Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ENERGY EFFICIENCY CODE
'Florida 'Energy, Efficiency .Code For 3dildlng Construction ' Florida Department: of'Conmunity Affairs EnergyGawge Summit®•Fla/06rn-2008,, Effective: March 1, 2009 -= Form 4Q0A-2008 Method A: Whole;Building Performance.Method for Commercial Buildings PROJECT SUMMARY SCANNED BY St. Lucie County Short Dese: Rio Arcade Description: Rio Arcade Owner: Poma Corp Addressl: Kitterman Road & US I City: St Lucie County Address2: State: FL Zip: 0 Type: Retail Class: New Finished building Jurisdiction: ST LUCIE COUNTY, ST LUCIE COUNTY, FL (661000) Conditioned Area: 8525 SF Conditioned & UnConditioned Area: 8525 SF No of Stories: 1 Area entered from Plans 0 SF Permit No: 0 Max Tonnage 32.5 If different, write in: N 80 82 ' s� AT OF ofi �ppSP181111O�A1 t171 ��y``` EnergyGauge Summit@ Fla/Com-2008. Effective: March 1, 2009 12/30/2010 Page I of Compliance Summary Component Design Criteria Result Gross Energy Cost (in $) 5,836.0 6,863.0 PASSED LIGHTING CONTROLS PASSES EXTERNAL LIGHTING None Entered HVAC SYSTEM PASSES PLANT None Entered WATER HEATING SYSTEMS PASSES PIPING SYSTEMS None Entered Met all required compliance from Check List? Yes/No/NA IMPORTANT MESSAGE Info 5009 -- -- -- An input report of this design building must be submitted along with this Compliance Report EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009 12/3012010 Page 2 of 7 CERTIFICATIONS I hereby certify that the plans and specifications covered by this calculation are in compliance with the Florida Energy Code ' Prepared By: Eric J. Svobodta, PE Building Official: Date: t r' �' Date: I certify that this building is in compliance with the FLorida Energy Efficiency Code Owner Agent: Date: If Required by Florida law, I hereby certify (*) that the system design is in compliance with the FLorida Energy Efficiency Code Architect: Reg No: Electrical Designer: Reg No: Lighting Designer: Reg No: Mechanical Designer: Reg No: Plumbing Designer: Reg No: (*) Signature is required where Florida Law requires design to be performed by registered design professionals. S EnergyGauge Summit@ Fla/Com-2008. Effective: March 1, 2009 - l2l30l2010 Page 3 of 7 Project: Rio Arcade Title: Rio Arcade Type: Retail Building End Uses 1) Proposed 2) Baseline Total 367.40 507.40 $5,836 $8,074 ELECTRICITY(MBtu/kWh/S) 367.40 507.40 107672 148701 $5,836 $8,074 AREA LIGHTS 104.50 124.70 30624 36551 $1,660 $1,985 MISC EQUIPMT 42.60 42.60 12490 12490 $677 $678 PUMPS & MISC 0.10 0.10 22 21 $1 $1 SPACE COOL 180.20 215.60 52799 63181 $2,862 $3,431 SPACE HEAT 10.30 17.20 3025 5042 $164 $274 VENT FANS 29.70 107.20 8712 31416 $472 $1,706 Passing requires Proposed Building cost to be at most 85% PASSES of Baseline cost. This Proposed Building is at 72.3% EnergyGauge Summit® Fla/Com•2008. Effective: March 1, 2009 ' 12/30/2010 Page 4 of 7 External Lighting Compliance Description Category Tradable? Allowance Area or Length ELPA CLP (W/Unit) or No. of Units (W) (W) (Sgft or ft) None Project: Rio Arcade Title: Rio Arcade Type: Retail (WEA File: FL_ST_LUCIE_CO_INTL.tm3) Lighting Controls Compliance Acronym Ashrae Description Area Design Min Compli- ID (sq.ft) CP CP ance