Loading...
HomeMy WebLinkAboutSUBMITTED DOCUMENTS00/03/2004 03:25 4076475234 PAGE 01 -.-.�1465 Gene Street -.,.-�, Winter park, Florida 32789 f ` CONafRUCrION, 407-647-1234 Fax: 407-647-5234 FAX Attn: Christine Moore Company: St. Lucie County Fax #: 772-462-1735 RE: Coleman Floor Company Comments: Permit revision to permit 424041046. Date: 8/3/04 *of Pages: 1 From: Keith Severns Billy Crouch was in your office today speaking to you about our revisions on this project. He says that you are requesting that we give you the amount that it is going to cost to make those changes. The total additional cost will be: 1$12,000,00 Please fax us back the additional permit cost so that we may get a. check sent overnight this afternoon. s DATE FILED: 9/ 3 PERMIT #: REVISION FEE: ,? a( . of RECEIPT #: ST. LUCIE COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING & ZONING , 2300 VIRGINIA AVENUE FORT PIERCE, FLORIDA 34982-5652 G,rrjL' 772-462-1553„Sks'�9r APPLICATION FOR BUILDING PERMIT REVISIONS PROJECT INFORMATION 1. LOCA' L 2. DETAILED DESCRIPTIONS OF PROJECT REVISIONS: % ,"zwt /[A'/N/ZdGM , A.Zr/--) 3. CONTRACTOR INFORMATION: ST. OF FL REG/CERT #: C G C Q 44 BUSINESS NAME: iV C QUALIFIERS NAME: k!, Sy ADDRESS: / G5 C.G CITY: 1g. n 1. a. PHONE (DAYTIME): Yc-'7 -/ 4. ARCHIT/ENGINEER: NAME: ADDRESS: CITY: PHONE (DAYTIME): 12119/02 LUCIE COUNTY CERT #: S T. L U C I E C 0 U N T Y 2300 Virginia Avenue Ft. Pierce, Florida 34982 Growth Management Division PAYMENT R E C E I P T TRANSACTION NUMBER: 01192997 i TRANSACTION DATE: 03 AUG 2004 PERMIT NUMBER: 24041046 PERMIT TYPE: BUILDING COMMERCIAL PERMIT JOB DESC: * NEW COMMERCIAL BUILDING /OFFICE & WAREHOUSE (COLEMAN FLOORING) JOB ADDR: 7385 COMMERICAL CIR (6534) PARCEL NUMBER: 1335-802-0045-000/1 FCC DESC: *OTHER NONRESIDENTIAL BUILDINGS APPLICANT: KEITH SEVERNS F E E S C O L L E C T E D FEE CODE DESCRIPTION AMOUNT ------------------------------------------------------- REVIS REVISION TO PLANS 150.00 AMOUNT PAID: $150.00 FEE WAIVED: CHECK NBR: 7994 PAID BY: KNS CONSTRUCTION INC MEMO: CM 8 (328 ) I ST LUCIE COUNTY FIRE DISTRICT BUREAU OF FIRE PREVENTION PLAN REVIEW 2409 Rhode Island Avenue Telephone: 772-462-8306 , FL 34950 FAX: 772-462-8466 Vonstruction Tenant Improvement () p ( )Addition ( )Renovation/alterations ( )Shell Only Jurisdiction: SLC F.P.B.: B-04-251 Occupancy: Coleman Flooring Building Dept: 24041046 Address: 7385 Commercial Cir Number of stories: 1 Contractor KNS Construction Phone# 407-647-1234 Contractor's Address: _1465 Gene St City: Winter Park State: FL Zip Code: 32789 ArchitectlEngineer: The Architecture Co. Phone # 407-332-8299 Building Owner: Review Date: 6/4/2004 Occupancy Type: Storage Automatic sprinklers: Yes Gross sq ft: 15,120 Net sq ft: Occupant Load: Based On: Construction Type: SBCCI Type: IV unp NOTE 1. All revisions must be in compliance before the final inspection. 2. The Fire Marshal requires 24 hour notice on all inspections. 3. The respective Building Department shall schedule all final inspections through the Fire Marshal's Office. 4. Permit fees are required to be paid in full prior to any inspections. 5. Failed inspections require payment of fee prior to rescheduling of further inspections. 6. A copy of the required revision/s have been transmitted to the Architect () Contractor ( ). 7. Penetrations through rated assemblies shall be of proper UL design. . 8. UL design criteria shall be submitted with the construction plans. 9. Fire Alarm Panels shall be located indoors. THE FLORIDA FIRE PREVENTION CODE, 2001 EDITION IS CURRENTLY ENFORCED. REVISIONS REQUIRED ESS BOX IS REQUIRED ( ) ACCESS KEY SWITCH REQUIRED ( ) A separate permit is required for the installation of the fire sprinkler system. 2. A separate permit is required for the installation of the fire alarm system. Reviewed by: v¢ir. Date: 6/4/2004 .4 e t- Florida Department of Community Affairs EnergyGauge F1aCom v1.22 FORM 40OA-2001 Whole Building Performance Method for Commercial E Jurisdiction: FORT PIERCE, ST LU_CIE COUNTY, FL (661100) Short Dese: COLEMAN Project: COLEMAN FLOOR COMPANY Owner: Address: COMMERCIAL CIRCLE City: FT. PIERCE State: FLORIDA Zip: 0 Type: Office (Business) Class: New Finished building- PermitNo: 0 Storeys: 1 ---GrossArea: 14903 Net Area: 3227 Max Tonnage: 5 (if different, write in) Compliance Summary Component Design Criteria Result Gross Energy Use 54.11 100.00 PASSES Other Envelope Requirements - A PASSES LIGHTING CONTROLS EXTERNAL LIGHTING HVAC SYSTEM PLANT WATER HEATING SYSTEMS PIPING SYSTEMS Met all required compliance from Check List? PASSES PASSES PASSES PASSES PASSES PASSES Yes/No/NA IMPORTANT NOTE.