Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutPLANSGulf Coast Supply and MFG 5v Crimp Metal roofing FL #II651.12
2L ga. 5v crimp metal roofing attached to plywood neck using #9 x 1.5"
wood screws with self sealing washer at 12' o.c. max spacing over ASTM D
(type 2) 30 lb felt meiderlagment installed with min. 4 side laps and V end
laps fastened with corrosion resistant tin caps and with 1.25" ring shank nails
aced La __at all Iaes_and two �staggered�rows 12* o.c. infield. Attach
12"
12"
5/8" thick fight textured
stucco on typical concrete
block construction
O'
Finish Columns with 5/8" thick x 8"w cut
5/8" thick cut coral coral finished stucco bands
finished stucco bands RIGHT G f� T ELEVATION
I I I SCALE: 1/4' - 1'-0'
Gulf Coast Supply and MFG 5v Crimp Metal roofing FL #11451.12
26 ga. 5v crimpp metal roofing attached to plgwood deck using #9 x 1.5'
wood screws unth self sealing washer at 12" o.c. max spacing over ASTM D
(tgpe 2) 30 lb felt underlagment Installed with min. 4 aide laps and L' and
laps fastened with corrosion resistant tin ceps and with 1.25" ring shank nails
spaced L o.c. at all laps and two staggered roue 12 o.c. in field. Attach
deck to trusses wing attachment deter on tlss sheet
12
4 1 SLOPE,
-0' - Finishe Floc
bvograq 001
Gulf Coast Supply and MPG 5v Crimp Metal roofing FL #11651.12
24 ga. 5v crimp metal roofing attached to plywood deck using #9 x 1.5'
wood screws with self sealing washer at 12' o.c. max spacing over ASTM D
(type 2) 30 lb felt underlayment metalled with min. 4 aide laps and L" and
laps fastened with corrosion resistant tin caps and with 1.25" ring shank nails
spaced 4" o.c. at all laps and two staggered rows 12" o.c. in field. Attach
deck to trusses using attachment detail on this sheet
Gf V 41111..0. b614 �VI u' sLucca on Lgpicam cancraT a
finished stucco bands block construction
REAR ELEVATION
04
S1
FI
/8" thick x 8"w cut
oral finished stucco bands
I I
O >N
NU
I E S:
SCALE: 1/4' -
1'-O'
- Overhangs at
1'-0"
unless otherwise noted
on Roof
Plan
- Roof pitch
at
4; 12 unless
otherwise noted
- A n g changes
t o this
plan shall b e submitted
t o the
architect
Gulf Coast Supplg and MFG 5v Crimp Metal roofing FL #II651.12
24 ge. camp metal attached to plywood clack using x 1.5"
12" ASTM
D
for approval In writing
pp g
prior to starting construction.
p g
aging
wood screws with self sealing washer at
raw* o.c. max spacing over
over
(type 2) ne 16 felt underlayment installed with min. 4 ads tape and L"
laps fastened with corrosion resistant tin and with 1.26"
and
- Return ALL Stucco
Bands Into Window or
Door.
caps ring shank nails
a aced L" o.c. at all laps and two staggered rows 12" o.c. in field. Attach
dock to trusses using attachment detail on this sheet
1/8" Thick
cut coral stucco over paper
backed wire
lath nailed to substrate through
one lager of
15 lb felt using 8d nails. Substrate
to be 19/32" CDX Plgwood nailed at L' o.c.
in field and
edges with IOd ring shank galvanmed
nails into truss webbing.
12
4
SLOPE
-i" T n R ter' 11 11 11 11 11 11 11 11 1
5/8" thick x 8% cut 5/8" thick x 8"w cut ®®® ® �,'�
3 coral finished stucco bands coral finished stucco bands ®® ® .: . LJ
3 5/8" thick x B"w cut
•. _ coral finished stucco bands
5/8" thick light textured
stucco on typical concrete A IN 'it 11111:004ow
block construction
i` Garage Finis F oor
= Finished — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — ,J o-4" A.F.F. 5/8" thick light textured Finish Columns with
0000000 stucco on typical concrete 5/8" thick cut coral
block construction finished stucco bands
LEFT ELEVATION FRONT ELEVATION
SCALE: 1/4' - 1'-0"
SCALE: I/4' - N-O`
2" x 4" top plate I ' 1/2" drywall ceiling on truss bottom cord
1/211 drywall on
x 4" studs at IL" o.c.
base -board 11 11 , 2` x 4" P.T. bottom plate
\ 4' concrete Bleb with fibermesh OR
OW #10/10 WWM on L mil Visqueen over
clean compacted termite treated fill
Interior Non -Bearing Partition
I-) nts
ALL CONTRACTOR WARRANTIES BEGIN WHEN THE CLOSING
OCCURS BETWEEN THE BUYER AND WYNNE BUILDING CORP.
AND WILL CONTINUE FOR ONE YEAR FROM THAT DATE
PERMITTING INFORMATION (FORM 100)
Florida Building Code Residential: Lth Edition and ASCE 1-10 for Wind Loading
Hu D~ me Enclosed Risk Ca . II Wind Velocrtg: I65 mph ultimate
'- '
Mean Roof eight: Rod Pmtct�4ay2
p
Internal Pressure Coefficient. }O_I8
Subjectabmlitg to damage from: Weathering: Ne d mble Termites: Vera Heave
Width of Rod End Zone: 3'-4• Wind Spee : mph ultimate
Wind Exposure Classification: C 1.21 X O.L - 0.12E
Adjustment factor for Exposure Height: ASO demo �I
Load Combination: ASCE 1-10 Section 2.4 DL+LL; DL+OAWL; OADL .6Wl1
Components t Cladding Wind Pressure (NET) Rod one: I. +30.L/-H.. per
Rod Zones 3. +20.V-84.0 PIK
psf
Components t Cladding Wall End Zone Width: '
Components t Cladding Wind Pressure (NET) one: 4. +35.8/-338.1 psiWeR
or I
Wall Zone: S. + 5.8/-f1.8 Pat
Za
Components t Cladding Wind Pressre (NET) an Garage Door: +32.0/-40.3pd
Shear Wall* Considered for Structure? yes
Continuous Load Path Provided?
Rod Zone 2
Wills Zone 5
Are Components an Cladding D Provided? Yes
END ZONE
Minimum Sal Dearing Preaure: si, Presumptive: X 13 Test psi
8EE RODUCT AP RO AL F tM A T P O E TION F R O E INGS
- Corner Zone
Rod Zane 3
ROOK LIVE LOAD:.3L pal" ROOF DEAD LOAD: 10 pal
FLOOR LIVE LOAD:.- od FLOOR DEAD LOAD.1g- pd
JOB ADDRESS:
Simpsaonn HaE�ThA 20 or equal
with (IO) IOGd x 11/2 C iID�
( 24" D.C.) suppportmg Max.
Ieiolbs upldt
Aluminum Drip ia
Edge ! Paacia
2" x 0 sub-Pascla
Kauai fut o writ ywwl soffit i
awsmayy ve' din shank x 15' Iona
reofmp nab with 3/8• ilia. heat
product aWoval -ewe chart si
5/8" thick light textured
stucco on typical concrete
block construction
#5 bar vert. w/
30' overlap
at each filled cel�
_IIII=IIII IIII
sl
FLOOR PLAN
TYPICAL NOTES: SCALE I/4" = 1'-O"
I. Contractor to veiI ALL notes and dimensions prior to
proceeding with work.
2. Contractor to STRICTLY enforce ALL OSHA Requirements.
3. ALL Lumber to be used as Beam, Rafters, etc... to have
a minimum 1,400 P.S.I. fiber stress.
4. No dissimilar metals to touch.
5. ALL Concrete used for slabs shall be min. 2.500 PSI concrete.
ALL Concrete used for vertical filled cells, cont. tie beams etc.. to
shall be 3,000 P.S.I, concrete and/or 4,000 P.S.I. grout mix
6. Drywall at ceilings shall be leveled and attached to bottom chord
of trusses with screws per FBC R102.3.5.
1. ALL wood in contact with concrete shall be pressure treated.
8. ALL wall dimensions are nominal and not finished wall or stud dimensions.
9. ALL plumbing fixtures to be low flow.
10. Contractor to Provide Drain at water heater in accordance
with the current edition of the Florida Plumbing Code.
11. Contractor to Provide a 2'-8" wide door at one bathroom for
handicap accessibility requirements.
12. Lowest finished floor to be set bg Governing Building Department
survegor to set in field.