PrOZolSpl 9,001 Playing Area 8,525 20 4 PASSES PASSES Project: Rio Arcade Title: Rio.Arcade Type: Retail (WEA File: FL_ST LUCIE CO INTL.tm3) _ System Report Compliance bPrOSy1 System 1 Constant Volume Packaged No. of Units System 1 Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria 1PLV Criteria liance Cooling System Air Conditioners Air Cooled 11.40 9.50 9.70 9.70 PASSES 240000 to 760000 Btu/h Cooling Capacity Heating System Electric Furnace 1.00 1.00 . PASSES Air Handling Air Handler (Supply) - 0.30 0.90 PASSES System -Supply Constant Volume Air Distribution ADS System 6.00 3.50 PASSES System PASSES EnergyGauge Summit@ Fla/Com-2008. Effective: March 1, 2009 12/30/2010 Page 5 of 7 Plant Compliance Description Installed No Size Design Min Design Min Category Comp Eff Eff IPLV IPLV fiance None Project: Rio Arcade Title: Rio Arcade Type: Retail (WEA File: FL ST LUCIE CO INTL.tm3) Water Heater Compliance D Description Type Design Min Category Eff Eff Design Max Comp Loss Loss liance Water Heater I Electric water heater <= 12 [kW] 0.92 0.89 PASSES PASSES Piping System Compliance Category Pipe Din Is Operating Ins Cond Ins Req Ins Compliance [inches[ Runout? Temp [Btu-in/hr Thick [in] Thick [in] ' IF] SF.F] None EnergyGauge Summit@ Fla/Com-2008. Effective: March 1, 2009 12/30/2010 Page 6 of 7 I: Rio Arcade Rio Arcade Retail File: FL_ST_LUCIE_CO_INTL.tm3) Category Section Report 13-101 Operations Manual 13-102.1, 13-410, 13-413 Windows & Doors 13-406.AB.1.1 Joints/Cracks 13-406.AB.1.2 Dropped Ceiling 13-406.AB.3 Cavity System 13-407 Reheat 13-407.13 HVAC Efficiency 13-407, 13-408 HVAC Controls 13-407.AB.2 Ventilation Controls 13-409.AB.3 ADS HVAC Ducts Balancing Piping Insulation Water Heaters Swimming Pools Hot Water Pipe Insulation Water Fixtures Motors Lighting Controls 13-410 13-410.AB 13-410.AB.4 13-41 LAB Other Required Compliance Requirement (write N/A in box if not applicable) Input Report Print -Out from EnergyGauge FlaCom attached Operations manual provided to owner Glazed swinging entrance & revolving doors: max. 1.0 cfin/ft'; all other products: 0.4 cfm/ft' To be caulked, gasketed, weather-stripped or otherwise sealed Vented: seal & insulated ceiling. Unvented seal & insulate roof & side walls HVAC Load sizing has been performed Electric resistance reheat prohibited Minimum efficiences: Cooling Tables 13-407.AB.3.2.I A-D; Heating Tables 13-407.AB.3.2. I B, 13-407.AB.3.2. I D, 13-408.AB.3.2. I E, 13-408.AB.3.2F Zone controls prevent reheat (exceptions); simultaneous heating and cooling in each zone; combined HAC deadband of at least 5°F (exceptions) Motorized dampers reqd, except gravity dampers OK in: 1) exhaust systems and 2) systems with design outside air intake or exhaust capacity5300 cfin Duct sizing and Design have been performed Air ducts, fittings, mechanical equipment & plenum chambers shall be mechanically attached, sealed, insulated & installed per Sec. 13-410 Air Distribution Systems HVAC distribution system(s) tested & balanced. Report in construction documents In accordance with Table 13-41 LAB.2 13-412.AB ' Performance requirements in accordance with Table 13-412.AB.3 Heat trap required 13-412.AB.2.6 Cover on heated swimming pools: Time