Loading...
HomeMy WebLinkAboutKSM REPORTSK161f w s-- Up O1 t KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (661) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-ffiI `""®" ?A ilin�ffi ST. LUCIE (772) 229-9093 C.A.: 5693 �j ��(Qj��j�Yj(�� ( j� FAX (772) 589-6469 ASTM D 1667 and ASTM D 2922 DATE TESTED May 31, 2019 KSM JOB # : 192148-1pd/SS/ct PERMIT # SLC- 1g1oq-O2-Oy SCANNED CONTRACTOR Pipeline Pools BY ntunDC GiOn"j '3S St. Lucie County AS JOB LOCATION 25 Majestic Way n*;INNVCS Queen's Cove Ft. Pierce, Florida ITEM TESTED Pool Backfill TEST LOCATION DEPTH PEN DRY MAX. DRY_ PERCENT OF SAMPLE READ DENSITY PROCTOR VALUE COMPACTION - ast - 2 1' - 2' 50+ 95.0+ 3 2' - 3' 50+ 95.0+ 4 T - 4' 42 95.0+ 5 North 0' - 1' 44 107.2 108.9 98.4 6 1' - 2' 47 95.0+ 7 2' - 3' 50 95.0+ 7 3' - 4' 43 1.95.0+ 9 . West 0' - 1' 42 165.0 108.9 96.4 10 1' - 2' 46 95.0+ 11 2' - 3' 46 95.0+ 12 3' - 4' 41 95.0+ Soil Description: Tan Sand with Shell & Rock Fragments In Place Moisture: 5.8 Percent Optimum Moisture: 12.0 Percent Max. Dry Density: 108.9 P.C.F. @ Test Locations the Density & Penetrometer Readings Indicate W 110.0 E 1 I I I I 1 I G 109.0 ••—•1_.._.l_.._ ._..J.._..�.._.._ H I I 1 I I T D I I I I I R108.0 {—••_.i_.._. _.._i._.._I ._.. i.._.._ P Y I I I I I C 107.0 ••_.j_ ._.j_.._j._..l.._. �.._.._ I I I I 106.0 I I I 1 I I 105.0 .._.1_.._.j _.._j._.._j.._...._..� 9 10 11 12 13 14 15 Moisture - % of Dry Weight 3 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 KEL.LER, SCHLEICHER & MacWiLLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 - ?ALM BEACH (561) 845-7445 vdww.lcsmsngineeiirg.naf MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: I(SWKSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 December 20, 2017 Paul Sasseville 129 Queen Christina Court Fort Pierce, Florida 34949 Re: 25 Majestic Court Fort Pierce, Florida KSM Project #: 173834-b Dear Mr. Sasseville: SCANNED BY St. Lucie County RECEIVED APR 2 5 2019 Sr. Lucie County, Permitting As requested, KSM Engineering & Testing has performed a subsurface investigation at the referenced site. Presentation of the data gathered during the investigation, together with ourgeotechnical related opinions, are included in this report. A. Site Description: At the time of drilling, the canal front site was fairly flat with light surface vegetation. B. Project Description: A one story house and swimming pool is planned to be constructed on the site. Loads from the structure will be transferred to the ground by conventional shallow footings. We anticipate maximum wall loads for the structure will be less than 2,000 pounds per linear foot along the wall foundation. We estimate�some site fill will be required to reach the desired grades. n FILE Ct1PY Ronald G. Keller, P.E.: 37293 / SI Lie. No.: 860 / Julie E. Keller. RE.: 68366 is iVp tom i&. KELLER. SCHLEICHER & MacVVILL IANI ENIGINEERINIG AND TESTING, INC. MARTIN (772) 337-7755 P.O SONX 78-1',7 7, SEBAS I IAN FL 32978-1377 SEBASTIAN (772) 589.0712 PALM BEACH (561) 845-7445 ww+,v.ks.-nengineering.net MELBOURNE (321) 768-3488 FAX (561) 845-8876 E-Wail: KSM@KSMENGiNEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 25 Majestic Way Fort Pierce, FL -2- C. The scope of our study consisted of the following: December 20, 2017 1. Performed Standard Penetration Test Borings in the proposed construction area to estimate the subsoil relative density. 2. Measured the groundwater level at each boring. 3. Evaluated the existing soil conditions with respect to the proposed construction and provided recommendations for site preparation and foundation design. 4. Prepared this report to document our findings. D. Site Investigation: The site investigation program consisted of performing five (5) Standard penetration test borings in the proposed construction area. The borings were terminated at depths of 10 to 14 feet below grade. The locations of the borings are indicated on the attached boring logs. The SPT borings were completed in accordance with procedures described in ASTM D- 1586. A standard 1.5 inch I.D., 2 inch O.D. split -spoon sampler is driven into the soil by successive blows of a 140 pound hammer freely falling 30 inches. The number of blows required to drive the sampler 1 foot, after seating 6 in., is designated