HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASEt
APR-04-2011 04:22 From:177PRA37540
04 Apr 2011 3:33 �:I ELECTRIC
r_.,. Pa9e:212
T� ,40-O5G❑ p.i
Planning & Development Services Department
Building & Code Regulations Division SCANNED
Zs00 viesinisAvenue
Ft Pierra.71, 34982 BY
Phunec 772_ 462-2I65
Fax: 772-462-:522 St. Lucie County
Request for 30-Day Temporary Power Release
Date: Permit Number.
"ect Address:
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO TILE
ABOVE DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR
THE PURPOSE. OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR FINAL
INSPECTION. IN CONSIDERATION OF APPROVAL OF THE REQUEST WE HEREBY
ACKNOWLEDGE AND AGREE AS FOLLOWS:
1. This temporary povmr refer is requested for the above slated purpose only, and there will be no occupancy
orany type, outer than that permitted by construction dining this time period.
2. As witness by our signatures, we hereby agree to abide by all terms and conditions of thin agreement, including
Building Division Policy, which is incorporated herein by neferenoa
3. All conditions and requirements listed in the attached document entitled "Begah'ements for 30 Day Power for
4. Testing" have been faiNled and the pmmLse is ready for compliance inspection.
S. Ali requests for an estemiun beyond 30 days most be made In writing to the Building Official stating the reason
for the request., Power may be removed from the site and/or a Stop Wank Order limed if the Final hrapeetion
has not been approved within 30 days. Ake of SIM00 will be required to llfl Hm Stop Work Order.
WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY, AND
THEIR EMPLOYEES FROM ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE
WHICH MAY ARISE NOW OR IN THE FUTURE OUT OF THIS TRANSACTION, INCLUDING
ANY DAMAGE WHIC14 MAY BE INCURRED DUE TO THE DISCONNECTION OF
ELECTRICAL POWER IN THEEVENT OF VIOLATION OF THIS AGREEMENT.
SLCP.DSn acvbed 00412019
APR 04 2011
Public yy
St.
Lucie conty uFL