switch (exceptions); Readily accessible on/off switch 13-411.AB.3 Table 13-41 I.AB.2 for circulating systems, first 8 feet of outlet pipe from storage tank and between inlet pipe and heat trap 13-412.AB.2.5 Shower hot water flow restricted to 2.5 gpm at 80 psi. Public lavatory fixture how water flow 0.5 gpm max; if self -closing valve 0.25 gallon recirculating, 0.5 gallon non recirculating 13-414 Motor efficiency criteria have been met 13-415.AB Automatic control required for interior lighting in buildings >5,000 s.f; Space control; Exterior photo sensor; Tandom wiring with 1 or 3 linear fluuorescent lamps>30W Check n e EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009 12/30/20I0 Page 7 of 7 Project Name: Rio Arcade Project Title: Rio Arcade Address: Kitterman Road & US 1 State: FL Zip: 0 Owner: Poma Corp EnergyGauge Summit® v3.22 INPUT DATA REPOP Proiect Information Orientation: East Building Type: Retail Building Classification: New Finished building No.of Stories: 1 GrossArea: 8525 SF Zones No Acronym Description Type Area Multiplier [sn Total Area lsn I PrOZoI Zone I CONDITIONED 8525.0 1 8525.0 ❑ Spaces No Acronym Description Type Depth IN Width Height Multi Total Area IN [ft[ plier [sfj Total Volume [cfJ 12/30/2010 EnergyGauge Summit® v3.22 In Zone: PrOZoI I POZoISpI ZoOSpI Playing Area 55.00 155.00 14.00 1 8525.0 119350.0 ❑ Lighting No Type Category No. of Watts per Power Control Type No.of Luminaires Luminsire [W[ Ctrl pts In Zone: PrOZol In Space: PrOZo1Sp1 1 Compact Fluorescent General Lighting 1 10000 10000 Manual On/Off 20 Walls No Description Type Width H (Ef ec) Multi Area DirectionConductance Heat Dens. R-Value [ft] [ft] plier ]sf] [Btu/hr. sf. F] Capacity [lb/cf] [h.sf.F/Btu[ " [Btu/sEF[ In Zone: Pr0Zo1 1 PrOZolWal 5/8"stucco 155.00 14.00 1 2170.0 East 0.2067 5.731 .34.65 4.8 ❑ /8"CMU/3/4"ISO BTWN24"oc/.5" Gyp 2 PrOZoI Wag 5/9" stucco 155.00 14.00 1 2170.0 West 0.2067 5.731 34.65 4.8 ❑ /8"CMU/3/4"ISO BTWN24"oc/.5" Gyp 3 PrOZolWa3 5/8" stucco 55.00 14.00 1 770.0 South 0.2067 5.731 34.65 4.8 ❑ /8"CMU/3/4"ISO BTWN24"oc/.5" Gyp Windows No Description Type Shaded U SHGC Vis.Tra W H (Effec) Multi Total Area [Btu/hr sf F[ IN [ft] plier [sf] 12/30/2010 EnergyGauge Summit@ v3.22 In Zone: PrOZol In Wall: East I PrOZolWalWil User Defined No 1.2500 0182 0.76 3.00 7.00 27 567.0 ❑ Doors No Description Type Shaded? Width H (Effec) Multi [ft] [ftl plier Area [sq Cond. Dens. Heat Cap. [Btu/hr. sf. FJ [Ib/cf] [Btu/sf. F] R-Value [b.sl:F/Btu] In Zone: PrOZQI In Wall: West I PrOZol Wa2Drl ,Solid core flush (2.25) No 3.00 7.00 3 21.0 0.3504 0.00 0.00 2.85 Roofs No Description Type Width [ft] H (Effec) Multi IN plier Area [sq Tilt [deg] Cond. Heat Cap Dens. [Btu/hr. St. F] [Btu/sf. F] [lb/cf] R-Value ]h.sf.FBtu] In Zone: PrOZoI I PrOZolRfl Mtl Bldg Roof/R- 19 Batt 155.00 50.00 1 7750.0 0.00 0.0492 1.34 9.49 20.3 ❑ Skylights No Description Type U SHGC Vis.Trans [Btu/hr sf F] W [ft] H (Effec) Multiplier Area IN [Sq Total Area [Sf] In Zone: In Roof: Floors No Description Type Width IN H (Effec) Multi [ftl plier Area [sfl Cond. Heat Cap. Dens. R-Value [Btu/hr. sil Fl [Btu/sf. FI [lb/cfl [h.sEFBtul 12/30/2010 EnergyGauge Summit@ v3:22 In Zone: PrOZol I PrOZOIFII