover (Note 15)
MDP
Joint Treatment
Base Ply
Ply
Cap Ply
No.
(Psf)
W 5-
Min. 15/32-inch plywood
(Optional) ASTM D41
None
SBS-SA
(Optional) SBS-SA or
SBS-SA, APP-SA, SBS-TA
-90.0
at max. 24-inc hgPans
APP-TA
or AP$ -TA
W 6
Min.95/32-inch plywood
(Optional) ASTM D41
Plywood Joints are covered with 4-inch wide strips of TriBuilt SA
TriBuilt SA SBS Base
(Optional) SBS-SA or
SBS-SA, APP-SA, SBS-TA
g7 5
at max. 24-inch spans
SBS Base, rolled into place to create continuous bond.
APP-TA
or APP-TA
Exterior Research and Design, I.I.C. d/b/a Trinity) ERD
Certificate of Authorization #9503
Prepared by: Robert Nieminen, PE-59166
e EDITION (2017) FBC NON-HVHZ EVALUATION
TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485
i
Evaluation Report A42970.10.12-R2 for FL16027-R2
Revision 2: 09/25/2017
Appendix 1, Page 8 of 2k