Loading...
HomeMy WebLinkAboutENERGY EFFICIENCY CODE'Florida 'Energy, Efficiency .Code For 3dildlng Construction ' Florida Department: of'Conmunity Affairs EnergyGawge Summit®•Fla/06rn-2008,, Effective: March 1, 2009 -= Form 4Q0A-2008 Method A: Whole;Building Performance.Method for Commercial Buildings PROJECT SUMMARY SCANNED BY St. Lucie County Short Dese: Rio Arcade Description: Rio Arcade Owner: Poma Corp Addressl: Kitterman Road & US I City: St Lucie County Address2: State: FL Zip: 0 Type: Retail Class: New Finished building Jurisdiction: ST LUCIE COUNTY, ST LUCIE COUNTY, FL (661000) Conditioned Area: 8525 SF Conditioned & UnConditioned Area: 8525 SF No of Stories: 1 Area entered from Plans 0 SF Permit No: 0 Max Tonnage 32.5 If different, write in: N 80 82 ' s� AT OF ofi �ppSP181111O�A1 t171 ��y``` EnergyGauge Summit@ Fla/Com-2008. Effective: March 1, 2009 12/30/2010 Page I of Compliance Summary Component Design Criteria Result Gross Energy Cost (in $) 5,836.0 6,863.0 PASSED LIGHTING CONTROLS PASSES EXTERNAL LIGHTING None Entered HVAC SYSTEM PASSES PLANT None Entered WATER HEATING SYSTEMS PASSES PIPING SYSTEMS None Entered Met all required compliance from Check List? Yes/No/NA IMPORTANT MESSAGE Info 5009 -- -- -- An input report of this design building must be submitted along with this Compliance Report EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009 12/3012010 Page 2 of 7 CERTIFICATIONS I hereby certify that the plans and specifications covered by this calculation are in compliance with the Florida Energy Code ' Prepared By: Eric J. Svobodta, PE Building Official: Date: t r' �' Date: I certify that this building is in compliance with the FLorida Energy Efficiency Code Owner Agent: Date: If Required by Florida law, I hereby certify (*) that the system design is in compliance with the FLorida Energy Efficiency Code Architect: Reg No: Electrical Designer: Reg No: Lighting Designer: Reg No: Mechanical Designer: Reg No: Plumbing Designer: Reg No: (*) Signature is required where Florida Law requires design to be performed by registered design professionals. S EnergyGauge Summit@ Fla/Com-2008. Effective: March 1, 2009 - l2l30l2010 Page 3 of 7 Project: Rio Arcade Title: Rio Arcade Type: Retail Building End Uses 1) Proposed 2) Baseline Total 367.40 507.40 $5,836 $8,074 ELECTRICITY(MBtu/kWh/S) 367.40 507.40 107672 148701 $5,836 $8,074 AREA LIGHTS 104.50 124.70 30624 36551 $1,660 $1,985 MISC EQUIPMT 42.60 42.60 12490 12490 $677 $678 PUMPS & MISC 0.10 0.10 22 21 $1 $1 SPACE COOL 180.20 215.60 52799 63181 $2,862 $3,431 SPACE HEAT 10.30 17.20 3025 5042 $164 $274 VENT FANS 29.70 107.20 8712 31416 $472 $1,706 Passing requires Proposed Building cost to be at most 85% PASSES of Baseline cost. This Proposed Building is at 72.3% EnergyGauge Summit® Fla/Com•2008. Effective: March 1, 2009 ' 12/30/2010 Page 4 of 7 External Lighting Compliance Description Category Tradable? Allowance Area or Length ELPA CLP (W/Unit) or No. of Units (W) (W) (Sgft or ft) None Project: Rio Arcade Title: Rio Arcade Type: Retail (WEA File: FL_ST_LUCIE_CO_INTL.tm3) Lighting Controls Compliance Acronym Ashrae Description Area Design Min Compli- ID (sq.ft) CP CP ance PrOZolSpl 9,001 Playing