the Penetration Resistance, or "N" value. At regular intervals the sampler is extracted from the ground and opened to allow visual examination and classification of the retained soil sample. The records of the soils encountered, the penetration resistances and groundwater level are shown on the attached logs. P.onald G. Kerier, P.E.: 37293 I Sl 1-iv. Ne.: 860 / Julie E. Keller, RE.: 6836C n P011A- IDOM KEL.LER, SC;HLEICHER 8: Mac-WILLi'AM Ef,IGINE—EKING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBAS R iAN, FL 3'2978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www3lsmengineenng.net MELBOURNE (321) 768-8488 FAX (561) 845-8976 E-Mail: i<SNiLKS'MENGiiilEERING.f4L r ST. LUCIE (772) 229-9093 GA.; 5693 FAX (772) 589-6469 25 Majestic Way Fort Pierce, FL -3- E. Engineering Evaluation and Conclusions: December 20, 2017 Based on the information obtained from this site investigation we are pleased to offer the following evaluation: The boring logs indicate the subsurface soils consist mostly of fine-grained sand and fine-grained sand that is slightly silty. However, a very loose soil layer consisting of sandy clayed silt with organics was found in the test borings between a depth of about 4 to 6 feet below existing grade in the location of the proposed house and pool. Please refer to the soil boring logs for specific information relative to the soil description. In order for a shallow foundation to perform satisfactorily, it must be able to support the structural loads with an acceptable factor of safety against excessive settlements; both total and differential. Due to the settlement potential of the very loose sandy clayed silt layer with organics found on the site, we do not recommend supporting the proposed residence on conventional shallow footings. The anticipated settlement, in our opinion, would be too excessive and beyond the general accepted safe limits for the structure. In order to avoid any damaging structural distress due to differential settlements, a more appropriate foundation system would be an engineered concrete steel reinforced structural slab designed for a net soil contact pressure not exceeding 1,500 psf designed for differential settlement. The structural slab foundation shall have a footing below all load bearing walls, reinforced with both top and bottom steel and poured monolithically with the concrete slab. The slab should be reinforced with rebars and have interior deepened reinforced sections so that the maximum slab span does not exceed 20 feet in any direction. F. Site Preparation: The proposed building area, plus a minimum margin of five feet beyond the proposed construction shall be stripped and grubbed of surface debris, including vegetation, roots and organic matter. The building area should be graded level and proofrolled. Any soft yielding areas shall be excavated and replaced with clean compacted fill. Sufficient passes should be made during the compaction operations to produce a density no less than 95 percent of its modified dry Proctor value (ASTM D 1557) to a depth of two feet. Ronald G. Koller, RE.: 37293131 Lic. i4o.: 860 / Julie E. Keller, RE.: 6826E &F, A ar: ' go A'V% KELLER, SCfiLEIC-HER t" UiaCIMI ..i_IAN! ENGiNEF_PING AND TESTING, ING. MARTIN (772) 337=7765 P.O.BOX 78_13 f7 SEt3AS 1 IAN ci . 32978-1 377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 MELBOUR14E (321) 768-848e �:vavmaksmengire�ring.net FAX t561) 845-8876 E-;Wail: KSIVj@KSRrEiJGINEERING.hIET S T. LUCIE (772) 229-9093 C.A.: 5693 FAY (772) 589-646P 25 Majestic Way -4- December 20, 2017 Fort Pierce, FL After the exposed surface has been proofrolled, the building and pavement areas may be filled to the desired grades. Additional fill material shall consist of clean granular sand containing less than 10% material passing the U.S. Standard No. 200 mesh sieve. Structural -fill should be placed in uniform loose layers of 12 inches in thickness and compacted to at least 95 percent of its modified Proctor value (ASTM D 1557). After excavating for the footings, the disturbed footing subgrade should be recompacted to 95 percent (minimum) of its modified dry Proctor value. This can be best achieved by making several passes with a relatively light -weight walk -behind vibratory sled or roller. We