Loading...
HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATES_ --' Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave @ C�' Uy Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #: 1904-0583 JOB ADDRESS: 49 FLORIDA WAY PSL FL 34952 BUILDER/CONTRACTOR: RODNEY HALL CONCRETE PEST CONTROL CONTRACTOR: EVICT -A -BUG TERMITE& PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 SCANNED BY St. Lucie County We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: Percentage of solution:.05% Date of Treatment: xxxxx Footing xxxxxxx 1s` Treatment Re -Treat Driveway 1't Treatment Re -Treat Other 1st Treatment Re -Treat -2019 Chemicals used: DOMINION 2L Total gallons used: Time of Treatment: xxxxxx Slab xxxxxx 1st Treatment Re -Treat Pools 1st Treatment Re -Treat Perimeter for Final Inspection PAULCLUGARAJR Z' iowmue°oavn��p 7-3-2019 Signature of Exterminator Date Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistantjobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014 op OHrSf City of Port St. Lucie Building Department m 121 SW Port St. Lucie Blvd. Ftanio� Port St. Lucie, FL 34984 • 772-871-5132 Pandapublicweb. cityofpsl.com Certificate of Compliance for Termite Protection (as required by Florida Building Code PERMIT Permit #: 05F3 leI Address of Treatment Legal Description (Sec! PEST EVICT -A -BUG TERMITE $ PEST CONTROL INC. Company Name —Please Print 772-323-7921 Phone Number Method of Termite Prevention Treatment: PAUL C. LUGARA JR. License Holder Name JBI75775 License # Soil Barrier ❑ Wood Treatment El Bait System* ❑Other (describe) SCANNBC BY -Per FBC R318.1.7— a signed copy of the contract assuring the Jnstallatian, maintenance and monitoring of the baiting system that is in compliance with the requirements of Chapter 482, F.S. shall be provided to the Building to the pouring of the slab and the system must be Installed prior to final building approval. Official prior The Building has received a complete treatment for the prevention of subterranean termites. Treatment is in acc ce with .rules and la s established y the Florida Department of Agriculture and Consumer Services. authorize Signature 3 Print Name Farm created 02/25/2019 revised 04/19/19 tv