13. Separation between residence and garage shall be per FBC R302.6
14. Door between garage and residence shall be 1-3/4"t 20 min. rated door
w.H• = Water Heater
15. Wall and Ceiling shall have a flame -spread classification of not greater than 200 per FB
16. Wall and ceiling finishes shall have a smoke -developed index of not greater than 450 per
11. All exposed attic insulation materials installed on attic floors shall have a critical radiant
flux not less than 0.12 watt per square centimeter. Exposed foam plastic insulation
materials exposed on the underside of the roof deck or on the attic walls shall comply
with F.B.C. R316 - see permit info box of code edition
IS. G( psum board material shall conform to ASTM CU, C-19, C415, C514, C630, C931
C960, C1002, C1041,0II-1, C1118, C1218, C1395, or C1396 and shall be installed
according to the following: (FBC R102.3.5)
Drywall
Thlckneas
Location
Orientation
Framing
Member
Max spacing
fasteners
Nall mzrn options for
g
installation drgwall into
Spacing
of
Nails
screws
Maximum
wood framing members
2' x min. thickness
Ceiling
Perpendcular
24'
1"
12,
13ga 13/8' long with 19/L4" head
0.048' diameter x 1 1/4' long
�211
annular -ringed or 5d cooler nail
OR
0.080" dia. xx 1 5/8" long with
Walla
Either
IL"
9"
IL"
Direction
15/L4" head
OR
Gypsum hoard nail 0.080 dra.
x 1 5/8" with 9/32" head.
Ceiling
Perpendicular
24"
'I"
12"
13ga 15/e" long with 19/L4" head
0.048' diameter x 1 3/8' long
„
annular -ringed or Ld coder nail
Walls
Either
IL"
8"
IL"
0.092" dia. xR 1 1/8" long with
Direction
I/4" head
OR
Gypsum board nail 0.0915' dra.
X 1 1/8' with 19/44' head.
CRASH POST DETAIL
N.Tr S.
34" high bg 4" diameter
steel crash post. Floor
Flange with 4 - 3/8"
expansion bolts into
slab (3/8"t 50 ksi steel plate)
V
46
2i5° 2 j"
m 0
IT 0 0
2 h" 2 h"
6"
C R302.9.1
FBC R302.9.2
1' x L" P.T. Buck
block with cane han
prior to door attacl
install SGD thru buck into
block with 3/IL" tap -con with
1 I/2" penetration at 6' o.c. max.
from each corner and 20.' o.c. max
thereafter at head per product approval
Use 3/I4" tap -con with
11/2' penetration at L' o.c. max
from each corner and 20" o.c. max
thereafter at sill per product apprc
19. ALL ceramic the surfaces installed shall conform to ASTM A108.1 thru A108.6,
A108.1, A118.1, A118.3, A136.1 and A131.1
20. Cement, fiber -cement or glass mat gypsum backers in accordance with ASTM
C1288, C1325, OR C11-18 and installed I.A.W. manufacturers recommendations shall
be used as backer for the wall the in tub areas and wall panels in shower areas.
21. Insulation including facings such as retarders or vapor permeable members installed
within floor -ceiling assemblies, roof -ceiling assemblies, wall, crawl spaces and attics
shall have a flame spread index not to exceed 25 with an accompanying smoke
developed index not to exceed 450 when tested in accordance with ASTM E 84.
Insulation shall comply With F.B.C. R316.
Gulf Coast Supply and MPG 5v Crimp Metal roofing FL #11651.12
2L ga. 5v crimp metal roofing attached to plywood deck using #9 x 1.5"
wood screws with self sealing washer at 12" o.c. max spacing over ASTM D
(type 2) 30 lb felt underla,ment installed with min. 4 side laps and L' and
laps fastened with corrosion resistant tin caps and with 1.25" ring shank nails
spaced L' o.c. at all laps and two staggered rows 12' c.c. In field. Attach
deck to trusses using attachment detail on this sheet \
Grade
12
4I PRE-ENGINEERED TRUSSES
at 24'o.c. TYPICAL
(shop drawings by manufacturer)
R-30 blown fiberglass
in bottom chord or trusses
1/2' drymall with smooth finish
Two rows of beam block filled with concrete
and (l) #5 bar cont. in each row. Substitute
precast lintel filled with concrete and (1) #5
bar cant. for bottom row over openings
1/2" drywall over 1" x Purringg
strips at IL" o.c. with R4.1 fr-Pal
insulation on typical 8" Block walls
All drywall to be installed per PBC R102.3.1
i and shall meet all penrn rtaig ASTM codes.
"
uo Mortar to be Type M a 1i proportioned per PBC R601.1
and Mortar Jonta shrill comp(, with FBC R4012.1.
Provide Dur-O-Rock at all wet areas (ex showers, tubs etc...)
Pill cell with concrete and
!U #5 bar Vert. (typical).
Max spacing shall not exceed
Wood 48" unless otherwise noted
Base we foundation plan notes for
spacing at opening*
4" concrete slab with fibermash OR
L"xL" #10/10 WWM on L mil Visqueen over
f 11 clean compacted termite treated fill
�.�'IIII. IIIIIIII,I��Ill
-III III --III
14" x 14" Concrete footing
l with (2) #5 bar* coot. and #5
transverse bars at 48• o.c.
TYPICAL SECTION
1/2" = 1'-O"
to Masonry Beam
nails
AREA CALCULATIONS
Living A/C = 1446 sq.
ft.
Front Porch = 141 sq.
ft.
Rear Porch = 200 sq.
ft.
Garage = 321 sq.
ft.
Total Under Roof= 2108 sq.
ft.
Total Cubic Ft = 11,548
2' VTR
X
I
I
I
21' VTR
J
Masterr��
Bath
1"V'
I
I
2•
Lev.
1
Y I 2' VTR
j
8�•
I I
sue. s• I
KIL amk 1
2•
Kitchen I
I
I
NTO
Bath
Septic
PLUMBING RISER
x V P.T. Buck nailed to
block with case hardened nails
Head prior to door attachment
fixed door ";;
sliding door _
al
rr
Masonry Walljq
L-
,.,
Bottom Trap
ypical Flooring
Sill
Install SGD thru buck into
block with tap -con with
Sliding
Door
D e t a 11
I I/2" penetration at L' o.c. max
from each corner and 20.' o.c.
max
thereafter at Jambs per product
approvalJamb
At Masonry Wall
NITS
Window Schedule
Mark
Size
Rou h O en.
Window Description
PRESSURE ZONE
I.
4'-5 Ya"x V-3 %"
54 i8"X 63i4'
Single Hung
ZONE 4
2.
V-2Ya"x 5'-3 ia"
15' x 1.3 %,"
Single Hung
ZONE 4
3.
'-2' x '-2 1/2"
21Y2"x 38%"
Single Hung
ZONE 4
4.
4'-$%"x 4'-2%" 1
54%"x 54Ya"
Single Hung
ZONE 4
ALL Windows to be aluminum windows w/ tint
and mullions per elevations.
ALL windows to withstand pressures in permit info box on sheet I
ALL windows in bathrooms to be tempered
All rough opening dimensions to be verified bg contractor
with manufacturer s specs prior to construction
Door Schedule
Mark
Size
Rough Opening
Door Description
PRESSURE ZONE
A
9'-O" X 1'-0'
108' x 84'
Overhead Garage Door
ZONE 4
B
3'-O' X L
41'/+"x 83%'
Fiberglass Pal - Irang
ZONE 4
C
L'-O" X L'-8'
�4' x 81 i2" �°'
Skiing Glass Door
ZONE 4
D
2'-O' X L'-8'
Solid Core - Wood - L-Panel -Bi-Fold Finished
24' x 81 h"
E
2'-6' X L'-8'
Solid Core - Wood - L-Panel
F
5'-0. X L'-a
Sohd Core - Wood - 6-Panel - Sr -Fold
G
2'-8' x V-8' x 1 %,"
Solid Core Wood. Steel. or Masoiite Door
H
2'-8e X V-8'
Sohd Core - Wood - L-Panel
J
2'-Le X C-am
Solid Core - Wood - L-Panel - Bi-Fold
K
X-8' X L'-8'
Solid Core - Wood - L-Panel - Bi-Fold
ALL Exterior doors to withstand pressures stated in permit info
box on sheet 41
GARAGE DOOR SPECIFIED IN PRODUCT APPROVAL FORM AND SHALL
WITHSTAND THE PRESSURES STATED IN PERMIT INFO BOX ON SHEET 41
All rough opening dimensions to be verified bg contractor
with manufacturers secs prior to construction
J[J��❑a[o � �'olL�1�CoIC ' �
N
I
MASTER
�= BEDROOM
8'-0" A.F.F.
b
EN H Flat Ceiling
C�
A/C
Meter
O
0
to Oe
ig Q- I N
CLO E I
I aC
12" x 12' Concrete column /
block filled with concrete and
(2) #1 bars vert. tied into
Imtels above
Covered Porch
8'-O" to19'-8" A.F.F.