- An input report Print -Out from EnergyGauge RaCom of this design building mast be submitted along with this Compliance Report. Id 3/13/2004 / EnergyGauge FlaCom FLCCSB v1.22 4 Q Y COMPLIANCE CERTIFICATION: I hereby certify that the plans and Review of the plans and specifications covered by this specifications covered by this calculation are calculation indicates compliance with the Florida Energy in compliance with the Florida Energy Code. Before construction is completed, this building will be Efficiency Code. inspected for compliance in accordance with Section 553.908. F.S. PREPARED BY: DAVIDGAST - 13UILDWGOFFICIAL: DATE: 2004-0-18 DATE: I hereby certify that this tiui! i is in complian with the Florida Energy Eff 'e Icy Cc 1 OWNER AGENT• DATE: If required by Florida law, [hereby certify (7 that the system design is in REGISTRATION compliance with the Florida Energy Code. No. ARCHITECT: ELECTRICAL SYSTEM DESIGNER LIGHTING SYSTEM DESIGNER: MECHANICAL SYSTEM DESIGNER: DAVID GAST FL P.E. 38638 ,PLUMBING SYSTEM DESIGNER: (*).Signature is required where Florida Law requires design to be performed by registered design professionals. Typed names and registration numbers may be used where all relevant information is contained on signed/sealed plans. l 3/18/2004 EnergyGauge FlaCom FLCCSB v1.22 2 ,. Project: COLEMAN Title: COLEMAN FLOOR COMPANY Type: Office (Business) Location: FORT PIERCE, ST LUCIE COUNTY, FL (661100) (WEA File: DAYTONABEACII. Whole Building Compliance Design Total 54.11 Reference 100.00 ELECTRICITY 54.11 100.00 AREA LIGHTS 23.22 67.34 MISC EQdUIPMT 14.68 14.68 PUMPS & MISC 0.02 0.02 SPACE COOL 8.04 9.80 VENTFANS 8.16 8.16 Credits & Penalties (if any): Modified Points: = 54.11 PASSES Project: COLEMAN Title: COLEMAN FLOOR COMPANY Type: Office (Business) Location: FORT PIERCE, ST LUCIE COUNTY, FL (661100) (WEA File: DAYTONABEACH. Other Envelope Requirements Item Zone Description Design Limit Meet Req. PrOZol Wa4 PrOZol Wall Adjecent to Unconditioned Space - Max Uo 0.13 0.33 Yes PrOZolRfI PrOZol Exterior Roof - Max Uo Limit 0.05 0.09 Yes PrOZ02Rfl Pro o2 Exterior Roof - Max Uo Limit 0.05 0.09 Yes Meets Other Envelope Requirements 3/18/2004 EnergyGauge FlaCom FLCCSB v1.22 External Lighting Compliance Description Category Allowance Area or Length ELPA CLP (W/Unit) or No. of Units (W) (w) (Sgft or it) None Project: COLEMAN Title: COLEMAN FLOOR COMPANY Type: Office (Business) Location: FORT PIERCE, ST LUCIE COUNTY, FL (661100) (WEA File: DAYTONABEACIL Lighting Controls Compliance Acronym Ashrae Description Area No. of Design Min Compli- ID (sq.ft) Tasks CP CP ance PrOZo1Sp1 34 Offices (Partitions<3.5ftbelow 3,227 1 5 4 PASSES ceiling) Open plan offices 900 ft or larger with partitions higher PrOZo2Spl 39 Shop (Non -Industrial) - Machinery 11.676 1 6 6 PASSES PASSES 3/18/2004 EnergyGauge FlaCom FLCCSB v1.22 Project: COLEMAN Title: COLEMAN FLOOR COMPANY Type: Office (Business) Location: FORT PIERCE, ST LUCIE COUNTY, FL (661100) (WEA File: DAYTONABEACH. System Report Compliance SS-1 System 1 Constant Volume Air Cooled No. of Units Split System < 65000 Btu/hr I Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Cooled <65000 Btu/h 10.00 10.00 10.00 PASSES Cooling Capacity Air Handling System Air Handler (Supply) - 0.80 0.80 PASSES -Supply Constant Volume SS-2 System 2 Constant Volume Air Cooled No. of Units Split System < 65000 Btu/hr I Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Cooled < 65000 Btulh 10.00 10.00 10.00 PASSES Cooling Capacity Air Handling System Air Handler (Supply) - 0.80 0.80 PASSES -Supply Constant Volume PASSES Plant Compliance Description Installed Size Design No Eff Min Design Min Category Eff IPLV IPL Comp liance None 3/18/2004 EnergyGauge FlaCom FLCCSB v1.22 Project: COLEMAN Title: COLEMAN FLOOR COMPANY Type: Office (Business) Location: FORT PIERCE, ST LUCIE COUNTY, FL (661100) (WEA File: DAYTONABEACIL Water Heater Compliance DDesign Description Type Category Elf Min Design Max Comp Eff Loss Loss liance Water Heater 1 Storage Water Heater - <=120 [gal] & <= 1.00 0.88 PASSES Electric 12 [kW] PASSES Project: COLEMAN Title: COLEMAN FLOOR COMPANY Type: Office (Business) Location: FORT PIERCE, ST L Piping System Compliance Category Pipe Dia Is Operating Ins Cond Ins Req Ins Compliance [inches] Runout? Temp [Btu-in/hr Thick [in] Thick [in] [F] SF.FJ Heating System (Steam, Steam 0.50 False 105.00 0.24 1.00 1.00 PASSES