Area 8,525 20 4 PASSES PASSES Project: Rio Arcade Title: Rio.Arcade Type: Retail (WEA File: FL_ST LUCIE CO INTL.tm3) _ System Report Compliance bPrOSy1 System 1 Constant Volume Packaged No. of Units System 1 Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria 1PLV Criteria liance Cooling System Air Conditioners Air Cooled 11.40 9.50 9.70 9.70 PASSES 240000 to 760000 Btu/h Cooling Capacity Heating System Electric Furnace 1.00 1.00 . PASSES Air Handling Air Handler (Supply) - 0.30 0.90 PASSES System -Supply Constant Volume Air Distribution ADS System 6.00 3.50 PASSES System PASSES EnergyGauge Summit@ Fla/Com-2008. Effective: March 1, 2009 12/30/2010 Page 5 of 7 Plant Compliance Description Installed No Size Design Min Design Min Category Comp Eff Eff IPLV IPLV fiance None Project: Rio Arcade Title: Rio Arcade Type: Retail (WEA File: FL ST LUCIE CO INTL.tm3) Water Heater Compliance D Description Type Design Min Category Eff Eff Design Max Comp Loss Loss liance Water Heater I Electric water heater <= 12 [kW] 0.92 0.89 PASSES PASSES Piping System Compliance Category Pipe Din Is Operating Ins Cond Ins Req Ins Compliance [inches[ Runout? Temp [Btu-in/hr Thick [in] Thick [in] ' IF] SF.F] None EnergyGauge Summit@ Fla/Com-2008. Effective: March 1, 2009 12/30/2010 Page 6 of 7 I: Rio Arcade Rio Arcade Retail File: FL_ST_LUCIE_CO_INTL.tm3) Category Section Report 13-101 Operations Manual 13-102.1, 13-410, 13-413 Windows & Doors 13-406.AB.1.1 Joints/Cracks 13-406.AB.1.2 Dropped Ceiling 13-406.AB.3 Cavity System 13-407 Reheat 13-407.13 HVAC Efficiency 13-407, 13-408 HVAC Controls 13-407.AB.2 Ventilation Controls 13-409.AB.3 ADS HVAC Ducts Balancing Piping Insulation Water Heaters Swimming Pools Hot Water Pipe Insulation Water Fixtures Motors Lighting Controls 13-410 13-410.AB 13-410.AB.4 13-41 LAB Other Required Compliance Requirement (write N/A in box if not applicable) Input Report Print -Out from EnergyGauge FlaCom attached Operations manual provided to owner Glazed swinging entrance & revolving doors: max. 1.0 cfin/ft'; all other products: 0.4 cfm/ft' To be caulked, gasketed, weather-stripped or otherwise sealed Vented: seal & insulated ceiling. Unvented seal & insulate roof & side walls HVAC Load sizing has been performed Electric resistance reheat prohibited Minimum efficiences: Cooling Tables 13-407.AB.3.2.I A-D; Heating Tables 13-407.AB.3.2. I B, 13-407.AB.3.2. I D, 13-408.AB.3.2. I E, 13-408.AB.3.2F Zone controls prevent reheat (exceptions); simultaneous heating and cooling in each zone; combined HAC deadband of at least 5°F (exceptions) Motorized dampers reqd, except gravity dampers OK in: 1) exhaust systems and 2) systems with design outside air intake or exhaust capacity5300 cfin Duct sizing and Design have been performed Air ducts, fittings, mechanical equipment & plenum chambers shall be mechanically attached, sealed, insulated & installed per Sec. 13-410 Air Distribution Systems HVAC distribution system(s) tested & balanced. Report in construction documents In accordance with Table 13-41 LAB.2 13-412.AB ' Performance requirements in accordance with Table 13-412.AB.3 Heat trap required 13-412.AB.2.6 Cover on heated swimming pools: Time switch (exceptions); Readily accessible on/off switch 13-411.AB.3 Table 13-41 I.AB.2 for circulating systems, first 8 feet of outlet pipe from storage tank and between inlet pipe and heat trap 13-412.AB.2.5 Shower hot water flow restricted to 2.5 gpm at 80 psi. Public lavatory fixture how water flow 0.5 gpm max; if self -closing valve 0.25 gallon recirculating, 0.5 gallon non recirculating 13-414 Motor efficiency criteria have been met 13-415.AB Automatic control required for interior lighting in buildings >5,000 s.f; Space control; Exterior photo sensor; Tandom wiring with 1 or 3 linear fluuorescent lamps>30W Check n e EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009 12/30/20I0 Page 7 of 7 Project Name: Rio Arcade Project Title: Rio Arcade Address: Kitterman Road & US 1 State: FL Zip: 0 Owner: Poma Corp EnergyGauge Summit® v3.22 INPUT DATA REPOP Proiect Information Orientation: East Building Type: Retail Building Classification: New Finished building No.of Stories: 1 GrossArea: 8525 SF Zones No Acronym Description Type Area Multiplier [sn Total Area lsn I PrOZoI Zone I CONDITIONED 8525.0 1 8525.0 ❑ Spaces No Acronym Description Type Depth IN Width Height Multi Total Area IN [ft[ plier [sfj Total Volume [cfJ 12/30/2010 EnergyGauge Summit® v3.22 In Zone: PrOZoI I POZoISpI ZoOSpI Playing Area 55.00 155.00 14.00 1 8525.0 119350.0 ❑ Lighting No Type Category No. of Watts per Power Control Type No.of Luminaires Luminsire [W[ Ctrl pts In Zone: PrOZol In Space: PrOZo1Sp1 1 Compact Fluorescent General Lighting 1 10000 10000 Manual On/Off 20 Walls No Description Type Width H (Ef ec) Multi Area DirectionConductance Heat Dens. R-Value [ft] [ft] plier ]sf] [Btu/hr. sf. F] Capacity [lb/cf] [h.sf.F/Btu[ " [Btu/sEF[ In Zone: Pr0Zo1 1 PrOZolWal 5/8"stucco 155.00 14.00 1 2170.0 East 0.2067 5.731 .34.65 4.8 ❑ /8"CMU/3/4"ISO BTWN24"oc/.5" Gyp 2 PrOZoI Wag 5/9" stucco 155.00 14.00 1 2170.0 West 0.2067 5.731 34.65 4.8 ❑ /8"CMU/3/4"ISO BTWN24"oc/.5" Gyp 3 PrOZolWa3 5/8" stucco 55.00 14.00 1 770.0 South 0.2067 5.731 34.65 4.8 ❑ /8"CMU/3/4"ISO BTWN24"oc/.5" Gyp Windows No Description Type Shaded U SHGC Vis.Tra W H (Effec) Multi Total Area [Btu/hr sf F[ IN [ft] plier [sf] 12/30/2010 EnergyGauge Summit@ v3.22 In Zone: PrOZol In Wall: East I PrOZolWalWil User Defined No 1.2500 0182 0.76 3.00 7.00 27 567.0 ❑ Doors No Description Type Shaded? Width H (Effec) Multi [ft] [ftl plier Area [sq Cond. Dens. Heat Cap. [Btu/hr. sf. FJ [Ib/cf] [Btu/sf. F] R-Value [b.sl:F/Btu] In Zone: PrOZQI In Wall: West I PrOZol Wa2Drl ,Solid core flush (2.25) No 3.00 7.00 3 21.0 0.3504 0.00 0.00 2.85 Roofs No Description Type Width [ft] H (Effec) Multi IN plier Area [sq Tilt [deg] Cond. Heat Cap Dens. [Btu/hr. St. F] [Btu/sf. F] [lb/cf] R-Value ]h.sf.FBtu] In Zone: PrOZoI I PrOZolRfl Mtl Bldg Roof/R- 19 Batt 155.00 50.00 1 7750.0 0.00 0.0492 1.34 9.49 20.3 ❑ Skylights No Description Type U SHGC Vis.Trans [Btu/hr sf F] W [ft] H (Effec) Multiplier Area IN [Sq Total Area [Sf] In Zone: In Roof: Floors No Description Type Width IN H (Effec) Multi [ftl plier Area [sfl Cond. Heat Cap. Dens. R-Value [Btu/hr. sil Fl [Btu/sf. FI [lb/cfl [h.sEFBtul 12/30/2010 EnergyGauge Summit@ v3:22 In Zone: PrOZol I PrOZOIFII I