Vaulteld Ceiling
GREAT
ROOM
I
:r
I
x L" knee -wall �%SJ-O" to 9'-8" A.F.F.
am counter top 'Ill-' I Vaulted Ceiling
I DINING
Rod E Shelf ROOM
4
SATH I
° \ i Vand+� to be
I 34 Y2' high
Hlgh Well
m KITCHE
0 -
i 8'-O" A.F.FL - - �verrhang - -
O N
-llkJ Flat Ceiling
10,
pper cabinet& to
I ext nd over Rol. D 3'-O
A.
r ®_
R-a rle-to
eel BallardI detail op tbia_a�� 1
IT' B I F w i
Provide auto Attic A iY p
I 1
doer L _ wit+r �_
22" - _ y
150 Amp 4"
P nel -o
e
n Ln
GARAGE E EGREr
O '-4" A.F.F. i
Flat Ceding °
r-----------------i
I Block wall in -
I garar to be
struck block
I I
I 1
I
I I
I A I
.°
9'-0"
15'-10"
Install windows thru buck into
block with 3/I6" tap -con with
1 1/2' penetration at V o.c. max
from each corner and 20." oc. max
thereafter at iambs and 20' ac. ma
Exterior face ax
t head and srper product approval
of wall / \ Buck to he r x 4' PT
1
1
BATH u
Rod t Shelfa
�1111118`0" A.F.F.
Flat Ceding
SECOND
r
BEDROOM n
0--
EGRESS
lit
en
I
in
N
i
O O
COVERED 12" x 12" concrete damn block filled
PORCH with con rate and (2) _1 bars wart. tie
tels vO O
into lineIn
3'-5" 2'-8.
5'-4°
3'-4"
Exterior two
4'-2" 5'-4"
-30
9'-L"
Attach buck to block wall with
1/4' dla. Elco conc screms with min.
1 1/4" penetration at 12" o.c. max
and 4' max from each corner thru
2" x L" PT Buck
I"x4" P.T. Buck nailed to INSTALL VULKEM BLOCK SEALANT #e Wood screws thru jamb into buck
lock with case hardened nails ON ALL JAMB, HEADER, AND at each hinge and 15' o.c. max and
Detail at W l n d ow S prior to window attachment SILL BLOCK PRIOR TO BUCK Detail at Door prior to door attachment
INSTALLATION
NTS NITS
Braden It Braden AIA, PA
Dunne Building Corp.
Date Drawn :
Revisions :
Sheet
Comm u
Architects - Planners
GARAGE
5-23-18
5-23-18 Smoke detector revision
coconut Avenue
T h e Grand C a r l ton
LEF
Drawn by:
2
12 - 2�
Tel(1_.
Tel (112) 281-8258
C.C.U.
Spanish Lakes
Fax : (112) 281-8283
E-mail: bradenaiascomcast.net
Checked by:
B
Stuart FL 34996 #AACDODD32
St. Lucie County Florida
D.R.B.
OF 5
r--17%!7 - — — — — —)
y I I\14`%� I tA1\1—%l— IX%./ I I_—�7"
I. ALL FOOTING ARE DESIGNED FOR A MINIMUM OF 2,500 PSF SOIL
BEARING CAPACITY. IF ANY SUB -SOIL, MUCK Oil NON -UNIFORM
CONDITIONS EXIST, REPORT TO ARCHITECT AND OBTAIN
PROPER ENGINEERING DATA FOR DESIGN.
2. ALL SLABS AND FOOTINGS TO BE A MiNiMUM 2.500 PSI AT 28 DAYS
ALL COLUMNS, FILLED CELLS, AND BEAMS SHALL BE MIN. 3000 PSI
BE 3000 PSI OR 4,000 PSI GROUT MIX AT 28 DAYS
3. POISON SOIL AND COVER W/ 6 MIL. VISQUEEN WITHIN 24 HOURS. NO
SOIL POISONING TO BE ACCOMPLISHED OUTSIDE OF FOUNDATION.
4 GROUND FLOOR SLAB TO BE A MINIMUM 4" THICK W/ 6X6 10/10
WELDED WIRE MESH REINFORCING ON 6 MIL. POLYETHYLENE VAPOR
BARRIER ON TERMITE TREATED, CLEAN MACHINE COMPACTED FILL
(MINIMUM 95% DENSITY). LAP POLYETHYLENE 12" MINIMUM. FIBERMESH
MIX MAY BE SUBSTITUTED FOR WELDED WIRE MESH.
5• LOT TO BE CLEARED OF ALL SMALL PLANT GROWTH AND DEBRIS
BEFORE FILL IS BROUGHT IN. FILL MATERIAL SHALL CONSIST OF
CLEAN GRANULAR SAND CONTAINING LESS THAN 10% MATERIAL
PASSING THE US STANDARD NO. 200 MESH SIEVE. PLACE
STRUCTURAL FILL IN LOOSE LAYERS OF 12" IN THICKNESS AND
COMPACT EACH LIFT TO AT LEAST 95% OF ITS MODIFIED DRY
PROCTOR VALUE.
6• GENERAL CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND
DIMENSIONS. BRING ANY DISCREPANCIES OR OMISSIONS TO THE
ATTENTION OF THE ARCHITECT.
-I. GARAGE FLOORS TO BE SMOOTH TROWEL FINISH (SLOPPED PER
FOUNDATION PLAN). PROVIDE 1-1/2" RECESS FOR OVERHEAD DOOR
8. SLOPE ALL PORCH SLABS, COVERED WALK, ETC. AWAY
FROM HOUSE TO DRAINS (IF PROVIDED) PER PLANS
9. DESIGN LOADS ARE AS FOLLOWS:
ROOF (DL+LL) = 41 PSF
WIND VELOCITY = PER PERMIT INFO BOX ON SHEET #I
EXPOSURE ="C"
10. ALL REINFORCING STEEL SHALL BE GRADE 40, MEETING ASTM A-16, t
A-35 SPECIFICATIONS. ALL ANCHOR TO BE A - 301 STEEL.
II. ALL DOWELS, SLEEVES, CONDUITS, INSERTS, BLOCKOUTS, ANCHOR
BOLTS AND FRAMES SHALL BE IN PLACE PRIOR TO POURING CONCRETE.
FOR OPENINGS AND SPECIAL FEATURES OMITTED ON THESE PLANS,
SEE ARCHITECTURAL OR MECHANICAL PLANS WHERE APPLICABLE.
12. MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS:
FOOTING: 3"
BEAMS: 1-1/2"
13. LAP ALL REINFORCING STEEL A MINIMUM OF 48 BAR DIAMETERS.
14. USE STRUCTURAL GRADE WOOD WITH A MINIMUM Fb OF 1600 PSI
IS. ALL STANDARD LUMBER SHALL BE SYP WITH A MINIMUM Fb OF 1000
PSI OF NO.2 SOUTHERN FINE, UNLESS NOTED OTHERWISE.
16. ALL LUMBER IN CONTACT WITH ANY CONCRETE OR MASONRY SHALL BE
PRESSURE TREATED. FASTENERS TO HAVE MIN. GI85 RATING.
FOUNDATiON
FLAN
I. Any
changes
to
plans must
be submitted to the architect SCALE: 1/4" = 1'-0"
for approval before proceeding with construction.
2. Contractor shall be responsible for verification of all Termite Protection for New
notation and dimensions before starting construction. Construction.
3. Soil conditions assumed to be 2500 psf. Should any other conditions be
encountered, the architect shall be notified in writing for revision Soil treatment used for subterranean termite prevention
Inside the foundation perimeter shall be done after all
4. Verify all recess thickness at showers, tile, etc.... excavation, backfilhng and compaction is complete.
5. Contractor to provide filled cell with concrete and 1 45 bar vert. at -48" If soil area is disturbed after initial chemical soil treatment
o.c. max. Provide (1) filled cell on each side of openings up to 5'-11" Wide, area shall be re -treated with a chemical sal treatment
Provide (2) filled cells on each side of openings from 6'-O" to 9'-11" including spaces boxed or framed.
and Provide (3) filled cells on each side of openings from 10'-O" and up Treatment must be in accordance with the rules and laws
Contractor to see plans for any other condition used. Foundation walls established by the Florida Department of Agriculture and
shall have filled cells at 2'f" o.c. unless otherwise noted (see section) consumer services.
Contractor to provide for Form Board Survey - Form Board Survey Protective sleeves around metallic piping penetrating
to be provided to Truss Company prior to truss construction concrete slab on grade floors shall not be of cellulose
1. Contractor to provide for soil test prior to construction and provide containing materials and shall receive application of
a copy of soil test t0 architect for review prior to construction termicide in annular space between sleeve and pipe.
8. ALL Reinforcing steel shall be grade 60, meeting ASTM A-l6 and
A-35 specifications. ALL Anchors to be A-301 steel.
9. Provide a minimum of 3" concrete protection at footings and
1-1/2" concrete protection at beams for ALL reinforcing bars.