Condensate, & Hot Water) PASSES 3/18/2004 EnergyGauge FlaCom FLCCSB v1.22 Project: COLEMAN Title: COLEMAN FLOOR COMPANY Type: Office (Business) Location: FORT PIERCE, ST L Other Required Compliance Category Section Requirement (write N/A in box if not applicable) Check Infiltration 406.1 Infiltration Criteria have been met System 407.1 HVAC Load sizing has been performed Ventilation 409.1 Ventilation criteria have been met ADS 410.1 Duct sizing and Design have been performed T & B 410.1 Testing and Balancing will be performed Electrical 413.1 Metering criteria have been met Motors 414.1 Motor efficiency criteria have been met Lighting 415.1 Lighting criteria have been met O & M 102.1 Operation/maintenance manual will be provided to owner Roof/Ceil 404.1 R-19 for Roof Deck with supply plenums beneath it Report 101 Input Report Print -Out from EnergyGauge F1aCom attached? 3/18/2004 EnergyGauge FlaCom FLCCSB v1.22 7 1 ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Community Affairs EnergyGauge F1aCom v1.22 INPUT DATA REPORT Proiect Information Project Name: COLEMAN Orientation: North Project Title: COLEMAN FLOOR COMPANY Building Type: Office (Business) Address: Building Classificatio New Finished building i COMMERCIAL CIRCLE State: FLORIDA No.of Storeys: 1 Zip: 0 GrossArea: 14903 Owner: Zones No Acronym Description Type Load Profi Area Multiplier Total Area ls9 [st] I PrOZ01 Zone l CONDITIONED Uses Building Load 3227.0 1 3227.0 ❑ Profile 2 PrOZo2 Zone 2 UNCONDITIONED Uses Building Load 11676.0 1 11676.0 ❑ Profile 3/18/2004 EnergyGauge FlaCom FLCCSB v1.22 I 1 Spaces No Acronym Description Type Depth Width Height Multi Total Area Total Volume [ft] [ftl [ft] plier [sq [cf] In Zone: PrOZol 1 PrOZo1SD1 Zo0Sp1 Offices (Partitions<3.5 ft 100.00 32.27 10.00 1 3227.0 32270.0 ❑ below ceiling) Open plan offices 900 ft or larger with partitions higher In Zone: PrOZo2 I PrOZo2SD1 ZoOSpl Shop (Non -Industrial) - 100.00 116.76 20.00 1 11676.0 233520.0 ❑ Machinery Lighting NO Type Power Control Type No.of [W] Ctrl pts In Zone: PrOZol In Space: Pr0Zo1Sp1 1 Recessed Fluorescent - No vent 4921.00 Manual On/Off 5 ❑ In Zone: PrOZo2 In Space: Pr0Zo2Sp1 1 Metal Halide 8150.00 Manual On/Off 6 ❑ Walls No Description Type Width H (Effec) Multi Area DirectionConductance Heat Dens. R-Value [ft] [ft] plier [sf] [Btu/hr. sf. F] Capacity [Ih/cf] [h.sCFBtul [Btu/sf.F] In Zone: PrOZol I PrOZolWal 8 in. split -face 50.00 10.00 1 500.0 East 0.1301 5.5406 33.981 7.68 ❑ CMU, 1-1/2"metal furring strips 3/18/2004 EnergyGauge FlaCom FLCCSB v1.22 2 PrOZolWa3 8 in. split -face 66.00 10.00 1 660.0 South 0.1301 5.5406 33.98 7.68 ❑ CMU, 1-1/2"metal furring strips 3 PrOZOI Wa4 8 in. split -face 70.00 12.00 1 840.0 North 0.1301 5.5406 33.98 7.68 ❑ CMU, 1-1/2"metal furring strips Windows No Description Type Shaded UCen SC Vis.Tr W H (Effec) Mult Total Area [Btu/hr sf F [it] [ft] iplier [Sf] In Zone: PrOZol In Wall: PrOZo1Wa1 1 PrOZolWalWil SINGLECLEAR No 1.0018 0.95 0.88 26.00 5.00 1 130.0 ❑ In Wall: PrOZo1Wa3 1 PrOZolWa3Wil SINGLE CLEAR No 1.0018 0.95 0.88 4.00 5.00 3 60.0 Doors No Description Type Shaded? Width H (Effec) Multi Area Cond. Dens. Heat Cap. R-Value [it] [ft] plier [sf] [Btu/hr. sf. F] [Ib/cf] [Btu/sf. F] [h.sf.F/Btu] In Zone: PrOZol In Wall: PrOZo1Wal 1 PrOZolWalDrl Aluminum door, No 3.00 7.00 2 21.0 0.1919 43.67 0.53 5.21 ❑ 1.25 in. polystyrene In Wall: PrOZo1Wa3 1 PrOZolWa3Drl Aluminum door, No 3.00 7.00 1 21.0 0.1919 43.67 0.53 5.21 ❑ 1.25 in. polystyrene In Wall: PrOZo1Wa4 I PrOZolWa4Dr1 Aluminum door, No 3.00 7.00 4 21.0 0.1919 43.67 0.53 5.21 ❑ 1.25 in. polystyrene 3/18/2004 EnergyGauge FlaCom FLCCSB v1.22 1 3 Roofs No Description Type Width H (Effec) Multi Area Tilt Cond. Heat Cap Dens. R-Value [1t] [ft] plier [sf] [deg] [Btu/hr. Sf. F] [Btu/sf. F] [Ib/cf] [h.sf.FBtu] In Zone: PrOZol 1 PrMulRfl MtlBldg Roof/R-19 32.27 100.00 1 3227.0 0.00 0.0492 1.34 9.49 20.34 ❑ Batt In Zone: PrOZo2 I PrOZo2Rfl Mtl Bldg Roof/R-19 116.76 100.00 1 11676.0 0.00 0.0492 1.34 9.49 20.34 ❑ Batt Skylights No Description Type UCen Shading Vis.Tran W H (Effec) Multiplier Area Total Area [Btu/hr sf F Coeff [ft] [ft] [S11 [Sf] In Zone: In Roof: Floors No Description Type Width H (Effec) Multi Area Cond. Heat Cap. Dens. R-Value [ft] [ft] pher [sf] [Btu/hr. sf. F] [Btu/sf. F] [lb/cf] [h.sLFBtu] In Zone: PrOZOI 1 PrOZolFII 1 ft. soil, concrete 32.27 100.00 1 3227.0 0.1745 54.00 108.00 5.73 ❑ floor, carpet and rubberpad In Zone: PrOZo2 I PrOZo2Fl1 1 ft. soil, concrete 116.76 100.00 1 11676.0 0.1745 54.00 108.00 5.73 ❑ floor, carpet and rubber pad 3/18/2004 EnergyGauge FlaCom FLCCSB v1.22 Systems SS-1 System 1 Constant Volume Air Cooled Split System < 65000 Btu/hr No. Of Units 1 Component Category Capacity Efficiency B'LV 1 Cooling System (Air Cooled < 65000 Btu/h Cooling Capacity) 2 Air Handling System -Supply (Air Handler (Supply) - Constant Volume) 60000.00 10.00 1700.00 0.80 10.00 ❑ ❑ SS-2 System 2 Constant Volume Air Cooled Split System < 65000 Btu/hr No. Of Units 1 Component Category Capacity Efficiency 1PLV 1 Cooling System (Air Cooled < 65000 Btu/h Cooling Capacity) 2 Air Handling System -Supply (Air Handler (Supply) - Constant Volume) 60000.00 10.00 1700.00 0.80 10.00 ❑ ❑ Plant Equipment Category Size Inst.No Et% IPL LI Water Heaters W-Heater Description Capacit Cap.Unit IT Rt. Efficienc Loss 1 Storage Water Heater - Electric 40 Gal 5 [M] 1.0000 [EF] [%/hr] ❑ Ext-Lighting II Description Categories. Area/Len/No. of units Wattage [sVft/No] [W] 11 311812004 EnergyGauge FlaCom FLCCSB v1.22 i 5 Piping No Type Operating Temperature [F] Insulation Conductivity [ Btu-in/h.sf.F] Nomonal pipe Diameter [in] Insulation Is Runout? Thickness [in] 1 Heating System (Steam, Steam Condensate, & Hot Wat 105.00 0.24 0.50 1.00 No ❑ Fenestration Used Glass Frame Frame Name Glass Type No. of SC VLT Panes Conductance Conductance Absorptance [Btu/h.sLF] [Btu/h.sf.F] ApLbWndl SINGLE CLEAR 1 1.0018 0.9500 0.8810 0.4340 0.7000 ❑ Materials Used OnlyR-Value RValue Thickness Conductivity Density SpecificHeat Mat No Acronym Description Used [h.sf.FBtu] [ft] [Btu/h.ft.F] [lb/cf] [Btu/lb.F] 18 Mat118 2 in. Wood No 2.3857 0.1670 0.0700 37.00 0.3900 ❑ 264 Mat1264 ALUMINUM, 1/16IN No 0.0002 0.0050 26.0000 480.00 0.1000 ❑ 214 Mat1214 POLYSTYRENE, EXP., No 5.2100 0.1042 0.0200 1.80 0.2900 ❑ 187 Mat1187 1-1/4IN, GYP OR PLAS No 0.4533 0.0417 0.0920 50.00 0.2000 ❑ BOARD,1/21N 0.3300 ❑ 206 Mat1206 CELLULOSE,FI LL,5.5IN,R- No 20.8318 0.4583 0.0220 3.00 151 Mat1151 20 CONC HW, DRD, 140LB, No 0.4403 0.3333 0.7570 140.00 0.2000 ❑ 4IN ❑ 178 Mat1178 CARPET W/RUBBER PAD Yes 1.2300 3/18/2004 EnergyGauge FlaCom FLCCSB v1.22 6 265 Mat1265 Soil, 1 ft No 2.0000 1.0000 0.5000 100.00 012000 ❑ 48 Mat148 6 in. Heavyweight concrete No 0.5000 0.5000 1.0000 140.00 0i2000 ❑ 123 Matll23 CONC BLOCK No 1.7227 0.6667 0.3870 53.00 0!2000 ❑ MW,81N,HOLLOW 1 159 Matl159 CONC No 0.3202 0.3333 1.0410 140.00 0:2000 ❑ HW-UNDRD-140LB-4IN 57 Mat157 3/4 in. Plaster or gypsum No 0.1488 0.0625 0.4200 100.00 0.2000 ❑ 72 Mat172 AIR LAYER, 3/41N OR Yes 0.9000 ❑ LESS, VERT. WALLS 267 Mat1267 0.75"stucco No 0.1563 0.0625 0.4000 16.00 02000 ❑ 266 Mat1266 2x4@16" oc+R1I Batt No 8.3343 0.2917 0.0350 9.70 0.2000 ❑ 215 Mat1215 POLYSTYRENE, EXP., No 8.3350 0.1667 0.0200 1.80 0.2900 ❑ 2IN, 105 Mat1105 CONC BLK HW, 8IN, No 1.1002 0.6667 0.6060 69.00 02000 ❑ HOLLOW 256 Mat1256 WOOD, SOFT,1-1/2IN No 1.8939 0.1250 0.0660 32.00 0.3300 ❑ 42 Mat142 8 in. Lightweight concrete No 2.0212 0.6670 0.3300 38.00 0.2000 ❑ block 269 Mat1269 .75" ISO BTWN24" oc No 2.2321 0.0625 0.0280 4.19 0.3000 ❑ 86 Mat186 BRICK, COMMON, 41N No 0.8012 0.3333 0.4160 120.00 0.2000 ❑ 211 Mat12ll POLYSTYRENE,EXP.,1/21 No 2.0850 0.0417 0.0200 1.80 0.2900 ❑ N, 12 Mat112 3 in Insulation No 10.0000 0.2500 0.0250 2.00 0.2000 ❑ 218 Mat1218 POLYURETHANE,EXP.,1/2 No 3.2077 0.0417 0.0130 1.50 0.3800 ❑ IN, 23 Mat123 6 in. Insulation No 20.0000 0.5000 0.0250 5.70 0.2000 ❑ 4 Mat14 Steel siding No 0.0002 0.0050 26.0000 480.00 0.1000 ❑ 271 Mat1271 2x4@24" oc+RI1 Batt No 10.4179 0.2917 0.0280 7.11 0.2000 ❑ 272 Ivlatl272 Panel with 7/16" panels Yes 0.9044 ❑ 273 Mat1273 Hollow core flush (1.375") Yes 1.2777 ❑ 274 Mat1274 Solid core flush (1.375") Yes 1.7141 ❑ 275 Mat1275 Panel with 7/16" panels Yes 1.0019 ❑ (1.375") 276 Mat1276 Hollow core flush (1.75") Yes 1.3239 ❑ 277 Mat1277 Panel with 1-1/8" panels Yes 1.7141 ❑ (1.75") 278 Mat1278 Solid core flush (1.75") Yes 1.6500 ❑ 279 Mat1279 Solid core flush (2.25") Yes 2.8537 ❑ 311812004 EnergyGauge FlaCom FLCCSB vl.22 7 E 280 Mat1280 Fiberglass/Mineral wool core Yes 0.8167 ❑ f 281 Mat1281 Paper Honeycomb core Yes 0.9357 ❑ 282 Mat1282 Solid Urethane foam core Yes 1.6500 ❑ 283 Mat1283 Solid mineral fiberboard core Yes 1.7816 ❑ 284 Mat1284 Polystyrene core (18 ga steel) Yes 2.0071 ❑ 1 285 Mat1285 Polyurethane core (IS ga Yes 2.5983 ❑ steel) 2 286 Mat1286 Polyurethane core (24 ga Yes 2.5983 ❑ steel) 1 287 Mat1287 Polyurethane core (24 ga Yes 4.1500 ❑ steel) 2 288 Mat1288 Solid Urethane foam core Yes 4.1500 ❑ 81 Matl81 ASPHALT -ROOFING, Yes 0.1500 ❑ ROLL 244 Mat1244 