Loading...
HomeMy WebLinkAboutALL AMERICAN ROOFING PAPERWORKAll American kqlyjofing & Coating ojL Florida, into 340 SE Seville St., Stuart. Fl. 34994 CCCI329384 March 1, 2019 Ken Alles 10851 S Ocean Dr, Lot# 54 Jensen Beach, FL 34957 734-330-6402 salles@IFFH.com RECEIVED MAR 14 2019 ST. Lucia eadunty, Permitting SCANNED BY St. Lucie County 26GA 5-V CRIMP METAL REROOF PROPOSAL -All American Roofing will remove and dispose of existing Shingle roof down to plywood sheathing. -AAR will inspect existing plywood sheathing and re -nail according to code. -AAR will replace up to five (5) sheets 5/8" CDX plywood if needed, N/C. -AAR will install a Titanium PSU-30 modified self -adhered underlayment. -AAR will install 26ga. galvanized, standard color baked on paint finish, accessory metals, fastened to code. -AAR will install 26ga. 5-V Crimp Mill Finish Metal Roof, fastened to code using 20yr Wood Zac Screws. -AAR will install new vents and plumbing flashings at existing locations. -AAR to procure the permit and remove all roofing debris upon completion. -A 10-year Workmanship Warranty and any Manufacturer's Warranties will be forwarded upon receipt of final payment. We will furnish labor and materials for the sum of. $4,714.00 OPTIONS FOR METAL -AAR will install 26ga. Standing Seam Metal Roof (hidden fasteners): $5,487.00 INITIAL: -AAR will install 26ga. Kynar 500 (Color of Choice) 5-V Crimp Metal Roof: $5,558.00 INITIAL: -AAR will install 26ga. Kynar 500 (Color of Choice) Standing Seam Metal Roof: S5,745.00 INITIAL: OPTION: LANCO COATING FOR ELITE PANEL ROOF -AAR will clean entire elite panel flat roof with light pressure wash to prepare for adhesives. -AAR will seal Elite roof with urethane sealant and Lanco Silicone Coating. Cj _ (� -A 1-year Workmanship Warranty will be provided upon final payment. $1,800.00 INITIAL: f Notes: 1) Any Work done beyond the scope of this contract will be invoiced additionally and separately. V it , (Please See Wood & Labor Addendum & Job Overview) INITIAL: (--!� 2) If additional roofs are discovered under the existing roof during the tear off process, additional charges including landfill fees, will incur for each additional roof to be torn off. INITIAL: 3) No verbal promises made by any representative of this company are binding unless contained in the Agreement. 4) Please note that all credit payment methods include additional fees and/or charges of 3.5%. Please discuss payment methods at time of signing. INITIAL: TERMS: This Proposal becomes a Contract upon signior. Service will begin when the signed Contract, Notice of Commencement and a 30% deposit are received. Upon Progress, 40% of the contract price is due. The remaining 30% balance is due upon completion. 4" 1. 3 �) Iq- Presented by: Shawn Bergen f c epted by: Authorized Signature Date: Office: (772) 781-4410 Email: AII American Roofing & Coating of Florida, Inc. —A Florida Corp. Pres./Sec../Treas. Fax: (772)781-4408