Loading...
HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATEPlanning & Development Services = Building & Code Regulation Division p 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 BUILDER/CONTI PEST CONTROL SCANNED BY CERTIFICATE OF TERMITE TREATMENT st. Lucie County CONSTRUCTION SOIL TREATMENT '7474q ADDRESS: 2`'rO 6 —tea/ �`v1A Dt' , �mr4' EVICT -A -BUG TERMITE & PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: 3 Percentage of solution: .06 Date of Treatment: 6 Footing la Treatment Re -Treat Driveway 1st Treatment Re -Treat Other 1st Treatment Re -Treat Chemicals used: BASELINE Total gallons used 3yS� Time of Treatment: Zi i ° ° r Z - 3 a Slab 1lt Treatment Re -Treat Pools 1" Treatment Re -Treat Perimeter for Final pection Signature of Exterminator Date Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fall and a re -inspection fee charged. FBC104.2.6 Certificate of Protective Treatmentforprevention of termites A weather resistantjobsite posting board shall be provided to receive duplicate Treabnent Certificates as each required protective treatment is completed, providing a copy for the person the permit is Issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, Identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soll chemical barrier method for termite prevention Is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014 Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 -772-462-21-72 Fax 772-462-6443- CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #: I O —0�119 JOB BUILDER/CONTRACTOR: _ PEST CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST CONTROL INC. - -" _"•emu PEST CONTROL LICENSE #: JB175775 St I I In o'^ounty We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. e Square feet if area treated: �' S /� Percentage of solution:.06^% Date of Treatment: 5 — 16—t Footing 1't Treatment Re -Treat Driveway 1st Treatment Re -Treat Other 1st Treatment Re -Treat Chemicals used: BASELINE Total gallons used: i 3� Time of Treatment: l d d Slab 1st Treatment Re -Treat Pools 1st Treatment l�Perimeter for Final Inspection a^ 5-,,, � d ......... .tzo�ana Signature of Exterminator Date Note. There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged, FBC104.2.6 Certificate of Protective Treabnentforprevention oftermites A weather res/stantjobsite posting board shall be provided to recelve duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files fie Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a venfiable record of protective beatrnent. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final bullding approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014