PLYWOOD, 1/21N No 0.6318 0.0417 0.0660 34.00 0.2900 ❑ 185 Mat1185 CLAY TILE, PAVER, 3/81N No 0.0301 0.0313 1.0410 120.00 0.2000 ❑ 82 Mat182 ASPHALT -SHINGLE AND Yes 0.4400 ❑ SIDING 11 Matll l 2 in. Insulation No 6.6800 0.1670 0.0250 2.00 0.2000 ❑ 47 Mat147 2 in. Heavyweight concrete No 0.1670 0.1670 1.0000 140.00 0.2000 ❑ 95 Mat195 CONC BLOCK No 0.7107 0.3333 0.4690 101.00 0.2000 ❑ HW-4IN-HOLLOW 248 Mat1248 ROOF GRAVEL OR No 0.0500 0.0417 0.8340 55.00 0.4000 ❑ SLAGI/21N 94 Mat194 BUILT-UP ROOFING, 3/81N No 0.3366 0.0313 0.0930 70.00 0.3500 ❑ 3/18/2004 Constructs Used EnergyGauge FlaCom FLCCSB v1.22 8 No Name Simple Massless Conductance Heat Capacity Density RValue Construct Construct [Btu/h.sf.F[ [Btu/sfF] [Ib/cQ [h.sf.FBtu] 1002 Aluminum door, 1.25 in. polystyrene No No 0.19 0.53 43.67 5.2104 ❑ Layer Material Material Thickness Framing No. [ft] Factor 1 264 ALUMINUM, 1/16IN 0.0050 0.00 ❑ 2 214 POLYSTYRENE, EXP., 1-1/41N, 0.1042 0.00 ❑ 3 264 ALUMINUM, 1/16IN 0.0050 0.00 ❑ Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sf.F] [Btu/sEF] [Ib/ct] [h.sf.FBtu] 1005 1 ft. soil, concrete floor, carpet and rubber pad No No 0.17 54.00 108.00 5.7300 ❑ Layer Material Material Thickness Framing No. [ft] Factor 1 265 Soil, 1 ft 2.0000 0.00 ❑ 2 48 6 in. Heavyweight concrete 0.5000 0.00 ❑ 3 178 CARPET W/RUBBER PAD 0.00 ❑ Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sf.F] [Btu/sf.F] [lb/cf] [h.st:FBtu] 1011 8 in. split -face CMU, 1-1/2"metal furring No No 0.13 5.54 33.98 7.6845 ❑ strips @ 16" O.C. W/ R-8 Insulation Layer Material Material Thickness Framing No. [ft] Factor 1 42 8 in. Lightweight concrete block 0.6670 0.00 ❑ 2 214 POLYSTYRENE, EXR, 1-1/41N, 0.1042 0.00 ❑ 3 187 GYP ORPLAS BOARD,1/2IN 0.0417 0.00 ❑ 3/18/2004 EnergyGauge FlaCom FLCCSB v1.22 1 9 I No Name Simple Construct Massless Conductance Heat Capacity Construct [Btu/h.sf.F] [Btu/sf.F] Density [Ib/cf] RValue [h.sf.FBtu] 1047 Mtl Bldg Roof/R-19 Batt No No 0.05 1.34 9.49 20.3366 ❑ Layer Material Material Thickness Framing No. [ft] Factor 1 94 BUILT-UP ROOFING, 3/SIN 0.0313 0.00 ❑ 2 23 6 in. Insulation 0.5000 0.00 ❑ 3/18/2004 EnergyGauge FlaCom FLCCSB v1.22 10 N1' RN-11 auaN la5ulo0 6 1811E 61:16 11 W N sal uoJ6aJd aludlauil (paylaN uaillunl JadsuodJ) 110/6118 :A6alopaglaN pool 6uiloa] JagUdiad of AJunuo£ :paiJad uoilolnuiS ualsAS JaquanaN of aun£ :pmJad uoilaln IS u6isa0 (ldn/Jglviu-ql) 6099'6 Jal;a1 Adliqu3 (}dna/Jq/ Ulu -ND 6'HO :Jalaol loaN lualol (11ldmLJq/viu-n18) L6IIl :paid loaN7idnadS-Alisua0 (1/uql/nl8) 666d'0 Ilq iij!AS Jiy (UnIME 09L0'0 :Alisua0 Jiy 08.0 :aauolialiq punaJ9 JaluiA 02A :alualaaldaN punaJ9 JauunS (1) 8E :g1n0 Aig u6tsa0 Jalwp (1) 8L gln8 JaA u615a0 JauunS (1) 89 :gln0 AJN u6isa0 JauunS S6'0 :JaqunN ssaujIdIj Jalulm 961 :JaqunN 5saudaal] JauunS (OH 'uI) 6'62 :adnssaJd IIJIaUOJag (ld) 91 :u01lonall g :auaL aull AN L'09 :apnli6ual (cap) 1'82 :apnl!Jal ua i laial NNn813N :apoj 31il Jaglaa0 RHO) S al '911833N19N3 1Stl9 6 91 N]NV £ MIN 112 9N180011 NtlN3100 1 InI1711x131IllnIISIInl23ln3;133;11n3x37xiix3lii;i;;;nni113n32;7lniix 313357113532323iflS313fl3333733333i313ii131x323l333333733313113;3733235333137 3i 33 li 9NIII)m 'S'0'] Aq n n n n SISA1tlNtl 009 3�tlN1 n 3; 73 3832313332213I31113723313332331333;333133I31332l32131133321;83l3I33;331I231 33;1311331371333i3I3122S333i133I132773S7;3I333373l3I3i31312333333213113313323 0 19tld 9N113N8VN 'S'0'9 :A8 009 A snuauaI3 6wuallipuo0 ily amil Iran Air Conditioning Economics By: C. B. S. MARKETING AIRFLOV - ALTERNATIVE I V 600 PAGE I ----------------------------------- S Y S I E H S U M M A R Y ---------------------------------- (Design Airflow Duantities) ------------------------- gain -------- -- Auxil. Room Outside [Doling Heating Return Exhaust Supply Exhaust System System AirFlow AirFlor Airflow Airflow AirFlow Airflow Airflow Number Type (Ern) (Ern) (Cfn) (Cfn) (Cfn) (Cfn) (CFn) I SZ 537 3,4111 3,4111 3,4111 537 D D Totals 537 3,4111 3,4BI 3,491 537 D D CAPACITY - ALTERNATIVE I SYSIIH SUHNARY (Design Capacity Duantities) --------------- Cooling --------------- --------------------------------- Heating ---------------------------------- Hain Sys. Aux. Sys. Opt. Vent Cooling Hain Sys. Aux. Sys. Preheat Reheat Hunidif. Opt. Vent Heating System System Capacity Capacity Capacity Totals Capacity Capacity Capacity Capacity Capacity Capacity Totals Number Type (Tons) (Tons) (Tons) (Tons) (Btuh) (Btuh) (Btuh) (8tuh) IBtuh) IBtuh) (Btuh) I S1 9.6 D.0 O.D 9.6 -B5,719 D 0 D D 0 -115,710 Totals 9.6 D.0 0.0 9.6 -85,710 D D D 0 0 -B5,71D The building