#5 bar vert. w/ Thicken edge to 8"x8"
30" overlap ECTIEE ONS AL with concrete and '4" concrete slab with fibermesh OR
at each filled cell one #5 bar continuous Vxd" #10/10 WWM on 10 mil Visqueen over
\ clean compacted termite treated Pill
4" concrete slab with fibermesh OR tsicraua
6"xd' #10/10 WWM on 10 and Visqueen over
clean compacted termite treated fill 00
Grade I =1 I I =III �-
_ I i lil
ITI
_IIII III IIII_ '' 14% x 14"d concrete monolithic =f PORCH SLAB EDGE DETAIL
footing with (2) #5 bars coot. SCALE 1/2" = 1'-0
"
I #5 bar vert. w/
TYPICAL FOOTING DETAIL 30" overlap
SCALE 1/2" = 1'—O" at each filled cell EE TYPICAL
ECTIONS
4" concrete slab with fibermesh OR Ad, curb height
Cx6" #10/10 WWM on 10 mil Visqueen over based on gar. floor 4" concrete slab with fibermesh OR
clean compacted termite treated fill slope. VxV #10/10 WWM on 10 mil Visqueen over
#5 bar cont.
#5 bar, in curb clean compacted termite treated Pill
Stop per -
:..:. foundation plan Grade
T- — Tf1�I1T
10' (2) #5 bars cont. bottom steel F IIII iiii 14"w x 14"d concrete monolithic
footing with (2) #5 bars cost.
12"
14"
= 2 DETAIL AT GARAGE STEPDOWN
SCALE 1/2' = 1'-0" GARAGE CURB DETAIL
12' x 12' concrete cold=
bhxk rilled with concrete '
and (2) #1 bars vert. tied
into lintel& above
Top of rooter
V below finished Floor
1'. -s
Verify house slab
height in field
III, ,IIII,,, 111=
30"
COLUMN FOOTING DETAIL
30"x30"xld" concrete
column footing with (4)
45 bars each way
millivroh
2' x 6" PT wood secured with \
3/8'dia. x 6" anchor bolt at IS" o.c.
overhead door track secured to wood
jamb per manufacturer's product approval
Garage Door Jamb Detail
GARAGE DOOR TO WITHSTAND PRESSURES STATED NTS
PERMIT INFO BOX ON SHEET #i. SEE PRODUCT
APPROVAL FORM FOR MANUFACTURER MAKE AND MODEL.
Filled Cell Masonry Column With One
45 From Footing To Tie Beam
Cone. Fill To Be 3000 PSI
See Floor Plan For Location
�, ao
Single Filled Cell Column
NTS
Filled Cell Masonry Column With One
#5 From Footing To Beam Each.
Cone. Fill To Be 3000 PSi
See Floor Plan For Location
Double Filled Cell Column
NTS
Braden it Braden AIA, PA
Architects - Planners
411 S.E. Coconut Avenue
Tel : (112) 281-8258
Fax : (112) 281-8283
E-mail: bradenaiascomcast.net
(.�_ 14'-0° 1 -1--u l 1 20'-0"
PATIO/SLAB r _
--- T
IF - - - - - - 9 - - - - Ll
FI I
L
O
-Z
Filled cell under
girder above
I _J
24"
I
Rear Patio/Slab
I
r J
to
be poured separate
Prom the house slab.CL
LU
®I
I Thicken Footing to
U)
24'w x 14"d x 24"L I
I
FI under filled cell ° a
under order bearing. I °l IL!l 4 Z_ k\"\, L-.)F.l 1 11111E
m Rear Patio/Slab to
u U c I be flush with bottom of °
QD
sliding door recess. I I
Slope 1/2' I i -
° I I;-
I�-
I
I I._
I°
I°
32'-s"
H.B. I I
4" concrete slab with fiber ash OR I °
Cxd" #10/10 WWM on L mil V queen over
clean compacted termite tr ated fill I
a IQ I
n I I
I F-
- ID \ /
s I
I I
I
FI
H.B.
4'-0
" gL ° o LU
°
I❑
o A/C ° r— w------- w.H I I
#1 I 4'*w Steal Ballard FI
4 filled w/ Concrete 0
I I I
u I I I
I .n>'' I I
Z=m
SEE I Fl I °
° I 3vm I L— a I II po'' Io° ° of
II o
o 0
ry3a
° I uo
I 0rl;F51 �`— — — ----�
©a I ---T-T-T-T-
°
0#
IL I° "
I x
`s 14'-6" I O
V to
° L_ c Reen for __li ° �ry r
° ° __ Garage Boor ° ° --- °--------- °
"
Ila'
12" x 12" concrete column block fills,
with concrete and (2) #Z bars vart, ti
into lintels above
Wynne Building Corp.
The Grand Carlton
S anish Lakes
S . Lucie County Florida
ZOO
V ;0
ZOO
LL
FOOTING
SCHEDULE
MAI
sale
yam,
I
14"W
x 14"D
MONOLITHIC FOOTING
WITH
2 #5 BARS CONTINUOUS
12"W
X 12"D
MONOLITHIC FOOTING
WITH
(2) #5 BARS CONTINUOUS
30"
x 30" x IVD
COLUMN FOOTING WITH (4)
#5 BARS EACH WAY
8"W
x 8'D
THICKEN SLAB EDGE
WITH
1 #5 BAR CONTINUOUS
®HWWx
With
With
14'D
Curb at Geroge
MONOLITHIC FOOTING
WITH
2 #5 BARS CONTINUOUS - CURB a 0'-0"
Date Drawn Revision& :
GARAGE 5-23-18 5-23-18 Smoke detector revision
LEFT Drawn by:
C.C.U.
Checked by:
D.R.B.
Sheet —�
Comm #
12 2�
E3
OF 5
ROOF SHEETING
ATTACHMENT DETAIL
I. Minimum Nail Size = 8d ring shank (min. 2.5" long)
2. Minimum Screw Size = #8 x 2"
3. Minimum Sheathing Thickness 19/32" CDX Plgwood
4. Use nails or screws bas�don press re for r of stated
in permit in
box on these plans for zone
Ke
Area
Edge
Field
Fastener
Max.
Zone I
6
4
Bd ring shank
45 pef
Zone 2
4
6"
8d ring shank
16 par
Zone 3
8d ring shank
84 psf
** Zone 3a
6"
6"
48 wood screw
112.5 pef
** Use nails or s rews based on res$ure for r of stated
in permit Info �ox on these plans for zone
Concrete
/ Lintel
Column
Verify with Plan
Rebar L,48 Bar Dia.
Min. Overlap
Provide $5 bars with min. 40 bar
diameters overlap into beam. Tie
filled call suet into continuous
beam block steel
Provide Cast -Crete
SUS-OB/OT precast
lintel not in mortar
Min. 8' Bearing
12"x 12' \
lumn Block
Rebar
to Lintel A ttachmc nt
NTS
Provide a5 bar set in pre -cast
lintel into beam where length or
the opening calls for it.
Provide PT Buck
attached per jamb
etalb Into filled eel
cast
4" Sol
I• t. I
I il;I
i I
j
i
l 1
t
C
( l
I" .1
I IT
.1
Poured Filed Call
Provide 85 bars with min. 48 bar
iameters overlap in filled cell. Tie
Bled call steel into continuous
rooter steel.
;..: :}A. ,`r•';:.V' Concrete Footing
..:,:'' . .4.`_.` (see tooter schedule
�r , ...:-,-, -- .. r,: .. :� �: �:. � .. - for exact a:ea)
DETAIL AT WINDOW OPENING IN
CBS WALL Scale: 1/2" = 1'-0"
SINGLE PLY REAR GIRDER TRUSS
Nod 2' x 4' bl"L5 nto vwL leg of
truss with IOd x ails at 4' oc.
II Slatpson MGT into mall mom
dia. t. eade� set son. 12"
met beam an l IOd rolls into truss
TRUSS BLOCKING DETAIL
AT GIRDER STRAPPING
AT CENTER BEARING POINT
1/8' thick light textured stucco installed per
ASTM C 92L over ASTM D tgpe 2 paper backed
wire lath nailed to substrate through one lager of
ASTM D Type 2 felt paper using ed Hells. Substrate
to be 19/32' CDX Pggwood nailed at L o.c. in field
and edges with IOd ring shank nails into studs.
