Loading...
HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASEFrom fax561688r1.161.688 w _ �-,8 0909 Mon Sep 23 07:32:5516MDT Page 2 of 3 �` •��a "" w Planning & Deveiopar ent Services S. J «� Building & Code Regulation Division s \�� i 9 Z39�.1� Virginia AveWIN, - �� Fork Pierce, FI 34��2 `M',,' ;....:.:: 772-462-2165 Fax 772-462-6443 Request for 30-Day Temporary Power Release SCANNED BY St. Lucie County Date: Z3 Zl Permit Number: 90 y o333 Project Address: ) % D 7 Seh r P, n -e oO )e . THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TE51ING SYSTEMS AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS: 1. This temporary power release is requested for the above stated purpose only, and there will be no occupancy of any type, other than that permitted by construction during this time period. 2. As witness by our signatures, we hereby agree to abide by all terms and conditions of this agreement, including Building Division Policy, which is incorporated herein by reference. 3: All conditions and requirements listed in the attached document entitled "Requirements for 30 Day Power for Testing" have been fulfilled and the premise is ready for compliance inspection. 4. All requests for an extension beyond 30 days must be made In writing to the Building Official stating the reason for the request. Power may be removed from the site and/or a Stop Work Order issued if the Final Inspection has not been approved within 30 days. A fee of $100.00 will be required to lift the Stop Work Order. WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM ALL LIABILITIES.4ND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT OF THIS TRANSP,CTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE DISCONNECTIOtN OF ELECTRICAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT. OWNER DA