recommend field density tests be performed at appropriate times during the earth work operations in order to verify that the site has been properly constructed. G. Swimming Pool: The pool shell can be supported on a conventional pool foundation provided that the soft soil layer with organic material from 4 feet to 6 feet is completely removed from the pool bottom. This can be done by over excavating; the pool and backfilling with 3/4 stone so the subrgade becomes firm below the pool bottom. The rock should be compacted using a "jumping jack". The contractor should take measures to ensure that the site preparation work for the pool does not undermine the foundation soils of the residence. A visual inspection; is also recommended to verify! all unsuitable soils have been completely removed below the pool bottom. Provided that the site is properly prepared, the pool can be designed and constructed using an allowable soil bearing pressure of 2,000 pounds per square foot, or less. Backfill material behind the pool shell shall consist of clean granular sand with less than 10 percent "fines" passing the U.S. No. 200 sieve. Place backfill material in loose lifts of 12 inches in thickness and compact each' lift to' no less than 95 percent of its modified dry Proctor value (ASTM D 1557). Temporary "dewatering" will be required during the site preparation work and construction of the pool shell. Ronald G. Keller, P.E.: 37293 / SI Lic. P1o._ 860 / ;Julie E. Keller, AE.: 68366 a }� ( & Pt LTZ �y� VIL KELLEP, SCHLEICHER & MacWILLIAM ; NIGINEERING AND TESTING. INC. MARTIN (772) 337-7755 P.O. BOX 78-1377. EBAS T i N FL 32g78--i 377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445wwwAsmengineerinq_.nei MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NE ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 25 Majestic Way -5- December 20, 2017 Fort Pierce, FL H. Closure: This report has been prepared in accordance with generally accepted soil and foundation engineering .practices based on the results of the borings and the assumed loading conditions. No warranties, either expressed or implied, are intended or made. This report does not reflect any variations which may occur between the borings. If variations appear evident during the course of construction, it would be necessary to re- evaluate the recommendations of this project. Environmental conditions, wetland delineation, water quality, and municipal requirements are not a part of this report. We are pleased to be of assistance to you on this phase of your project. When we may be of further service to you or should you have any questions, please feel free to N\- JEK.jt E-mail to: sasseville.paul@gmail.com Ronaid G. KeOe � t?E.: 3f293 / SI L•C, I`JA.: 860 i 1•u!ie E. I<eHe;. P.'r`_.: 68366 Y u KbM tnglneenng s-- . log BORING NUMBER B-1 Box 78-1377 KSMP.O. Sebas an, FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Paul Sasseville PROJECT NAME 25 Maieslic Way PROJECT NUMBER 173834-b PROJECT LOCATION Fort Pierce. Florida DATE STARTED 12/14/17 COMPLETED 12/14/17 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample VAT TIME OF DRILLING 3.58 ft LOGGED BY DP/SF/JV CHECKED BY JEK AT END OF DRILLING — NOTES East Section of Building AFTER DRILLING — ,u o rr A SPT H VALUE e U j > y W w a 5 20 40 60 80 PL MC LL IT—, 160 ar CL E Q. O MATERIAL DESCRIPTION j Q �z" O j Q W 2 �c z 0 p �z U� coo V' }" 20 40 60 ❑ FINES CONTENT (%) ❑ a M n 9n An An an Dark Brown Sand with Traces of Roots --.__......i............... . .. ..._......[.................. ... .....:.......:......:......:...... ......i.......i......_......i...... - i ............ _ .. ... ..............................:...... ......:.... ..:........... ..... . .... _......... ............. .......: .....:.......:.......:...... Dark Brown Sand with Traces of Shell Fragments 2 3-3-4 SS 5-4-2 (6) Dark Brownish Gray Sandy Clayed Silt With traces of Organics SS 1-1-3 (4) Gray Sand, Slightly Silty with Traces of Shell Fragments SS 4-5-6 SS 2-1-2 (3) SS 7-8-11 (19) SS9-12-14 (26) Bottom of borehole at 14.0 feet n KSM Engineering & c__,Ng BORING NUMBER BIZ �j KS1Y1 PAGE 1 OF 1 S basban, FL 32978 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Paul Sasseville PROJECT NAME 25 Maieslic Way PROJECT NUMBER 173834-b PROJECT