Gulf Coast Supplg and MFG 5v Crimp Metal roofing FL #1101.12
26 ga. Sv cramp metal roofing attached to plgwood sack using a9 x 1.5"
wood screws with self staling washer at 12" o.c. max spacing over ASTM D
(type 2) 30 lb felt underlagment installed with min. 4 ode laps and 0 and
laps fastened with corrosion resistant tin caps and with 1.25" ring shank nails
spaced 0 oIep .c. at all s and two staggered rows 12" o.c. in field. Attach
deck to trusses using attachment detail on this *heat
LINTEL SCHEDULE
Mark
Wior Woor rrt
a nail°stin
eewei
• Ab�►:ak
$°tom
8,s
I
Sire
Gravitill
PTt
ULMaed
L".s"t.rr
L22
2'-2"
V-L'
3F8-05/IT
I
s5
30Lq
50
1024
L31
,-i�;
41-W
!FS-Od/IT
1
a6
251111
IS4b
943
L49
4'-6'
6'-10'
Ma-OB/rr
1
$5
IW5
Wq
33q
L60
61-W
L'-L'
SFS-05/1r
1
$5
1238
835
121
LLO
L'-s'
T-L'
are-OD/IT
1
85
ton
121
634
LSO
a'-O'
T-4'
SFS-16/27
i
US
2
It
162
6q1
1 612
190
T-O'
W'-V
Sr8-15/2T
I
as
2
85
L43
530
401
LWIS
T-O'
W'-L'
WU-0/2T
ONE
1
a5
2
a5
533
nm3
401
LWO
W'-O'
n'-4'
SrS-B/2T
I
a5
2
$5
6S2
4q4
452
LWOl1
W'-0'
I W-4'
eFIL-Id/2T
ONE
1
25
1 2
86
13"
1020
452
1120
12'-0'
W-4'
MB-0/2T
1
si
2
a6
4 n
426
524
L1208
12'-O'
IS'-4'
Wit-11"T
ONE
1
a6
2
a6
1015
110
324
LHO
W-O'
W-4'
SFIL-10/.1T
ONE
1
$6
2
26
1260
LOq
25q
LILO
IL'-O'
n,-4'
Mro-116/2T
I
ai
2
$5
300
M2
M4
Lmoe
kt'-O'
PI1-4'
writ-MV2T
ONE
I
86
2
s6
q50
500
M4
- ALL LINTELS SHALL BE MADE BY CAST-CRETE.
- LINTELS SHALL BE FILLED SOLID WITH 3000 PSI CONCRETE
- REFER TO CAST-CRETE CATALOG FOR ALL INFORMATION REGARDING
LINTEL CONSTRUCTION, HANDLING INFORMATION, AND SAFE LOAD REQ.
REQUIREMENTS
- LINTELS OVER 14'-0' LONG ARE TO BE PRESTRESSED.
Sispson HETA 20 or equal
liar icerr��tt p char egch truss
wits (10) lad x 1 1/2 nmis —
( 24' o.c,) suppporting Max
18101bs. upldt
Aluminum Drip
Edge ! Fascia
12"
2' x L'
Kagemi fill o vent vmul start instilled
using 1/9' 6a shank x 5' long geiv.
roormg rocs mth 3/e' dia. head per
product approval -see chart shoat el
124 x 12' concrete column
block filled with concrete
and (2) 81 bars vart. tied
into lintels above
thicken edge to 8'x8"
with concrete and
one a5 bar continuous
BEYOND
Top of footer
IL' below finished floor
4
Aluminum Drip
Edge ! Fascia
Flash and Counter
flash
Nail ledger to
gable end truss
with (2) IOd da
at each met)
Brace Gable and
with 2" x 4" SYP a2
SR back nailed to bottom
or top chords using (2) IOd
nails at each truss
RE -ENGINEERED WOOD TRUSSES
O 24"o.c. TYPICAL
( shop drawings bg manufacturer )
I
0
a
�
X
Oq
N
Hp
oLL
a
_ 2
so
ti
Q°°
�
�
I
UJ
E:Mlc
Brace Gable and
with 2" x 4' SYP a2 mim
aft back nailed to bottom --
of top chords using (2) IOd
nails at each truss
Strap truss to wall
using Simpson MGT with
Simpson
HETA 20
5/8 dia,
threaded
rod loth min 12 embedment
hurricane anchor
at each truss
into beam
(22) IOd
truss leg
either wet set or in epoxy with
nails into truss. Add blocking to
per detail on this sheet
„
24 o.c.)
ETA 2
H0 1810
supporting Max.
lbs. udlift
N
W
tY
w
� X
� a
O q C
N
I-1Oan'
n
ti
°s,1000
E r a
(o m7 •i
�C4
s
N
111
All drywall to be installed per FBC R102.3.1
i and shall meet all pertaining ASTM codes. 'ETA 20
bo Mortar to be Type 'M' only proportioned Der FBC R601.I
and Mortar joints shall comply with FBC LO1.2.1.
Provide Dur-O-Rock at all wet areas (ex showers, tubs etc...)
FIII cell with concrete and (D ROOF FLAN
Max
a5aappbar vent. (tgpieaD.
48" unla anotherouse noted not eed
Wood see foundation plan notes ran
Base *pacing at opening* — OVERHANGS AT 1'-0" UNLESS OTHERWISE NOTED ON THIS SHEET
— ROOF PITCH AT 4:12 UNLESS OTHERWISE NOTED ON THIS SHEET
4" concrete slab with ribermesh OR L'xL° a10/10 WWM on 1. mil Yiaque— TRUSS SHOP DRAWINGS TO BE PROVIDED BY MANUFACTURER
sn over
It
`lean compacted termite treated rig — ANY CHANGES TO THIS PLAN SHALL BE SUBMITTED TO THE
ARCHITECT FOR APPROVAL IN WRITING PRIOR TO STARTING CONSTRUCTION.
1IIIIIIIIIII11 IIIIIIIIIIIIIIIIIIII�II �•�` '`� =IIII I IIII,;, IIII — ALL TRUSS TO TRUSS CONNECTIONS BY
;IIII=IIII-III ::; :: IIIIIIIIIIII=IIII=IIII-IIII—IIII—III III'— TRUSS MANUFACTURER
IIII—IIII=IIII -;. ,: IIII „IIII ARCHITECT REVIEW DRAWINGS
IGPRIOR
IIIIIIIIIIIIII114111 TO CONSTRUCTION FOR LAYOUT AND UPLIFT VERIFICATION
IIII-IIII `` Typical S�ctlon at Front Porch — CONTRACTOR TO PROVIDE FOR FORM BOARD SURVEY AND TO PROVIDE
'""111111i11i11
scale . 1/2" = I'—o" FORM BOARD SURVEY TO TRUSS COMPANY PRIOR TO TRUSS CONSTRUCTION
1/2'
voittiiail wood
w to
return printoevuN
� �: enetrwuon
5/8" thick light textured
stucco on typical concrete
block construction
Varies - see plan
a5 bar vert. w/
30' overlap
at each filled cell
Rear Patio/Slab to
be flush with bottom or
sliding door recess.
Step per foundation plan
Slope per foundation plan foundation�an M:
a
c N
,,R-30 blown fiberglass a Q
in bottom chord of trusses p �o
-1/2' drywall with smooth finish dp o W
Two rows of beam block filled with concrete
-and (1) #5 bar cont. in each row. Substitute
precast lintel filled with concrete and (1) a5 n
bar cunt. for bottom row over openings
1/2" drywall over 1" x furring
strips at IL' o.c. with R4.1 PI-foll
-insulation on typical 8' Block walls
WIN
WmAi
—9 .
_0
0 1 A
WA rAJ dN � I WAVA M"'
fil
I
Fir
WAIA FAA
WAA1
W1111111
PA MrA I I OA MFA SEA
I
AVAVA
19FA
79 ck to trusses ust:
' ig attachment dwetlli on 'this sheet
PW1
VA9
I OPTIONAL
PANEL
"A"
Pal"
SR
Lewd
Wre
Description
ewes
ere#
Desaiption
Wire
Load
SR
Pain
2
40
1.0 km
#8
A/C camp
1
2
AHU
s10
3.5 km
30
2
3
4
2
30
4.5 Its
sio
40 gaL Water HTR
5
L
R
#c
12.0 Its
6o
2
i
e
I
120
1 Le km
s12
Pump
9
10
Dr er
$10
5.0 Its
30
2
m
12
1
20
1.5 Its
#12
13
14
Dwlmmsher
s12
1.2 km
20
1
I
20
1.5 ke
#12
Mlcromove
15
14
Refrigerator
s12
1.2 km
20
1
I
20
1.5 ks
#12
Kitchen S.A.C.
n
18
Recepts
sl2
-
20
1
1
20
1.5 km
812
Kitchen S.A.C.
19
20
Recepts
812
-
20
1
1
20
L2 Its
812
Clothes Washer
21
22
Recepts
sls
-
20
1
1
20
0.81 km
so
Gorege Dow Opener
23
24
Recepts
$12
20
1
1
20
1.4 kw
#12
26
26
Recepts
212
20
1
1
20
1.12 km
$12
21
28
Recepts
$12
--
20
1
1
20
812
General Lighting
24
30
Rscspts
812
20
1
-
1
20
812
General Lighlam
31
32
Recepts
$12
-
20
1
-
1
20
812
General Lighting
33
34
Exterior GFCI
812
-
20
1
-
1
20
812
General Li&M
35
36
bathroom GFI
#12
--
20
1
-
I
120
$12
Smoke Dotectws
31
38
General Lighting
#12
20
1
-
I
20
812
1 Sathr ois GFI
31
40
General Lighting
012
20
1
1 -
8 are
41
42
spare
PANEL "A" LOAD CALCULATION SHEET
Load Description
Qt .
Watts
Total(Watta)
General Lighting (3_ Watts eg.. ft.) ......
Small Appliance, ,t,ircult(s> .. , ,
Rgngq...............
Refrigerator
Microwave.....................................................
Dish Washer.
�lothPd..IUesher...............................................