peaked at hour 16 month B with a capacity of 9.2 tons ENGINEERING CHECKS - ALTERNATIVE I ------------------------------------ E N G I N E E R I N G C H E C K S ------------------------------------- Percent ------------- Cooling -------------- --- Heating ---- System Main/ System outside CFn/ Crn/ Sq Ft Btuh/ Cfn/ Btuh/ Floor Area Number Auxiliary Type Air Sq It Ton /Ton Sq rt Sq Ft Sq Ft Sq It t Hain SZ 15.42 I.17 363.2 311.0 3B.5B I.17 -2B.75 2,9B1 Trane Air Conditioning E[ononi[s V 6DD By: C. D. S. MARKETING PAGE 2 SYSTEM CHECKSUMS Systen I Peak SZ - SINGLE ZUNE SYSTEM [FEFFFIIEIFIFFIIIEIFEFIFF CODLIMG COIL .PEAK FF[I[EIEEEEEEEF[EEREFEEEEi[FIII CLG. SPACE PEAK. EFFEEEFEIEEI HEATING _[OIL _PEAK . E[i[[IFI Peaked at Tine =_) Mo/Hr: B/16 I No/Hn 9115 E Ho/Hr: 131 1 Outside Air =_) OADB/WB/NR: BY 7B/133.0 [ DADB: B6 [ DADB: 3B I F SpaEe Rot. Air Ret. Air Net Per[nt [ Spa[e PerEnt I Spa[e Peak Coil Peak Per[nt Sens.+Lat. Sensible Latent Total OF Tot I Sensible OF Tot I Spa[e Sens Tot Sens OF Tot Envelope Loads IBtuh) (Btuh) (Btuh) (Btuh) (7.) I (Btuh) ('Z) I (Btuh) (Btuh) (%) Skylite Solr 0 0 D 0.00 I B 0. Do i D D D . D 0 Skylite Cond 0 0 D D.DD E D D.BD I D D D.DB RooF Cond D 9,377 9,377 B.15 I 0 D.Do E 0 -4, 25D 4.96 Glass Solar 15,2D0 D 15,20D 13.22 F 17,41D 23.62 I D D D.OD Glass Cond 1,75D D 1,750 1.52 F 1,134 1.54 F -7,B66 -7,066 9.IB Wall Cond 2,B97 6D7 3,504 3.05 I 3,015 4.09 i -3,39D -4,3D4 5.02 Partition I, 463 1,463 1.27 I 1,375 I.B7 x -4,646 -4,646 5.42 Exposed Floor 0 B D.0D I 0 0.00 I D D 0.0D Infiltration 0 0 0.00 I D D.DB I -t -1 D.BD Sub Total==) 21,311 9,9B4 31,295 27.21 E 22,934 31.It F-15,9D3-2I,061 24.5E Internal Loads I I Lights l6, 792 0 16,792 14. 69 [ 16, 792 22. 76 I D 0 D.Do People 13,420 13,420 11.67 E 6,710 9.1D F 0 D 0. Do Nis[ 17, 666 D D 17, 666 15.36 F 17, 666 23. 96 I 0 D D.DD Sub Total==) 47, B7B D B 47378 41.63 I 41,166 5534 i 0 D D.DD Ceiling Load 9,964 -9,9B4 D D.DD I 9,61B 13.05 I -5,164 D 0. Do Outside Air D D D 32,129 27.93 I D D.DD E D-23,345 23.74 Sup. fan Heat 3,713 3.23 [ D.DD E 0 D.DD Rot. fan Heat D 0 D.DD E D.Do i D D.BD DuEt Heat Pkup D D D.DD E 0.00 I D D.BD OV/UNOR Sizing D D D.00 I D D.DD I-44,29B -44,29B 51.6E Exhaust Heat 0 0 0 D.DD I O.DD [ B D.DD Terninal Bypass D 0 0 D.DD [ 0.00 I 0 D.DD [ I brand Total==) 79,172 0 0 115,D13 IDD.DD F 73,720 100.00 E-65,365 15,71D 100.DO ------------------------------------COOLING COIL SELECTION----------------------- -- AREAS -------------- Total Capiiity Sens Cap. Coil Airfl Entering DB/WB/HR Leaving DB/WB(HR Gross Total Glass (sf) (K) (Tons) (gbh) (Mbh) (Ern) Deg F Deg F Grains Deg F Deg F Grains floor 2,9BI Main 110 9.6 115.0 B3.2 3,461 76.B 64.6 71.7 55.0 53.7 59.3 Part I'm Aux 110 0. D D. B 0. 0 D 0.0 D. D 0. 0 0. 0 0.0 D. D ExF lr 0 Opt Vent 0.0 D. 0 U. 0 D 0.0 D. B D. 0 D. 0 D. D 0. D RooF 2, 9BI D 0 Totals 9.6 115.D gall 1,070 t9D to -----------HEATING COIL SELECTION --------AIRFLOWS ([fn)- ENGINEERING CHECKS-- --TEMPERATURES (F)--- Capa[ity Coil AirFl Ent Lvg Type Cooling Heating CID'L OA 15.4 Type CID Htq IMbh) ([Fn) Deg F Deg f Vent 537 537 mg Crn/Sgrt 1.17 SAID 56.0 BB.B Hain HtD 15.7 3,4B1 66.B BB.B Inril 0 D LID Crn/Ton 363.16 Plenun B5.6 66.5 Aux Htq D.D D 0.D D.0 Supply 3,4BI 3,4BI CID Sgft/Ton 3II.D3 Return 75.D 72.0 Preheat -D.D 3ABI 66.B 55.0 Min[Fn D D ClgBtuh/Sgft 3B.5B Ret/DA 76.B 66.B Reheat 0.D D 0.9 0.0 Return 3,4BI 3,4BI No. People 27 Runarnd 75.0 72.D Hunidir 0.D D 0.0 0.D Exhaust 537 537 Htg % OA 15.4 In MIT 0.2 D.0 Opt Vent D.0 0 D.B 0.9 RA Exh D 0 Htg CFn/SgFt 1.17 In BldfD 0.2 0.0 Total -B5.7 Auxit D 0 Htg Btuh/Sgft -2B.75 In fri[t 0.5 D.0 Product Review Affidavit St Lucie County, Public Works Department Code Compliance Division The following products will be installed in the structure located at ebwmwa Qttcl p Pr fteR[e1 t � Building Permit # Owners Name COt MAV3 RCOF, (IMPALA' Y Owner's Address NCO ToLLVIM lk. *LL)46 ArIEdl lid IL la=B Contractor CD►d5T1a5GM�4� 6,7c. Contractor's Address 1465 &NSZ WiNtKfac.FL 327FA *Product Rated I Manufacturer (Model Number[ Method of Attachment Windows * Fifi in doe rated wind design pressures listed by the manufacturerfor each product fisted 1st Choice NIA Mullions ized Glass 1st Choice 4,0 -4O CSF YW AFAMWJCA M-Ieo icrA 3%t(osX 341�fCoNS @ 8°!]L . Skylights 1st Choice .I -bp (gyp fW CE0 QtKrfo ICWL IS(M. MA**4%Y "rvAW. 1t1R 2nd Choice w.