Loading...
HomeMy WebLinkAboutCONTRACTOR MATERIAL - TEST CERTIFICATEL t-[oG-o5 �c f Contractors Material and Test Certificate for Aboveground Piping PROCEDURE Upon completion of work. Inspection and test shall be made by the contractor's representative and witnessed by an owners representative S All defects shall be corrected and system left in service before contractor's personal finally leave the Job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and St. L contractor. It is understood the owners representative's signature In no way prejudices any Clain against contractor for faulty material, poor workmanship, or (allure to comply with approving authority's requirements or local ordinances. Property name DELIVERY STATION-DVBt Property address 7440 COMMERCIAL CIRCLE Accepted by approving authorities ST LUCIE COUNTY Address Plans Installation conforms to accepted plans Yes No Equipment used is approved Yes No If no, explain deviations Instructions Has person in charge of fire equpiment been Instructed as �X Yes No to location of control valves and care and maintenance of this new equipment? If no, explain? Have copies of the following been left on the premises? Yes No 1 System components instruction Yes No 2 Care and maintenance instructions Yes No 0 4PA25 Yes No Location of system Supplies building lExisnNG BUILDING Year of Orfice Temperature Make Model manufacture size Quanity rating GLOBE 5661 2019 112 58 200 Sprinklers GLOBE G 5601 2 119 112 60 15 Ppe an fittinge Type of pipe Type of fittings SC 40 - THREADED Alarm Alarm device Maximum time to operate through test connection valve orType I Make I Model Minutes Se enda FI flow EXISTIN Indicator Dry valve Q.O.D. Make Model Serial no. Make Model Serial no. Dry pipe operating lest Time to trip through test connection Water pressure Air pressure Trip plant air pressure Tmewater reached k test outlet Alarm operated property Minutes Seconds PSI psi psi Minutes Seconds Yes No Wlmout Q.O.D. Wth 037— . If no, exp a n Operation =Pneumatic Electric Hydraulics Piping Supervised I IYes I INO I Detecting media supervisedsuperviseall IYes I JNo Deluge and Does valve operate from the manual trip, remote, or both =Yes =No control stations? proaction Is valves there an assesslble facility in each circuit for testing Yes =No It ne, explain Make Model Does each circuit operate supervision loss alarm? Does eac circuit operate valve release? Maximum time to operate release Yes 1 o Yes No Minutes Secontls ANNED BY cie County Pressure reducing valve test Test description Test Blanktesgng Location I Make and I setting Flow rate Residual pressure Static pressure mnwinal eve sate: pressure in excess Shall 1e0 psi (1 t n bar) for 2 hours. Dittemneai d pipe valve clappers shall be left drostaec: Hydrostatic test sM1all be made at not less than 200 psi (13.6 bar) for 2 hours or SO psi (3.4 bar an during the test to prevent damage. All aboveground piping It shall ho stopped. teumaec: Establish 40 psi bar) air pressure and measure drop, which shall not exceed 1 psi (,Which shall 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressurree drop, rt exceed 1112 psi (0.1 bar) In 24 hours. psi ( bar) for Z 'hours If no, state reason II piping hydrostatically tested at ry piping pneumaticallyI�Yes tested Iquipment operates properly I�yes Iva am c is, so rf Sodiumucertiysilicate.brine, or other corrosive clhemicals were not used for tesaddives and cc"t! systalms or stopping leaks? l,ate or es =Yes =No Residual located near water dual pressurwide valve in test Drain Reading of gaugepsi ( bar) connection open wide PSI d swtest connection lead in connections to system risers pushed before connection made Other Explain erground mains and sprinkler piping I�Yes EXISTING =No rifled by copy of the U Form No. 86B fished by Installer of underground =Yes I]No uinkler piping has ..I�Yes No if no, explain power driven fasteners are usedi n concrete, �prssentagve sampletesgng he satisfactorily WA ompleted? WA Number removed lumber used Locations gaskets IIDNo Yes Welding Plpl^9 I=Yes =No D, as thesprinklercontractor atwelding procedures comply - least AWS Bt? yi the reqfy s uirements Yes =No Welding _ Do you certiy that the welding was preformed by welders qualified In with the requirements of at least AWS B2.17 =Yes =No compliance that awas l discs are retrieved, that oout in compliance with a penings led that the of qp lity eont procedure to ensure smooth, that slag and other welding residue are removed, and that - In piping are the Internal diameters of piping are not penetrated? =Yes =No cutouts Do you certify that you have a control feature to ensure that (discs) all cutouts (discs) are retrieved? if no, explain Hydraulic Nameplate provided . EXISTING No data I=Yes I�X nameplate Date left In service with all control valves open b ZGJ Remarks of sprinkler contractor COAST TO COAST FIRE PROTECTION, INC. Name Tests witnessed by Title Date For property owner (signed) Date Title 0 6