Garage.Door.Opener.....................................810
1135
3
5,205
2
1,500
3,000
1
12 000
12,000
1
1,200
1.200
I
1 500
1,500
1,200
1200
5.000
±1.,820000
4 00
1.800
Total Watts
31,415
First 10000 Watts e100%
1
10.000
10,000
Remainder 21,415 e40%
1
O
10,964
Electric Heat or A/C 10,000 915%
1
10,000
10.000
Calculated Load
Watts
30.9606
Voltage
240
Calculated Wattage Divided bg Voltage = Total Amps 124.03
Panel Size Required 150 Amps
Electrical S mbol Legend
S
Single Pole Switch
®
Recessed Can Light
Si
Doric Pole Switch
®
£ eball Recessed
e
Push Button Swatch
Exhaust Ran
=8
Duplex Outlet
¢
Calling Mounted Light
=0
Speelal Reeeptaclo
0-
Wei Mounted Light
aterpr gr circuit
Light with Pull Chian (attic)
®
Floor Duplex Outlet
Q
Computer Connection Jack
®
Carban MwwxWe Detector
W
Flood Light
Thermostat
®
Electrical Panel
®
Central Vac
8
Electrical Meter
®
Smoke Detector
Cokng fan
®
Televisiari Jack
©
Telephone Jack
Co;c
A/C Disconnect
®
I x 4 Florescent Light
®
2 x 4 Islaescent Light
®
Speaker Hook -Up
❑r
Intercom
®= JUNCTION BOX TO SUPPORT A FAN
'r sm THERMOSTAT LOCATION
B/A = BALANCED AIR
Electric Notes:
163 CPM
IOWOXG
MASTER
BEDROOM
IL3 CFM
IOxlOxi:
PATIO/SLAB
I
I
GAR IAT
ROM
I
I
r
r
a\ I
Center Roosters
10 CPM ion ceding fan I44 CFM
�L
- - -
�1
IOAO
I IOx1IOx1
S/A
CLOSE
H.B.
CF
6X X4M
I
I
I
I
I
8 x4
3 iBM
`�
I
YKgn_f�heu_--
DINING
Soffit
ATH
'�'
`•
I ROOM
'
I
�o•
I
L - - - - - - - -
I
1
193 CPM
12x12x1
"
0 Cie
I
N
I I
I it iiil I8 FM f'r-_
0
I
�� ATH
- - - 0
-
20�d0
T
1
1 -----
#1
_
22 • x 64•
F j I
I
iIL'
1tic Ammons
s'tmmtkt
�
l
I 2j2 Clem
- - - - -
I a
I XLxI
150 Amp
`
Meter
Panel
\`t SECOND
GARAGE'
i BEDROOM
I
IM
12id2x8
N
S/A
r----------------- i
I 1
I I
1 1
I I
1 I
I I
I I
I I
I I
I I
MECHANICAL LAYOUT
SCALE: 1/4" = 1'-0"
I. Use copper wire only, no aluminum. I1. It is not the intent of these plans to show every minor detail
2. Provide and wire all required smoke detectors. of construction. The contractor shall furnish and install
3. Contractor to verify location of electrical all items for a complete electrical system and provide all
service and provider. the requirements necessary for the equipment to be placed in
4. ALL paddle fans shall be on a rheostat. proper working order.
5. ALL bath and kitchen receptacles to be GFI protected. 18. All work shall be done in accordance with the N.E.C. and
L. ALL exterior outlets to be WP/GFI protected. shall comply with all local codes and ordinances, and shall
1. Recessed cans to be installed per NFPA requirements. meet all standard requirements of the local electric utility
8. AFCI receptacles are required in all rooms except and telephone company.
Kitchen, Bathrooms, and Garage.
9. A/C Return Air Balance Must comply w/ FBC RMIL02 19. The electrical system shall be completely and effectively
10. A/C Refri FQ'BVC g q bg lines that are run thru slabs must be
sleeved in rounded as required b the latest edition of the N.E.C.
If. ALL A/C Equipment shall comply with energy calculation 20. All material shall be new and shall bear underwriters'
12. All work shall be performed bg a licensed electrical labels where applicable.
contractor, the completed system shall be fullg operative.
13. Contractor shall pay for all -fees, permits, testing, and 21. All equipment and panel sizes shall be verified before
inspections including blower testing where required. ordering. The contractor shall provide circuit routings to
14. All p work shall be coordinated with other trades to avoid suit the job conditions.
interference with the progress of construction.
15. All required insurance shall be provided for protection 22. Furnish and install all fixtures as called for on the plans
against the public liability and property damage for the or as selected bg others.
duration of the work.
iL. Contractor shall guarantee all materials and workmanship 23. All raceways and pipes placed in or through any concrete
free of defects for a period of not less than two years from slab shall be spaced a minimum of three diameters of the
the date of acceptance or certificate of occupancy, or one largest conduit or pipe from any other service.
year from closing sale of house.
Correction of defects shall be completed without additional 24. All exposed wire below 9'-1" shall be installed in metal EMT
charge and shall include replacements or repair of any conduit.
other phase of installation that may have been damaged. 25. Dryer Vents to be installed per FBC RM1502
COVERED
PORCH
disc.
1
i50
#?/0 Aluminum feed AMC
1 A* Conduit _� PANEL
2" PVC l
2'
M
ELECTRICAL RiSER
- Contractor shall use AL-CU Landing lugs. NTS
- Contractor shall torque lugs I.A.W.
manufacturers recommendations which
shall be verified prior to construction
H.B.
Vent thru
soPrlt ----
Braden 4
Braden AIA, PA
Architects - Planners
-411
S.E. Coconut Avenue
Tel :
(112) 281-8258
Fax :
(112) 281-8283
E-mail:
bradenaiascomcast.net
Exhaust Duct
Thru Soffit
4" Exhaust
Duct Thru
Wall
Aor-
claritg
Install owle
under disc.
not shown
Q
A#/I C
Meter
0
I
w
OPTIONAL
PATIO/SLAB
,'Covered Pora%,
MASTER
BEDROOM wP GFCI ;
\ I
\ I
\\ S IH ITVI
I
- - - Smoke /Carbon "" 4AOM
T
Monoxide DetectorR
Combo
A/ I
I
iFCI
CLOSiE I © II
1 I II
;PcI
- I
DINING
GFC I I ROOM
1= FC
GFCI +"�
F FM
N A KITCHEN
„I t----- e
24 3'-2" 3'-2" C.M. Detector
R3141 FBC
GF C
42° GFCI If
W.H.
22*
Attic
Nth Wa
J
150 Amyl Ototional
Panel \ I penal loe.eaon
Pull chain
\ light in attic
42" GFCI
GARAGE
Garage
Door
---opener---
I I
I 1
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
ELECTRICAL PLAN
ov s-rry
1 F N
I
?G Cente i
-y\\SECO90-4
BFDROOM
/qp/\I
1 WP GFCI
\ i-' I FlaRCH / i
SCALE: 1/4" = 1'-011
Post Light with .,---� o
Attic Ventino Calculations FBC 2309.1
Total Attic Space = 2124 sq. ft.
Venting Ratio 1/150 = 14.14 sq, ft, required
Provide A Continuous Vented Soffit
W4nne Building Corp.
The Grand Carlton
Spanish Lakes
St. Lucie County Florida
Photo cep m
m4 G'-3"
0
I
n
Date Drawn Revisions :
GARAGE 5-23-18 5-23-I8 Smoke detector revision
LEFT Drawn by:
G.C.U.
Checked by:
D.R.B.
H.B.
Exhaust Duct
�Thru Soffit
m lU re For
Front Post
Light
Sheet Comm #
E-I 12-2�
B
OF 5
A=LIFE SAFETY WARNING
This symbol identifies Life Safety Warnings that should be read
given special attention by all persons installing trusses.
5PAGING NOTE
ALL TRUSSES ARE TO BE SET
AT 2'—O: ON CENTER
EXCEPT AS NOTED
MULTIPLE PLY TRUSSES MUST BE
ASTENED TOGETHER PER ENGINEERIN
BEFORE SETTING. REFER TO
ENGINEERING DRAWING TO DETERMINE
AL IF MULTIPLE PLY. A&
DON'T LIFT TRUSSES
WITH SPANS LONGER THAN
30' BY THE PEAK.
CONSULT BCSI
30' Span or less A 30' to 60' Span A
60 degrees Sprea er Bar
or less
41 112 —i
Tag Line span approx.
REFER TO BCSI
Truss must be set this way if crane used.
Truss is on example, your truss may not match,
nsist crane operator sets truss this way.
flag .4-- Approx 2/3 to
Line 1/2 of Span
REFER TO BCSI
iss must be set this way If crane used.
This Is an example, truss may not match.
Insist crane operator sets truss this way.
