Loading...
HomeMy WebLinkAboutLETTER FROM GODWIN ENGINNERING*03 D 3 GODWIN ENGINEERING AND DESIGN, LLC 8378 Foxtail Loop, Pensacola, FL 32526 1 (850)712-4219 1 chad@godwineng.com March 14, 2019 To: St. Lucie County Building Division 2300 Virginia Avenue Ft. Pierce, FL 34982 Re: Sexton — Residential PV Roof Mount Installation 5304 Birch Drive Fort Pierce, FL 34982 Plan Reviewer, RECEIVED SCANNED By MAR 2 6 2010 St. Lucie Countypermitting Department St. Lucie County This letter is regarding the installation of a new ground -mounted Solar PV system at the address above. I have analyzed/reviewed the attached plans and have determined that the Ground Mounted PV Structure is in compliance with the applicable sections of the following Codes and Reference documents: Codes: 2017 Florida Building Code 6h Ed., FBC ASCE/SEI 7-10 Min. Design Loads for Buildings & Other Structures References: Aluminum Design Manual 2015. IronRidge Exhibit EX-0001 Per FBC 2017, the Ground Mounted PV structure is considered risk category I structure and will be subject to the following design criteria: Design Wind Speed(V ir) - 150mph 3sec gust, Exposure Category — C The structure is a simple column(pier) and beam (cross pipe) system. The tops of the piers are connected in the E-W direction by the cross pipes which cantilever over and extend past the end piers. The cross pipes are connected by proprietary IronRidge XR1000 Rails spanning up and down the slope which cantilever over and extend past the top and bottom cross pipes. There are typically two rails per column of modules. The modules are clamped to the rails by the IronRidge module mounting clamps. If the structure is constructed according to the attached drawings and in accordance with the IronRidge Ground Mount installation manual, it will be more than adequate to support the design wind loads. Please see attached documents and cntiwrd you have any questions. Sincerely, D. Chad Godwin, PE 81360 Exp.02/28/2021 FILE Copy BLDG: DAiE: /fj�/��/ ELE'��=� DATE PLUMB: DATE MECH: DATE: 1360Ir , A E OF ��\ �'•Ft RIOP•'G\��� � sexton GROUND -BASED 28357 INDUSTRIAL BLVD, HAYWARD, CA94545 Project Details NAME Sexton LOCATION Fort Pierce, FL, 34982 MODULE Mission Solar Energy:MSE305SQ8T (40mm) DIMENSIONS 65.53" x 39.33" x 1.57" (1,665 x 999 x40mm) Load Assumptions DATE 2019-03-14 TOTAL MODULES 40 TOTAL WATTS 12,200 TILT 25 deg CONFIGURATION 5-Up Foundation Requirements WIND EXPOSURE C TYPE Concrete WIND SPEED 150 mph HOLE DIAMETER 12 in. GROUND SNOW LOAD 0 psf MIN HOLE DEPTH 78 in. Substructure Requirements Foundation Loads PIPE SIZE 3" SHEAR 1,237 lbs. DIAGONAL BRACING No MOMENT 3,092 ft-Ibs. UPLIFT -1,582 Ibs. 3rd Party Substructure Materials TOTAL PIPE 212' 5" TOTAL CONCRETE 2.65 yd 3 Array Details Config Repeats Piers/Repeat South Piers North Piers Cross Pipes EW Spacing Cantilever Total Pipe Length 5x8 1 14 7 (8' 8") 7 (12' 11") 2 (43' 82) 7' 0" 0' 10.1" 238' 5" `.2 * o. 1360 %af:z i� OF // Last updated by Chad Godwin on 2019-03-14 12:26:05 -0700 Pagel of 5 sexton - 28357 INDUSTRIAL BLVD., HAYWARD, CA 94545 GROUND -BASED Plan View Side View CANTILEVER N S PIER 90" SPACING NORTHEOGE CLEARANCE 6'8.4"ABOVE SOUTH EDGE CLEARANCE i i ll1 6'2" BELOW I' 6'2" BELOW MINIMUM 6'6" IIILLf�III * I IILIII HOLE DEPTH 9.0.1 ia—IsI N S PIER SPACING 12" HOLEDIAMETER Note: The Images displayed in this report are meant to represent one portionofthe array. The use ofa breakIlne indicates that the array may contiinu oAkMAJQ Pn i/ \�QO' 360 L (ORIOP,. ///�/rs�ONA I1��G`J I ly II I Last updated by Chad Godwin on 2019-03-1412:26:05 -0700 Page 2 of 5 sexton GROUND -BASED 28357 INDUSTRIAL BLVD., HAYWARD, CA94545 Pipe Fittings Detail Front View Clamp Detail PV MODULE FRAME ------- - - ----- UNIVERSAL ------- FASTENING _______ OBJECT Mid Clamp, Plan Mid Clamp, Front UNIVERSAL FASTENING OBJECT PV MODULE FRAME 2 Side View RAIL PV MODULE FRAME UNIVERSAL FASTENING OBJECT STOPPER SLEEVE UNIVERSAL FASTENING OBJEC PV MODULE RR100D RAIL r RAIL CONNECTOR 3-TOP CAP 3-PIPEaUBING End Clamp, Plan End Clamp, Front C. 360 STOPPER SLEEVE UNIVERSAL FASTENING OBJECT RAIL PVMODULE FRAME Last updated by Chad Godwin on 2019-03-1412:26:05 -0700 Page 3 of 5 sexton GROUND -BASED 28357 INDUSTRIAL BLVD., HAYWARD, CA 94545 Grounding Diagram III III III III n n MINn w w w w V IVJ IVJ (VJ Plan View 'ONy ore Gmu�rp lap required per mntlnuoua albeney. OCAMO • Grounding Lug' Fault Current Min 10 AWG Ground Path = Copper Wire O Bonding Points <-- Fault Current Ground Path Section New -Grounnog Wgs son "A are mt repuhed in symeire using ordain Enphase meontownes or certain Surymwm rn tl lea. Equ¢merd gmuntlhy is aoftweE Win the Engage cable for Erphose or the Ac module cents system Ice Sunpmer Na then Imegreen EGC. �ODF o. 360 r =.� r Jr= OF Last updated by Chad Godwin on 2019-03-1412:26:05 -0700 Page 4 of 5 Sexton28357INDUSTRIAL BLVD, HAYWARD, CA 94545 GROUND -BASED Bill of Materials GROUP PART DESCRIPTION TOTAL CITY RAILS & SPLICES XR-1000-204A XR1000, Rail 204"(17. Feet) Clear, 16 CLAMPS & GROUNDING UFO-CL-01-Al Universal Module Clamp, Clear 96 UFO-STP-40MM-Mt Stopper Sleeve, 40MM, MITI 32 XR-LUG-03-Al Grounding Lug. Low Profile 1 SUBSTRUCTURE 70-0300-SGA SGA Top Cap at 3' 14 GM-BRC-003 Ground Mount Bonded Rail Connector -3" 32 Last updated by Chad Godwin on 2019-03-14 12:26:05 -0700 �• C�.• 6ENG 813 IN NAL �'X1 � TT O • 4/` Page 5 of 5