ft. soil, concrete floor, carpet and rubber pad 155.00 50.00 1 7750.0 0.2681 34.00 113.33 3.73 ❑ Systems bPrOSyl System 1 Constant Volume Packaged System No. Of Units 1 Component Category Capacity Efficiency IPLV I Cooling System 2 Heating System 3 Air Handling System -Supply 4 Air Distribution System 390009.00 230000.00 9400.00 11.40 9.70 1.00 0.30 6.00 ❑ ❑ ❑ Plant Equipment Category Size Inst.No Eff. IPLV Water Heaters W-Heater Description CapacitlCap.Unit I/P Rt. Efficiency Loss l Electric water heater 30 [Gal] 6 [kW] 0.9200 [En [Btu/h] ❑ Ext-Lighting Description Category No. of Watts per Area/Len/No. of units Control Type Wattage 11 Luminaires Luminaire [sf/ft/No] fW] 11 12/30/2010 EnergyGauge Summit® v3.22 rl ❑E Piping No Type Operating Insulation - Nomonal pipe Insulation Is Runout? Temperature Conductivity Diameter Thickness [F] [ Btu-in/h.sf.F] [in] [in] [ Name Glass Type ASHULSgICIrAt User Defined IFrm Fenestration Used No. of Glass SHGC VLT Panes Conductance [Btu/h.sf.F] 1 1.2500 0.8200 0.7600 W Materials Used Only R-Value RValue Thickness Conductivity Density SpecificHeat Mat No Acronym Description Used [h.sLF/Btu] [ft] [Btu/h.ftF] [Ib/cf] [Btu/Ib.F] 18/ MaI1187 UYFORFLAS No 0.0920 5u.ou 0.2000 Li BOARD, I/21N 178 Mat1178 CARPET W/RUBBER PAD Yes 1.2300 ❑ 265 Matl265 Soil, 1 ft No 2.0000 1.0000 0.5000 100.00 0.2000 ❑ 48 Matl48 6 in. Heavyweight concrete No 0.5000 0.5000 1.0000 140.00 0.2000 ❑ 268 Mat1268 0.625" stucco No O.1302 0.0521 0.4000 16.00 0.2000 ❑ 42 Mat142 8 in. Lightweight concrete No 2.0212 0.6670 0.3300 38.00 0.2000 ❑ block 269 Mat1269 .75" ISO BTWN24" oc No 2.2321 0.0625 0.0280 4.19 0.3000 ❑ 23 Mat123 6 in. Insulation No 20.0000 0.5000 0.0250 5.70 0.2000 ❑ 94 Mat194 BUILT-UP ROOFING, No 0.3366 0.0313 0.0930 70.00 0.3500 ❑ 3/81N 12/30/9010 EnergyGauge Summit® v3.22 5 3 Constructs Used Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sEF] - [Btu/sEF] llb/cfj 1h.sEFBtu1 1011 5/8" stucco /8"CMU/3/4"ISO No No 0.21 5.73 34.65 4.8 ❑ BTWN24"oc/.5" Gyp Layer Material Material Thickness Framing No. [ftl Factor 1 268 0.625" stucco 0.0521 0.000 ❑ 2 42 8 in. Lightweight concrete block 0.6670 0.000 ❑ 3 269 .75" ISO BTWN24" oc 0.0625 0.000 ❑ 4 187 GYP OR PLAS BOARD,1/21N 0.0417 0.000 ❑ Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sf.Fl [Btu/sEF] [lb/cf1 [h.sf.FBtu[ 1056 Mtl Bldg Roof/R-19 Batt No No 0.05 1.34 9.49 20.3 ❑ Layer Material Material Thickness Framing No. 1111 Factor 1 94 BUILT-UP ROOFING, 3/81N 0.0313 0.000 ❑ 2 23 6 in. Insulation 0.5000 0.000 ❑ Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sf.Fl [Btu/sf.FI ]Ib/cfl [h.sEF1Btu1 1057 1 ft. soil, concrete floor, carpet and rubber No No 0.27 34.00 113.33 3.7 ❑ pad Layer Material Material Thickness Framing No. 1111 Factor 1 265 Soil, I ft 1.0000 0.000 ❑ 2 48 6 in. Heavyweight concrete 0.5000 0.000 ❑ 3 178 CARPET W/RUBBER PAD 0.000 ❑ 12/30/2010 EnergyGauge Summit® v3.22 No Name Simple Massless Conductance Heat Capacity Density RValue Construct Construct fBtu/h.sEFI [Btu/sf.F[ [Ib/cf[ [h.sf.F/Btul 1058 Solid core flush (2.25) No Yes 0.35 2.9 0 1 12/30/2010 Layer Material Material Thickness Framing No. IN Factor 1 279 Solid core flush (2.25") 0.000 EnergyGauge Summit© v3.22 Fw 7 0