All load bearing walls, headers,
beams & lintels must be in place
at indicated height before trusses
are installed. A
A1lip "P."Ill LIll Ill " ill TIE=
UNLESS NOTED ELSEWHERE ON THIS LAYOUT, THESE TRUSSES
ARE NOT DESIGNED FOR AIR HANDLERS IN THE ROOF OR FOR
ANY OTHER A/C REQUIREMENTS. THIS MAY BE IN CONFLICT
WITH BUILDING CODE AND A/C DESIGN REQUIREMENTS.
CONSULT WITH BUILDING DEPARTMENT AND A/C CONTRACTOR.
LIREPRESENTS A HANGER
For Truss to Truss
Connections see
hanger/connector
schedule in engineering
package.
Carrying Ginter
Nails must be as
shown. Guide tabs c
Dome angle nails.
SEAT PLATES BY CHAMBERS
c'7
INDICATES LOAD BEARING WALL
REQUIRED BY TRUSSES
SUPPLIED BY BUILDER
AT A HEIGHT OF 8'-1"
ABOVE FINISHED FLOOR
12
4.00 __
upset=1/4" heel=315/16"
PLUMB CUT END
2 x 4 Top Chord
WALL HEIGHT it
TYPICAL END DETAIL
12
4.00 r—
m
io
12 2.00
co
upset=1/4" heel=315/16"
PLUMB CUT END
2 x 4 Top Chord
WALL HEIGHT ll
END DETAIL: A
A ARRANGE WITH CRANE OPERATOR IN ADVANCE FOR A SPREADER BAR OF 17' - 23' IN L=NGTH
A Do not stand on trusses until they are braced per BCSI & properly nailed to straps & hangers
"
GARAGE LEFT
The Archltect's or Architect's representative's
..shop drewlna Opprovai is NOT
GARAGE RIGHT
13 TRUSS DRAWINGS ARE ATTACHED TO LAYOUT
e
d
FABRICATION„ AGREEMENT
JSSES CANNOT BE STARTED UNTIL THIS AGREEMENT IS SIGNED & RETURNEI
legal description of the property where the trusses will be Installed is:
The undersigned acknowledges and agrees:
1. Trusses will be made In strict accordance with this truss placement diagram layol
which is the sole authority for determining successful fabrication of the trusses.
2. All dimensions In this layout have been verified by the undersigned.
3. Unless written notice is provided by certified mail to Chambers Truss within ten (1
days of delivery the undersigned agrees that no backcharges will be allowed. In the eve
such written notice is furnished Chambers Truss shall have three (3) business days in whit
to begin repairs required, or to substitute other trusses, at Chambers option.
4. The undersigned acknowledges receipt of "BCSI 1-03" summary sheet by TPI & WTCA
6. Delivery Is to Job site. It is the buyer's responsibility to make the Job site suitable f,
delivery. Chambers Truss has the sole authority to determine the suitability of the Job site or
Portion of the job site for delivery. Chambers Truss will be responsible for dump delivery onl,
The buyer is responsible for additional delivery expenses if Chambers Truss has to redeliv(
because job site is not prepared for delivery or buyer is not prepared for delivery of trussel
Buyer is responsible to Chambers Truss for towing costs due to site conditions,
6. Price as shown In paragraph 7 below is subject to change if any changes are made I
this layout. A $50 per hour fee for revisions may be charged by chambers Truss.
Chambers Truss of �the sum agreed to,
if n
agreement a reasonable price nORDERThis is a PURCHASE voicetwilll be made on delivery and paid within termsrof e on delivery. Invoice may be made at scheduled date of delivery If buyer cannot acre;
delivery of fabricated trusses. The undersigned agrees to pay Chambers Truss reasonabl
attorney's fee for collections in event of payment not timely made. 1-1/2 11 per month service
charge will be added for all sums not paid within terms.
8. Signature or initials anywhere on this sheet constitutes agreement to all terms herein.
9. In consideration of Chambers Truss extendng credit for this material the undersggnet
unconditionally guarantees payment when due of any and all indebtedness owed tt
Chambers Truss by any entity receiving material and the undersigned agrees to pay such
indebtedness Including attorneys fees, if default in payment for material be made by the
recipient.
10. In the event of any litigation concerning this agreement,the items fumished hereunder
)r payments referred to herein, the parties agree that the solex nue fbi`anysoch action will
)e Saint Lucie County, Florida.
11. Design responsibilities are per "National Standard And Recommended Guidelines On
Responsibilities For Construction Using Metal Plate Connected Wood Trusses4
\NSI/TPI/WTCA 4. 2002""
)ATED
iIGNED
:OR TITLE
Aspreader bar maybe required per "BC511-03" b prevent i jury & damage:
Multiple ply trusses must be fastened together pe R engineering
before they are set; failure to do so can result In roof collapse.
Temporary and permanent bracing are required and can save life !!
and property and is the responsibility of the truss erector.
Study the contents of the Information packet included on delivery,
before setting trusses.
_
Thaws must be set and braced perdesign bo prevent injury damage.
Trusses must be set plumb and square
Do not set bunks or stack of piywood, roofing material or any
other concentrated loads on trusses, this can cause collapse.
IDO NOT SET TRUSSES USING THIS LAYOUT
USE LAYOUT DELIVERED WITH TRUSSES TO SET TRUSSES I
CHAMBERS TRUSS INC
3105 Oleander Avenue
Fort Pierce, Florida-34982-6423
800=551=5 '
Fort Pierce 772465-2012 F i 772.465-8711
Vero Beach 772-569-2012 Stuart, e"'772-286-3302
_ Web Site CHAMBERSTRUSSCOM
LJCJtl71V UMI I CKIH --- --
County
SAINT LUCIE
Building Department
SAINT LUCIE COUNTY
Wind Design Criteria
ASCE 7-2010
Wind Design Method
MWFRS/C-C hybrid Wind ASCE 7-10
Roofing Material
Shingle or Shake
Loading in PSF
Roof R.D.L.
`9 1
Top Chord Live
20
c
Top Chord Dead
7 4.2
•o
I
Bottom Chord Live
10 Non -Concurrent
N w
Bottom Chord Dead
10 3
TOTAL Load
37 7.2
Duration Factor
1.25
o
Wind Speed
165mph
M
Top Chord C.B.
Sheeting by builder.
rn
Bottom Chord C.B.
Sheeting by builder.
Highest Mean Height
14'-0"
Building Type
ENCLOSED
Building Category
II:Non Restrictive
Exposure Category
C
Barrier Island
No
Conforms to FBC 2017
Verify DESIGN CRITERIA shown above with the
building department and your engineer.
Design Criteria is the responsibility of the
Chambers Truss Inc. Drawing Name: M11323
Scale: 1 /4 = 1'
72 total trusses, 13 different trusses.
MI 4: SAE ACAD: SAE Reviewed By:
Date:04/24/12 Revised:02/21/18
FOR
WYNNE BUILDING CORP.
DESCRIPTION:
62' GRAND CARLTON III 75�ag
PAGE 1 of 1 CUSTOMER INITIALS EACH PAGE
M 11323 gil �Jo
0
PANEL
"A" - - - - - - - -6,.
Poles
SR
Load
Wire
Description
circ#
mrc#
Description
Wire
Load
bsl:1`
1
20
1.2 kw
#12
Refrigerator
I
Range
#L
12.0 kw
s ;
1
20
1.2 Ice
#12
Clothes Washer
3
-
1
20
1.5 kw
#12
Kitchen S.A.C.
S
L
Dr a
#10
5.0 kw
3C4"' _'' 2
1
20
1.5 kw
912
Kitchen S.A.C.
8
1
20
#12
Bathroom Recrpt.
9
10
Au C sor
#10
5.0 kw
30,1111 2
1
20
1.2 kw
#12
Dishwasher
11
12
1
20
1.2 kw
#12
micrauevr
13
H
Air Hand
#10
5.0 kw
I
IS
#14
General Lighting
15
16
WH
I
IS
#14
General Lighting
IT
18
#10
5.0 kw
21,15 :;-2
1
IS
#14
General Lighting
19
20
I
IS
#H
General Lighting
21
22
GDO
#12
0.81 KOJ
20iiJ
1
IS
#14
General Lighting
23
24
Spare
Spare
25
26
Spare}
Spare
2'7
28
Spare
Spare
29
30
Spare
PANEL '_A" LOAD CALCULATION SHEET
_ Load Description
QtW.
Watts
Total(
General Lighting (3 watts sq. ft.)
Small, Appliance, Circuits) )
Range ..
Refrigerator ........................................ ..........
. .... .. ... .....
Dish Washer
Clothes .Washer. , , .
Clothes Dirge r.. , ,
Water Heater.
Garage Door Opener ... . .. .. .. ....
