Job Description: Remove existing roofing and install a CERTAINTEED roof system
FLAT ROOF:
• Provide roofing permit
• Provide trash removal to a legal off -site facility
• Remove existing roofing down to the wood deck
• Replace all bad decking (not to exceed #3 sheets)
• Re -nail deck as required by Hurricane Mitigation Retrofit Manuel (Based on 553.844 F.S.)
• Install ISO board with H72 fasteners and X insulation plates $
...................................
• Install CERTAINTEED FLINTLASTIC - SA NAIL BASE
• Install CERTAINTEED FLINTLASTIC — SA CAP SHEET
• Install new primed drip edge 3"x3" aluminum with MatrixTm 201 Premium SIBS Flashing Cement (COLOR
WHITE)
• Install new metal 16" - 26ga set in MatrixTm 201 Premium SBS Flashing Cement at sloop roof tie-in
TOTAL PRICE:12,500
_.................................
WIND MITIGATION:
Southeast General Contractors Group, Inc. will provide a Wind Mitigation Report for an additional fee of $175.00.
Not included:
Gutters
Metal fascia trim
Metal roof structures
Satellite dish removal or replacement
Screens and screen enclosures
Solar heater removal or replacement
Skylights
Truss repair
Priming and painting
Additional Items:
Plywood:
Fascia:
Second layer removal:
Chimney flashing:
Flashing, step, counter or base:
Gutter removal:
Rafter tail repairs:
Skylight replacement and flashing:
Stucco repair:
General Terms and Conditions
Cost $80.00 per sheet labor and material
Cost $18.80 I/f labor and material
Cost $28.00 per square
Cost $225.00 plus stucco if required at $37.50 per s/f
Cost $17.25 I/f labor and material
Cost $.50
Cost $120.00 each
Cost $475.00 each
Cost $37.50 per square foot
Change Orders, contractor may accept a "change order" to the plans, specifications or equipment. In addition,
the total price increased or decreased to reflect the change, and the same shall be in writing and signed by the
Owner and Contractor. Any increase to the contract price shall be paid by the Owner upon ordering the work
called for in such "change order" or upon execution of the change order as required by the contractor.
3. The Owner is responsible fc' nov )ersonal items, plants, vehicles, at m t ork area.
3. Existing gutters will be removed or uetached to allow for the installation oft a new roofing system. Contractor
will attempt to save the gutters however in the event they are damaged the Owner accepts full responsibility for
said gutters.
4. The Owner is responsible for the removal and re -installation of any satellite dishes. (The satellite dish may need
to be re -calibrated at Owners expense)
5. Customer authorizes the contractor and the material supply companies access to the property. Customer
accepts full responsibility for any unforeseen damage to the walks, driveway, septic tank and drain field,
landscaping etc. to the property except for the following:
.................................................................................................................................................................................
6: -Due to the rising cotin -labor and materials the Owner agree to alldw the Contractor to submit for additional
claims coverage to the Insurance Company. Any additional funds received by the Owner will be released to the
Contractor.
7. Labor Warranty 5 year on workmanship. Material Warranty 30-year limited warranty.
..........................................
Southeast General Contractors Group, Inc shall not be held responsible for damage caused by hurricanes,
tropical storms, tornadoes, earthquakes, fires, floods or other causes beyond the reasonable control of the
Contractor. Contractor cannot be held responsible for interior damages.
8. Same as Cash(SAC)Financing (3,6,12,18,24 months) options will require an additional upfront fee. Standard (1-
12) years financing is offered with no upfront fees. All financing is contingent upon credit approval. Standard
Home Improvement financing offered from 9.99% APR for A and A+ credit rating. Southeast General
Contractors Group Inc partners with EnerBank Improvement loans.
9. In the event there is a Home Owners Association, the Home Owner is responsible for notifying the Contractor
and assumes responsibility to get approvals the Home Owners Association. The Contractor will provide samples
if requested by the Home Owner.
10. Quoted price is a cash price which includes all rebates and discounts, an additional 3.5% convenience fee will
be added to payments made by credit card.
11. Entire Agreement - This Contract, from the time it shall take effect, shall supersede any and all prior
Agreements whether claimed to be oral or in writing. The parties have incorporated in this Contract their entire
understanding. No oral statement or prior written matter extrinsic to this Contract shall have any force or effect.
We hereby propose to furnish labor and materials complete in accordance with the above specifications, for the
sum of: $ 12,500 We are replacing 16 sheets of plywood on back roof
......................................................................................................................................................................
Schedule of Values:
Deposit: Is due upon executing this contract. $3,125
........................
Draw #1: Is due when the roof is dried -in, before shingles are delivered. $
........................
Draw #2: Is due upon the final inspection. $9,375
........................
All material is guaranteed to be as specified. All work to be completed in a workman like manner according to standard
practices. All agreements are contingent upon strikes, accidents or delays beyond our control. This proposal is subject to
acceptance within 10 days and is void thereafter at the option of Southeast General Contractors Group, Inc..
05/01/2019 04:14 PM
AUTHORIZED SIGNATURE
Date: 05/01/2019
SOUTHEAST GENERAL CONTRACTORS GROUP, INC.
ACCEPTANCE OF PROPOSAL
The above prices, specifications and conditions are hereby accepted. You are authorized to do the work as specified.
Payment will be made as outlined above.
Accepted:
4w:J - 4wPM O5/01/2019 04:15 PM
Signature Signature
Date: 05/01/2019 Date: 05/01/2019
PITCH
MEASUREMENTS
SQUARES
LINE MEASUREMENTS
Actual Squares*:
0.00 Sqs.
Eaves:
0 Ft.
Total Squares*
Rakes:
0 Ft.
(Inc. Waste at 10 %):
0.00 Sqs.
Ridges:
0 Ft.
* excludes low slope
Hips:
0 Ft.
Valleys:
0 Ft.
Low Slope:
10.21 Sqs.
Step:
0 Ft.
Wall:
140 Ft.
Pitch Change:
0 Ft.
CATEGORY MEASUREMENTS
PITCH MEASUREMENTS
Ice & Water Shield:
0 Ft.
Pitch 1112:
10.21 Sqs.
Ridge Vent:
0 Ft.
Rake Edge:
0 Ft.
Eave Edge:
0 Ft.
Step Flashing:
0 Ft.
0
Apron Flashing: 0 Ft.
Gutters: 0 Ft.
Gutter Toppers: 0 Ft.
Down Spouts: 0 Ft.