HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASE12-27-'19 10:57 FROM-
7728787656
fir, z. w�
ftT-337 P0001/0001 F-278
Putt Wtimbe :
�0 52?`U-
ICANNED
BY ' .
St. -.Lucie County
•'a111411i,
• n• •• • • a aaa! r• o e• •• '�•o� •i ~r a
• • tr a �a.,., • •. r r! „ • io • • • •
1. Thls Wnpormy pmer r4fe`ass is requested far the �vesta W ptm{rDse only, and tm wa1 }7e no
0P:b0arcV dfanY t OPlier than that permltlxd LV construction dtrrng this tiMe perlo'd.
Z. A5Widi tags py.our nve hecetiyy ag .fb a17f(de by and coriditions of ft agreemerit,
lnctudrrig. B iding DMsion PoAcy, which ie inoDr{ior h@reln by reference
3. Ali mnclitions:and retlUIMne 5 jl bM in tilt: att d-ed deaffneot entitled "Rwgremenisfor 30 Day
Power for Testing" h we'been firlfiilad-arid tree premise is ready for compr=ce.kMedtorL
4. All regrteStS for an otenslon b'eyprtd 30 daysmutt be made in wryang to the mdha AfHdal stabru
the reason' fbr the requesE_ Power maybe removed frvitr the site angor a Stop Wol Order LwWg
the Krrai YrnspeWOn has not been approved within 30'days. A ke'of $100.8'0 vvM be required to lift
the Stop Work'Order
1W HEREBYRELEASE-ANDAMM7) HOLD
AL- tl LirtEs, vp.ClAiN1soFANYTYM
jWII09RjI)'IjEtjIr. -.ei:. ' fiber
a0arl V-0