HomeMy WebLinkAboutTHE PORCH FACTORY CONTRACTly"
1..e Porch Factij,y, LLC
Enclose It So You Can Use It LICENSED/INSURED
705 North 39th Street • Fort Pierce, FL 34947
Office 772-465-6772 • Fax: 772-465-3252 • www.ThePorchFactory.com • CBC 1258459
Customer cJ#, e
Email
Address
Job Name
66o/ C ,34t n A Aoy-
Date rob. 12. 3_ / 9
Phone 801 5 �6 _7S
City Ff t. State Zip 3 's/
Address L, e &N). $. City
Job Phone
State Zip
JOB DESCRIPTION: POOL ENCL. SCREEN PORCH POLY ROOF
ROOF: r
Mansard
A -Frame 42D
WALLS:
COLOR:
Bronz
hit
SCREEN MESH:'
20/20
Other
KICKPLATE:
vLa�rtv0
Height /6"'
5-ktl
GUTTER:
Super
5"
7"
DOWNSPOUT:
—L/ 3x4
— 4x5
CHAIR RAIL:
(0 24"
36"
Other
DOORS:
KIP.
f 6 "
to Code
& Engineering Included
ne5craen 3 P,r.k ?e ,js Xl-L
SCANNED
BY
St. Lucie County
Aft ;f-t M'eO,
Approximate Completion Date: I Z- W 4-OCS
TOTAL CONTRACT PRICE 9e
Deposit % CQCi�3� 8 8 izA
Payment due on final day of installation.
$ '%5oz
$ a5(Do
—
$ o-'SOe
$ 9-Soe,
Total Contract Price is for Cash/Checks.
Credit Card Fee is 3.95%.
' C°" ` TERMS AND CONDITIONS
1. The Sellerexpressly reserves all contractors, mechanics and material man's lien rights which may be asserted under any provision of law to secure payment ofthe contract price
and may assert and fix the same lien upon the real property upon which installation is made.
2. In the eventpayment of this contract is enforced through aftomeyorbysuit Orin bankmptcyorprobate proceedings, the sellermay, recoverand the purchaserhereby agrees to pay
reasonable attomeyfees and costs of court.
3. As an inducement for The Porch Factory to enter into this contract, the signer certifies that the above legal owner and address are correct. It is also understood that there are no
verbal agreements and all items discussed are covered by this written wntract-this is a proposal until signed by an officer of the corporation at which time it becomes an executed
contract. Any additions to this contract shall be covered by a change order. Additional costs of change orders shall be due and payable upon acceptance by the customer.
Acceptance by the owner must be within 14 days of thei3roposal date oral the option fth ller They buyer (customer) may cancel this contractwithin three (3) working days after
signing. Any change orders must be In writing and received priorto final measurement.
4. Afull two year guarantee against defect in purchased assemblies, materials and workmanship goes into effect at completion of this contracted work covered by this contract and
any change orders in effect. Anywarrantywork necessary,however, shall not be done until such time as final payment has been made to the seller,
5. In the event that any work performed by the contractor is wholly or partially destroyed or damaged due to fire, water, vandalism, or any other cause not under the control of the
contractor, the loss shall be sustained by the owner, and shall not be the responsibility of the contractor. The undersigned acknowledges receipt of a true copy of this contract and
acknowledges that he/she has read and understand the contents thereof and accepts the same on the terms and conditions as stated herein. This contract shall be binding upon
parties hereto, their heirs, successors and assigns. Note: The quoted price is based on dimensions shown in sketch. Anyvarianwwillbepmportionatelycelculated. Ifmaterialcost
increase greaterthan 10%the cost of material will be added to this contract.
ACCORDING TO FLORIDA'S-CONSTRUCTION LIEN LAW (SECTIONS 713.001.713.37, FLORIDA STATUTES), THOSE WHO
WORK ON YOUR PROPERTY OR PROVIDE MATERIALS AND SERVICES AND ARE NOT PAID IN FULL HAVE A RIGHT TO
ENFORCE THEIR CLAIM FOR PAYMENT AGAINST YOUR PROPERTY. THIS CLAIM IS KNOWN AS A CONSTRUCTION LIEN. IF
YOUR CONTRACTOR OR A SUBCONTRACTOR FAILS TO PAY SUBCONTRACTORS, SUB -SUBCONTRACTORS, OR
MATERIAL SUPPLIERS, THOSE PEOPLE WHOARE OWED MONEY MAY LOOK TO YOUR PROPERTY FOR PAYMENT, EVEN IF
YOU HAVE ALREADY PAID YOUR CONTRACTOR IN FULL. IF YOU FAIL TO PAY YOUR CONTRACTOR, YOUR CONTRACTOR
MAYALSO HAVE A LIEN ON YOUR PROPERTY. THIS MEANS IFA LIEN IS FILED YOUR PROPERTY COULD BE SOLD AGAINST
YOUR WILL TO PAY FOR LABOR, MATERIALS, OR OTHER SERVICES THAT YOUR CONTRACTOR OR A SUBCONTRACTOR
MAY HAVE FAILED TO PAY. TO PROTECT YOURSELF, YOU SHOULD STIPULATE IN THIS CONTRACT THAT BEFORE ANY
PAYMENT IS MADE, YOUR CONTRACTOR IS REQUIRED TO PROVIDE YOU WITH A WRITTEN RELEASE OF LIEN FROM ANY
PERSON OR COMPANY THAT HAS PROVIDED TO YOU A "NOTICE TO OWNER." FLORIDMS CONSTRUCTION_ LIEN LAW IS
COMPLEX, AND IT IS RECOMMENDED THATYOU CONSULTANATTORNEY.
CUSTOMER S IATURE DATE COMPANY REPRESENTATIVE I D/