1135
3
5,2
3
2
I,500
I
12 000
12
1
1200
12
5
I,Microwave 00
15
1
1,200
12
1
1,200
12
5
1
6,000
1
4,500
Is
ell0
I
SO
Total Watts
36`
First 10000 Watts e100%
I
10,000
10
Remainder 25,415 e40%
I
O
IO
Electric Heat or A/C 10,000 945%
I
10,000
oAft
Calculated Load
Watte
30
Voltage
2
Calculated Wattage Divided by Voltage = Total Amps 12
Panel Size Required = 1540' •
I�ctrlcal S mbol Legend
S
Single Pole Switch
®
Recessed Can Light
Ss
Double Pole Switch
®
Eyeball Recessed
Pe
Push Button Switch
Exhaust Fan
�
Duplex Outlet
Ceiling Mounted Light i"
Special Receptacle
♦
Well Mounted Light 4 ,'7
.7.!�_=oof
ground fault circuit
ter
n
Light with Pull Chain (attic)
®
Floor Duplex Outlet
©
Computer Connection Jack
F-cm-1
Carbon Monoxide Detector
Flood Light
Thermostat
m
Electrical Panel
Q
Central Vac
g
Electrical Meter
(�
Smoke Detector
Coiling fan I
©
Television Jack
OTelephone
Jack
.mac
A/C Disconnect
®
1 x 4 Florescent Light
®
2 x 4 Florescent Light
svxa
Speaker Hook -Up
FB = JUNCTION BOX TO SUPPORT A FAN
TU = THERMOSTAT LOCATION t(
B/A =BALANCED AIR
FIELD VERIFY SERVICE LOCATION RESPECIVE TO PANEL LOCA
A/C disc.
42/0 AL
(3) 41 THHN Copper With 41 Gm
2" PVC Schedule
40 conduit 50 2" PVC S
40 conduit
AMP
CB into attic
PANEL AHU
200a rated 200a rater
meter can n meter can
Intersystem bonding
2" PVC ( FPL}- Termination pant 2" PVC
schedule 80 schedule
2" rigid service FPL 2" rig
GEC Bar�2)#8 tassel Wire
O' Gelvenaed
around rods
ELECTRICAL RISER I ALTEh
- Contractor shall use AL-CU Landing lugs. NITS
- Contras
- Contractor shall torque lugs I.A.W.
- Contrat
manufacturers recommendations which
manufacl
shall be verified prior to construction
shall be
- Verify AIC/KIC Rating prior to ordering equipment
- Verify
ELECTRIC
NOTES:
I.
Use copper wire onig From panel to devices
15. Cori
2.
Provide
and wire all required smoke t Carbon
free;
Monoxide detectors.
the.,
3.
Contractor to verify location of electrical
yeas''
service and provider.
Corn)
4.
ALL bath and kitchen receptacles to be GFCI protected.
thane
5.
ALL exterior outlets to be WP/GFCI protected.
other
L,
Recessed cans to be installed per NFPA requirements.
I(. It is
1.
Tamper resistant AFCI receptacles are required in
of c4
ALL rooms.
all Its
8.
A/C Return Air Balance Must comply w/ FBC RMIL02
the r
9.
A/C Refri lines that are run thru slabs must be
sleeved in r�gqrr��t
props,
10.
ALL A/C Equipment shall comply with energy calculation
11. All u
shall
11.
All work shall be performed by a licensed electrical
meet,
12,
contractor, the completed system shall be fully operative.
Contractor shall for all Tees, testing,
and t
pay permits, and
inspections including blower testing
where required,
18. The
13.
All
work shall be coordinated with other trades to avoid
interference with the progress of construction.
group
14.
All required insurance shall be provided for protection
19, All m
against the public liability and property damage for the
labels
-2-19
143 CFM
IOxIOX4
OPTIONAL
PATIO/SLAB
PATIO/SLAB
MASTER I
BEDROOM
GR IAT
ROM
10 CFM
IOxIOxL
12xl2x9
B/A
Center Registers
I49 CFM on ceiling fan I49 CFM
12x12x9 `-1 IOxIOx I \ IOxlOxl N
B/A �i N
H.B. CLOSE
CFM i#en I H.E
8x4x4 ex I
I I
- J
8x4X4 12ii I
3 CFM - \
Exhaust Duct
V�r_____ Thru Soffit
DINING
Soffit AATH
\ 1 \\ `\ ► ROOM
o \ \
101,
IN I
153 CFM
12xl2x1
° 4" Exhaust
H.B. Duct Thru
20 Cr- ii Wall
8x4x4 1� I R�ppA1 I FM _ _ _ ___Vent __thrU
Q I LC 6111� 8x SOr f It -- WP GF
_ _ T Install ouleA0rLQ
Q 20x2O A T H under disc.
T I not shown
clarity o
#I 1 a
F 22" x 54 1 I f fp1111
s II/n AiC
Attic Access O
with light_ I = i 232 CFM
L -
J Q I 12x4xl
Meter 150 Amp
Ir ' I- IL_J
1-2-19
AND USE APPROPRIATE RISER BELOW
A/C disc.
Cable I� y I
150
MCB
PANEL
bonding
pant
I'E
atoef2)#e'��pe�,alavenzied
ground rode
SERVICE ELECT. RISER
ti use AL-CU Landing lugs. NTS
G II torque lugs I.A.W.
commendations which
prior to construction
4 Rating prior to ordermq equipment
GARAGE
I
r-----------------i
I
I I
I
I 1
I 1
I I
I 1
I I
I I
I I
I
I I
COVERED
PORCH
SECOND
BEDROOM
I
j 12xl2x8
�1 B/A
MECH/4NIC/4L L,4Y0U7
SCALE: 1/4" = 1'-011
{�hall guarantee all materials and workmanship
20.
All equipment and panel sizes shall be verified before
Saw
'aO�,S i
acts ror a period of not less than two years from
acceptance or certificate of occupancy, or
P
ordering.The contractor shall
provide circuit routings to
i1
P y. one
licheing Bale OP h01186.
scat the fob conditions.
f
I`f defects shall be completed without additional
21.
Furnish and install all fixtures as called for on the plans
P
If„
hall include replacements or repair of any
or as selected b others,
y
of installation that may have been damaged.
Jy.
.)'1::
f intent of these plans to show every minor detail
22•
All raceways and pipes placed in or through any concrete
on, The contractor shall furnish and install
slab shall be spaced a minimum of three diameters of the
y 1
a complete electrical system and provide all
largest conduit or pipe from any other service.
fists necessary For the equipment to be placed in
I
order.
23.
All exposed wire below T-I" shall be installed inmetal EMT
dl be done in accordance with the N.E.C, and
conduit.
with all local codes and ordinances, and shall
24.
Dryer Vents to be installed
Braden t
Braden AI
FA
idard requirements of the local electric utility
per
FBC RM1502
r
it company.
Architects
- Planners
al system shall be completely and effectively
411
S.E. Coconut Ave
ue
required by the latest edition of the N.E.C.
Tel
: (112) 281-8258
shall be new and shall beer underwriters'
Fax
(112) 281-8283
applicable.
E-mail:
bradenaia5comcast.
et
Stuart. FL
349% 4AAC0,0
032
Meter
OPTIONAL
PATIO/SLAB
/Covered Porch`\
MASTER V Tv � �
BEDROOM WP GFCI 1 1
1 I
\ I
\ I
11 ITVI
I
- - - Smoke / Carbon G ' ` I ' ` T
i
Monoxide Detector R q O M
Combo
S I
I
GFCI /� I
16° \ I I TV � I
CLOSE I I II
I ,
GFCI I I I
I
DINING
- -`\ GFcI I I
ROOM
GFCI GFCI
I\ °
I� KITCHEN- - - - I C)
/24" I 3'�-2" 3'-2„ cHlnes F
/ oe M. pDe FBCr
R31y,4 I /
GFCI /
50 CFM
F N
+15 GFCNI/
C
92° GFc1 W.H. / Ro
r
I 22" x 54" 1" _ W
1 1 Attic Access O Cente ` \
with light/ Lt =E)
W `SECOND
H
150 Aink F tionalPanel panel location 1® TV B E D R O O M
Pull chain / \
\ light in attic
92" GFCI
GARAGE
II Garage / \
Door /
Opener
\
I 1 \
WP GFCI
I I
1 1 I I o �.. H r
r
ELECTfi�IC/4 L F L /4N
SCALE: 1/4" = I'-O"
Post LI lit with _vo C
Attic Ventinq Calculations FBC 2309.7
Total Attic Space = 2124 sq. ft.
Venting Ratio 1/150 = 14.16 sq: ft. required
Provide A Continuous Vented Soffit
Wi4nne Building Corp.
The Grand Carlton
Spanish Lakes
St. Lucie County Florida
Photo cell
v�
vu
u L'-3"
m
au
X
p
ox
W
I
W
na
(V
JFILF._
1
Date Drawn Revisions
GARAGE 3-21-18 5-23-18 Smoke detector revision
d�
LEFT Drawn by: G'd�R�601
C.C.U.
Checked by:
D.R.B. d M�orT�er?n�lrtitr A)�cv��
H.B.
Exhaust Duct
7hru Soffit
Wire For
Front Post
Light
JUL 2 4 2019
1 ST. Lucie County, Permitting
Sheet Comm #
�7- -1 12-2�
OF 5