�w Overhead Garage Doors CraL L)r) 1st Choice t8- by m 2nd Choice mom, Roofing Material AsphaltTiberglass Metal -AM MOM ILDI" ?wr NCS MP LIiiMT,. Other I I I I ";( M'ef I have reviewed the above components and cladding, and have approved their use'in,the structure provide adequate resistance to the wind loads and forces specified by curre nt co ro�"toies: e , Name: MICMAEL'D. aVANA1366' Si rr Design Firm rAg AA'1N16wI11RS 6. A4M %Merl- No. GiDI$_ te: fAGt &fJ St. Lucie County Building and Zoning Department 2300 Virginia Avenue Fort Pierce, FL 34982 ON-462-1553 '172 - -- - - --- Design Certification for Wind Load Compliance This Certification is to be completed by the project design architect or engineer. 71is Certification must be submitted with all applications for building permits involving the construction of new residence (single or multi- family), residential addition, any accessory structure requiring a building permit, and any nonresidential structure. This Certification "not apply to interior renovations (provided that no structural walls, columns or other similar component is being effected) and certain other minor building permits. For Anther assistance, please contact the Building Inspection Office at 462-1553 or 462-2172. Project Name I fLM"VA. FLCOK (O Office Use Only Street Address Permit Number FIEWe., SL IOceType Construction Type Certification Statement: I certify that, to the best of my knowledge and belief, these plans and specifications have been designed to comply with the applicable structural portion of the Building Codes currently adopted and enforced by St. Lucie County. I also certify that structural elements depicted on these plans provide adequate resistance to the wind loads and forces specified by current code provisions. Desien Parameters and Assumptions Used: (Please check or complete the appropriate box.) 1. Florida Building Code 2001 Edition l fo0to . ASCE 7-98 ✓ 2. Building Design is (check one) Enclosed ✓ Partially Enclosed Open Building 3. Building Height: 2 01t 4. Wind Speed Used in Building Design: 140 MPH 3 second gust S. Wind Exposure Classification (refer to exposure tables in Building Code identified In Line #1): 15 6. Average Wind Velocity Pressure on Exterior Faces of Structure 1? PSF 7. Peak Wind Velocity Pressure on Exterior Faces of Structure 35.0 PSF 8. Importance/Use Factor (obtain from Building Code):. I W • O 9. Loads: Floor �?!� _PSF Roof/dead >= PSF Roof/live '2D PSF 10. Were Shear Walls Considered for Structure (cbeek one): Yes ✓ No _(if No, attach explanation) 11. Is a Continuous Load Path Provided (check one): Yes _ // No (if No, attach explanation) 12. Are Component and Cladding Detail Provided (check one): Yes ✓ No _(if No, attach explanation) 13. Minimum Soil Bearing Pressure: 2060 PSF As witnessed by my seal, I hereby certify that the information included with this certification is true and correct, to the best of my knowledge and belief. , , ) �. , Name: M!CoN EL D CA✓8AWO- F Certification #: `''[Seal Here] Design Firm: Ax A & ffE= 9. tdgjR • , hliI . Date: -J_ /A 0002811 SLCCDV Form # 020.00 1-KI5JUIR t1 INE 11l ' 1340/399 04/19/04 03:Slpm P. 002 BOAR® OF COUNTY COMMISSIONERS March 26, 2004 Mr. Joseph T. Friscia, P.E. Friscia Engineering, Inc. 681 SW Whitmore Drive Port St. Lucie, Florida 34984 SST LLuC' E COUNTY 4 Subject: , Coleman Flooring -Minor Site Plan Dear Mr. Friscia: The St. Lucie County Community Development Director has granted your request far minor site plan approval of the above referenced project. This site plan approval becomes effective immediately. Enclosed is an unrecorded copy of the resolution. A recorded copy of the resolution will be forwarded to you upon its receipt by this office from the Clerk of the Court. Please contact me at 772/462-1582 if you have any questions. Sincerely, Hank Flores, AICP Development Review Planner III hf cc: File IOHN D. URIINN. Disma No. 9 • DOUG COWARD. Diwila No. 2 a PAUTA A. LM Dim, Ho. 3 • FMNNIE HUTCHINSON, Diurkl No. 4 - CLIFF BARNES, Disma No- 5 Coum v Adminisrro+or - Douglas M. Anc enw 2300 Virginia Avenue • Farr Pierce, FL 34982-5652 Administration: (772) 462-1590 - Planning: (772) 462-2822 G15lredinicol Services: (772) 462-1553 Economic Development: (772) 462-1550 Fox: (772) 462-1581 Tourisr/Convention: (772) 462-1529 • Fox: (772) 462-2132 vvvvw.co.sr­ludeJJ.us FRI 5G1A ETXoiry v liW ssio40S3o 04/19/04 03:Slpm P. 003 1 2 3 4 s 6 7 e 9 10 11 12 13 �E-1. is 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 46 41 CD-04-006 fiW174 G-003 AN ORDER GRANTING APPROVAL FOR A MINOR SITE PLAN KNOWN AS COLEMAN FLOORING WHEREAS, the St. Lucie County Community Development Director has reviewed the application for site plan approval submitted by Friscia Engineering, reviewed the comments of the St. Lucie County Development Review Committee on this application, and made the following determinations: 1. Coleman Flooring, is a proposed 14,986 square foot distribution facility for property located on Commercial Circle in the Kings Highway Industrial Park in the IL (Industrial, Light) Zoning District. 