HomeMy WebLinkAboutTHE PORCH FACTORY CONTRACTThe Porch Factorp LLC
Enclose It So You Can Use It
LICENSED/INSURED
705 North 39th Street • Fort Pierce, FL 34947 SCANNED
Office 772-465-6772 • Fax: 772-465-3252 • www.ThePorchFactory.com • CBC 1258459 BY
St. Lucie Count
Customer. J o6ep k Co,lc, «C> Date o
Email Phone - 5 2 5- 'a 7 1 i
Address 1 a V A ((A M o c:.Pr City F+• P. State Zip 3q55/
Job Name
Address S Ni sH Lv-.Fes , City
Job Phone
State Zip
JOB DESCRIPTION: POOL ENCL. SCREEN PORCH POLY ROOF
ROOF: 7. Mansard
A -Frame Flat
WALLS:
COLOR: onz
White
SCREEN MESH.
20/20 Other
KICKPLATE: Co
Height le
GUTTER: Super
5" 7"
DOWNSPOUT: — 3x4
—.4x5
CHAIR RAIL: 24"
36" Other
DOORS: 5't6rft- 1:�-6a1
KIP
7Built to Code
li Re ,0. N •0_4
& Engineering Included
kt waae.
Date: 10 weeKS
TOTAL CONTRACT PRICE �f $ NIto01'
Deposit % 5 a yc �A2kw4C0$ a.009 r
Payment due on final day of installation.
$ atoD�
* Total Contract Price is for Cash/Checks.
Credit Card Fee is 3.95%.
TERMS AND CONDITIONS
1. The Seller expressly reserves all contractors, mechanics and material man's lien rightswhich maybe asserted under any provision of law to secure payment of the contract price
and may assert and fix the same lien upon the real property upon which Installation Is made.
2. In the event payment of this contract Is enforced through attomayorby suitorin bankruptcyorprobate proceedings, the sellermay recoverand the purchaserherebyagrees to pay
reasonable altomeyfees and costs of court.
3. As an lnducementforThe Porch Factory to enter Into this contract, the signer certifies that the above legal owner and address are correct. It is also understood that there are no
verbal agreements and all Items discussed are covered by this written contract- this is a proposal until signed by an officer of the corporation at which time it becomes an executed
contract. Any additions to this contract shall be covered by a change order. Additional costs of change orders shall be due and payable upon acceptance by the customer.
Acceptance by the owner must be within 14 days of the proposal date or at the option of the seller. They buyer (customer) may cancel this contract within three(3) working days after
signing. Any change orders must be in writing and received priorto final measurement.
4. Afull two year guarantee against defect In purchased assemblies, materials and workmanship goes into effect at completion of this contracted work covered by this contract and
any change orders in effect. Anywarrantywork necessary, however, shall not be done until such time as final Payment has been made to the seller.
5. In the event that any work performed by the contractor is wholly or partially destroyed or damaged due to fire, water, vandalism, or any other cause not under the control of the
contractor, the loss shall be sustained by the owner, and shall not be the responsibility of the contractor. The undersigned acknowledges receipt of a true copy of this contract and
acknowledges that he/she has read and understand the contents thereof and accepts the same on the terms and conditions as stated herein. This contract shall be binding upon
parties hereto, their heirs, successors and assigns. Note: The quoted price is based on dimensions shown In sketch. Anyvariance will be proportionately calculated. Ifmaterialcost
Increase greaterthan 10%the costof material will be added to this contract.
ACCORDING TO FLORIDA'S CONSTRUCTION LIEN LAW (SECTIONS 713.001.713.37, FLORIDA STATUTES), THOSE WHO
WORK ON YOUR PROPERTY OR PROVIDE MATERIALS AND SERVICES AND ARE NOT PAID, IN FULL HAVE A RIGHT TO
ENFORCE THEIR CLAIM FOR PAYMENT AGAINST YOUR PROPERTY. THIS CLAIM IS KNOWN AS A CONSTRUCTION LIEN. IF
YOUR CONTRACTOR OR A SUBCONTRACTOR FAILS TO PAY SUBCONTRACTORS, SUB -SUBCONTRACTORS, OR
MATERIAL SUPPLIERS, THOSE PEOPLE WHOARE OWED MONEY MAY LOOK TO YOUR PROPERTY FOR PAYMENT, EVEN IF
YOU HAVE ALREADY PAID YOUR CONTRACTOR IN FULL. IF YOU FAIL TO PAYYOUR CONTRACTOR, YOUR CONTRACTOR
MAYALSO HAVEA LIEN ON YOUR PROPERTY THIS MEANS IFA LIEN IS FILED YOUR PROPERTY COULD BE SOLD AGAINST
YOUR WILL TO PAY FOR LABOR, MATERIALS, OR OTHER SERVICES THAT YOUR CONTRACTOR OR A SUBCONTRACTOR
MAY HAVE FAILED TO PAY. TO PROTECT YOURSELF, YOU SHOULD STIPULATE IN THIS CONTRACT THAT BEFORE ANY
PAYMENT IS MADE, YOUR CONTRACTOR IS REQUIRED TO PROVIDE YOU WITH A WRITTEN RELEASE OF LIEN FROM ANY
PERSON OR COMPANY THAT HAS PROVIDED TO YOU A "NOTICE TO OWNER." FLORIDXS CONSTRUCTION LIEN LAW IS
COMPLEX,AND IT IS RECOMMENDED THATYOU CONSULTANATTORNEY.
cis 3/z r/2o/f k Z. a --16 --17
SIGNATURE DA?f' E COMPANY REPRESENTATIVE DATE