Loading...
HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATEFrom fax5616880909 1.161.688.0909 Thu Nov 7 06:56:24 2019 MST Page 2 of 2 St Lucie County Inspections 2300 Virginia Avenue Ft Pierce, FL 34982 (722)462-2172 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT �q�z{ro3�3 SCANNED BY St. Lucie County PERMIT #Uy C 1 ��?�;� JOB ADDRESS 2702 Bent Pine Dr, Fort Pierce. FL 34951-2955 BUILDER G1-10 Homes PEST CONTROL CONTRACTOR HomcTcam Pest Defense. Ine. PEST CONTROL LICENSE # JF0001886 We, the undersigned, hereby certify that we. have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: 290 Percentage of solution; .50% Date of treatment: 11/04/19 2 Footing Z 1 st Treatinent ❑ Re -treat ❑ Slab ❑ 1 st Treatment ❑ Re -treat ❑ Driveway ❑ 1 st Treatment ❑ Re -treat ❑ Pools ❑ 1st Treatment ❑ Re -treat ❑ Other ❑ 1st Treatment ❑ Re -treat Chemicals used: Sentricon Always Active HD Total gallons used: .50% Time of treatment: AM FBC 104.2.E Certificate of Protective Tregnnent for prevention of termites. .R ucndtenvesi.rmnljabxite polling hoard ,rhu/l he provided to receive duplicale Treatment Certificates as each required protective treatment is completed providing a coprfbr the person the. poennit is iisued to and onathar col?r for the building permit filer. The Treatment Certficate shall provide theproduct used, identity af'the applicator, time and date of the treatment, site location, area b•eated, chemietd used: percent( conceturation and number of gallons used, to establish a veriliable record ofprotective lreatntent. If the soil chemical harrier nnethoel for reunite prevention is used, final exterior trealinent shait be completer! prior fa Anal building approval. St Lucie 'County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. 0 Perimeter for Final Inspection Signature of exterminator NOTE: There must be a completed form for each required treatment or re -treatment and this form mast be on the Job site to bepicked up by the inspector at time of each inspection or the scheduled inspection wilt fail and a re-itt.spection fee charged.