2. The Development Review Committee has reviewed the site plan for the proposed project and found itto meettechnical requirements of the Land Development Code and to be consistent with the St. Lucie County Comprehensive Plan. 3. The project is consistent with the general purpose, goals, objectives, and standards of the St. Lucie County Comprehensive Plan and the St. Lucie County Land Development Code. 4- The project will not have an undue adverse effect on adjacent property, the character of the neighborhood, traffic conditions, parking, utility facilities, or other matters affecting the public health, safety, and general welfare. 5. All reasonable steps have been taken to minimize any adverse effect of the proposed project on the immediate vicinity through building design, site design, landscaping, and screening. 6. The project will be constructed, arranged, and operated so as not to interfere with the development and use of neighboring property, in accordance with applicable district regulations. 7. The project is to be served by adequate public facilities and services. 8. The applicant has applied for and received an updated certificate of capacity, a copy of which is attached to this order as Exhibit A, as required under Chapter V, St. Lucie County Land Development Code. File No.: MNSP-04-003 Go Order 04-006 March 26, 20N Page 1 r r«a:::r-i erv�:rveerci rv� bb1:3410 i�� 04l19l04 oa:51pm V. 004 1 2 3 4 5 6 7 - s 9 to 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 NOW, THEREFORE, BE IT ORDERED: A. Pursuant to Section 11.02.03 (D) of the St. Lucie County Land Development Code, the proposed Minor Site Plan known as Coleman Flooring, is hereby approved as shown on the site plan drawings for the project prepared by Friscia Engineering, dated March 10, 2004, and received by the St. Lucie County Community Development Director on March 23, 2004, on the property described as follows: LOT 23, BLOCK B, KINGS HIGHWAY INDUSTRIAL PARK, UNIT2, AS RECORDED IN PLAT BOOK 32, AT PAGE 5'OF THE PUBLIC RECORDS OF ST. LUCIE COUNTY, FLORIDA. (TAX ID. It: 1335-802-0045-00011) (Location: Commercial Circle, Kings Highway Industrial Park) B. The approvals granted by this administrative order shall expire on March 26, 2006, unless a building permit is issued or an extension is granted in accordance with the provisions of Section 11.02.06 of the St Lucie County Land Development Code. C. The Final Site Plan approval granted under this Resolution is specifically conditioned to the requirement that the petitioner, Coleman Flooring, including any successors in interest, shall obtain all necessary development permits and construction authorizations from the appropriate State and Federal regulatory authorities including, but not limited to; the United States Army Corps of Engineers, the Florida Department of Environmental Protection, and the South Florida Water Management District, prior to the issuance of any local building permits of authorizations to commence development activities on the property described in Part A. D. A copy of this Order shall be attached to the site plan drawings described in Part A, which plan shall be placed on file with the St. Lucie County Community Development Director and mailed, return receipt requested to the developer and agent of record as identified on the site plan applications. E. The Certificate of Capacity, attached as Exhibit A, shall be valid forthe same period as this order. If this order expires or otherwise terminates, the Certificate of Capacity shall automatically terminate. File No.: LFNSP-04-003 March 26.2004 CD Order 04-006 Page 2 r KaSL:aP tNL�l NttFCl rvV SS1,"�i41'J ly'tlb' 04/15l04 03:Slpm P. 005 1 2 3 4 s 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 F. This order shall be recorded in the Public Records of St. Lucie County. ORDER effective the 268i Day of March 2004. COMMUNITY DEVELOPMENT DIRECTOR ST. LUCIE COUNTY, FLORIDA Den,y} s J. Murphy I APPROVED AS TO FORM AND CORRECTNESS: County Attorney ht HaW ORDIPETITIONSIBCC\FINISHED.2004IColemanFloo4nn,SPlColamanFloodnSCDO.doe File No.: MNSP-04-003 March 26, 2004 CD Order 04-006 Page 3