LOCATION Fart Pierce Florida DATE STARTED 12/14/17 COMPLETED 12/14/17 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample �ZATTIME OF DRILLING 3.67 ft LOGGED BY DP/SF/JV CHECKED BY JEK AT END OF DRILLING — NOTES Center Section of Building AFTER DRILLING — W -1 A SPT N VALUE L) .. } 0r >- O w w (L 20 40 60 80 PL O LL �-- 0. � =O Q O MATERIAL DESCRIPTION ~m W g wo > O �zM O>¢ W t=� z a o J o_ � O � ED � " Y " 20 40 60 80 ❑ FINES CONTENT (%) O mz W U z a 0 0 20 40 60 80 Brown Sand with Traces of Roots Light Brown Sand with Some Shell 2-3-4: ...... ............. ....... ..... . :.:.,... - .:. SS (7) ............... ....... _...... ....... . SS 3-3.2 ....... :............ ,.. 0::. Brown Sandy Clayed Silt with Some Organics (5) ..... ......... . 5 o'. 1-1-4 SS (5) ......_............................. Gray Sand, Slightly Silty with Traces of Shell Fragments SS 632 - .. .. .. .. 10::: m(6) SS 1-2-0 ............. :...... _...... :...... . - - ....._............................ :. m .. . - .., .. SS 6-77-14 - - ' (25) .. .:. SS 12-13-16 ......_.. ...:. ......:.......:..... h (29) r Bottom of borehole at 14.0 feet. N U O O N W LL V Y K R W Ny L N Y V O N O U 9 Q h_ O W � 2 N H O C G U W H W KSM Engineering & ._ ._'ngP.O. BORING NUMBER B-3 i/C� A Box 78-1377 I1LJ1Vl Sebastian, FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax: (772�589-6469 CLIENT Paul Sasseville PROJECT NAME 25 Maiestic Way PROJECT NUMBER 173834-b PROJECT LOCATION Fart Pierce. Florida DATE STARTED 12/14/17 COMPLETED 12/14/17 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample -VAT TIME OF DRILLING 3.75 ft LOGGED BY DP/SF/JV CHECKED BY JEK AT END OF DRILLING — NOTES SW Section of Building AFTER DRILLING — W e tt C SPT N VALUE A U r y w w w 5 20 40 60 80 ; 0 v Q O MATERIAL DESCRIPTION > 0 O j a W g Z �-� a� O� mO> Y"' a �`� 20 40 60 80 c7 z U z ❑ FINES CONTENT (%) ❑ N W a W 0 20 40 60 80 Brown Sand with Traces of Roots "' Light Brown Sand 3-3-3 SS ...... .::. SZ SS 3-4-5 .....................--- ....._. 5 .:... . -..r .. Dark Brown Sandy Silt with Some Organics 2-1-7 SS . .:.. Gray Sand. Slightly Silty with Traces of Shell Fragments 2-5-8 .............:...... _...... o); SS (13) ... .. :.......:....... ........ ...... . 10 Q} $$ 3i2i ` f i or� ... ..1......1 .......... ... L.... . _ ...: 458 SS : SS 11-14-17 ......... ...:...... :.......:....... N Q:" (37) x Bottom of borehole at 14.0 feet. m U a O N W LL N Y SK W W `2 W N 1� N F n m m a y m r w 2 N r O i x m 2 U w m w O n KSM Engineering 8 , <:_ng BORING NUMBER Ba4 KS1vd S bastian, FL 3 978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Paul Sasseville PROJECT NAME _25 Majestic Way PROJECT NUMBER 173834-b PROJECT LOCATION Fan Pierce. Florida DATE STARTED 12/14/17 COMPLETED 12/14/17 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample VAT TIME OF DRILLING 3.50 ft LOGGED BY DP/SF/JV CHECKED BY JEK AT END OF DRILLING — NOTES NW Section of Building - AFTER DRILLING — a o Z rr A SPT N VALUE A r cc >- cow S 20 40 60 80 WQ O MATERIAL DESCRIPTION j Cl O 5 Q a W m z a PL M0 l L ❑ (no U " } " 20 40 60 80 z z ❑ FINES CONTENT (%) - y ¢ ` a 0 0 20 40 60 80 ....:. Brown Sand o,.;;. Light Brown Sand with Some Shell 4-5-7 SS 5-4-3 Dark Brown Clayed Silt with Traces of Organics 5 SS 2-1-1 Gray Sand, Slightly Silty with Traces of Shell Fragments (21 -—""" SS 3-6-9 t(: SS 3-2-2 ......_ ......:..................."._ cai 10 9 Bottom of borehole at 10.0 feet. a W z w y N Y_ N U O a N W E Y K C W N Y gi n O N C! f ¢ W v 5 N J O F N F y 0 x w 0 w U n • K5M Engineering 1. .ling Tl C'r R P.O. Box 78-1377 BORING NUMBER B-5 111�1Vi Sebastian, FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Paul Sassevilie PROJECT NAME 25 Majestic Way PROJECT NUMBER 173834-b PROJECT LOCATION Fort Pierce, Florida DATE STARTED 12/14/17 COMPLETED 12/14/17 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD flit Snoon Sample AT TIME OF DRILLING — LOGGED BY DP/SF/JV CHECKED BY JEK AT END OF DRILLING — NOTES Center Section of Pool AFTER DRILLING — v (_ w I� Z tt ♦SPTN VALUE = w r ¢ 0 MATERIAL DESCRIPTION >� > > a nw p z Q w y 5 z 20 40 60 80 PL MC LL J Q. mUZ W v`}¢ 20 40�So 80 Co 00P fl:w a ❑ FINES CONTENT (%) ❑ O Silt Sand, Slightly Silty with Traces SS I 3-4-4 (8) --I SS 2-1-2 SS 2-2--2- 1 (3) SS 4-4-5 (9) SS 3-3.2 n