I ft. soil, concrete floor, carpet and rubber pad 155.00 50.00 1 7750.0 0.2681 34.00 113.33 3.73 ❑ Systems bPrOSyl System 1 Constant Volume Packaged System No. Of Units 1 Component Category Capacity Efficiency IPLV I Cooling System 2 Heating System 3 Air Handling System -Supply 4 Air Distribution System 390009.00 230000.00 9400.00 11.40 9.70 1.00 0.30 6.00 ❑ ❑ ❑ Plant Equipment Category Size Inst.No Eff. IPLV Water Heaters W-Heater Description CapacitlCap.Unit I/P Rt. Efficiency Loss l Electric water heater 30 [Gal] 6 [kW] 0.9200 [En [Btu/h] ❑ Ext-Lighting Description Category No. of Watts per Area/Len/No. of units Control Type Wattage 11 Luminaires Luminaire [sf/ft/No] fW] 11 12/30/2010 EnergyGauge Summit® v3.22 rl ❑E Piping No Type Operating Insulation - Nomonal pipe Insulation Is Runout? Temperature Conductivity Diameter Thickness [F] [ Btu-in/h.sf.F] [in] [in] [ Name Glass Type ASHULSgICIrAt User Defined IFrm Fenestration Used No. of Glass SHGC VLT Panes Conductance [Btu/h.sf.F] 1 1.2500 0.8200 0.7600 W Materials Used Only R-Value RValue Thickness Conductivity Density SpecificHeat Mat No Acronym Description Used [h.sLF/Btu] [ft] [Btu/h.ftF] [Ib/cf] [Btu/Ib.F] 18/ MaI1187 UYFORFLAS No 0.0920 5u.ou 0.2000 Li BOARD, I/21N 178 Mat1178 CARPET W/RUBBER PAD Yes 1.2300 ❑ 265 Matl265 Soil, 1 ft No 2.0000 1.0000 0.5000 100.00 0.2000 ❑ 48 Matl48 6 in. Heavyweight concrete No 0.5000 0.5000 1.0000 140.00 0.2000 ❑ 268 Mat1268 0.625" stucco No O.1302 0.0521 0.4000 16.00 0.2000 ❑ 42 Mat142 8 in. Lightweight concrete No 2.0212 0.6670 0.3300 38.00 0.2000 ❑ block 269 Mat1269 .75" ISO BTWN24" oc No 2.2321 0.0625 0.0280 4.19 0.3000 ❑ 23 Mat123 6 in. Insulation No 20.0000 0.5000 0.0250 5.70 0.2000 ❑ 94 Mat194 BUILT-UP ROOFING, No 0.3366 0.0313 0.0930 70.00 0.3500 ❑ 3/81N 12/30/9010 EnergyGauge Summit® v3.22 5 3 Constructs Used Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sEF] - [Btu/sEF] llb/cfj 1h.sEFBtu1 1011 5/8" stucco /8"CMU/3/4"ISO No No 0.21 5.73 34.65 4.8 ❑ BTWN24"oc/.5" Gyp Layer Material Material Thickness Framing No. [ftl Factor 1 268 0.625" stucco 0.0521 0.000 ❑ 2 42 8 in. Lightweight concrete block 0.6670 0.000 ❑ 3 269 .75" ISO BTWN24" oc 0.0625 0.000 ❑ 4 187 GYP OR PLAS BOARD,1/21N 0.0417 0.000 ❑ Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sf.Fl [Btu/sEF] [lb/cf1 [h.sf.FBtu[ 1056 Mtl Bldg Roof/R-19 Batt No No 0.05 1.34 9.49 20.3 ❑ Layer Material Material Thickness Framing No. 1111 Factor 1 94 BUILT-UP ROOFING, 3/81N 0.0313 0.000 ❑ 2 23 6 in. Insulation 0.5000 0.000 ❑ Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sf.Fl [Btu/sf.FI ]Ib/cfl [h.sEF1Btu1 1057 1 ft. soil, concrete floor, carpet and rubber No No 0.27 34.00 113.33 3.7 ❑ pad Layer Material Material Thickness Framing No. 1111 Factor 1 265 Soil, I ft 1.0000 0.000 ❑ 2 48 6 in. Heavyweight concrete 0.5000 0.000 ❑ 3 178 CARPET W/RUBBER PAD 0.000 ❑ 12/30/2010 EnergyGauge Summit® v3.22 No Name Simple Massless Conductance Heat Capacity Density RValue Construct Construct fBtu/h.sEFI [Btu/sf.F[ [Ib/cf[ [h.sf.F/Btul 1058 Solid core flush (2.25) No Yes 0.35 2.9 0 1 12/30/2010 Layer Material Material Thickness Framing No. IN Factor 1 279 Solid core flush (2.25") 0.000 EnergyGauge Summit© v3.22 Fw 7 0