Loading...
HomeMy WebLinkAboutSOLAR POWER SYSTEM PLANSa DIRECTORY OF PAGES PV-1 PROJECT SUMMARY PV-2 SITE PLAN PW3 SINGLE -LINE DIAGRAM PVA SAFETY LABELS PV5.1 ATTACHMENT PLAN 5.1 PV5.2 ATTACHMENT PLAN5.2 PVS ATTACHMENT DETAILS Pv-7 not used MODULE DATASHEET X Z INVERTER DATASHEET z w MOUNTING SYSTEM DATASHEET QMOUNTING SYSTEM ENGINEERING LETTER PROJECT DETAILS PROPERTY OWNER DIVAN PROPERTYADDRESS 7203 S INDIAN RIVER DR, FORT PIERCE, FL 34982 US APN ZONING RESIDENTIAL USE AND OCCUPANCY CLASSIFICATION ONE -OR TWO-FAMILY DWELLING GROUP (GROUP R3) AHJ COUNTY OF ST. LUCIE UTILITY COMPANY FLORIDA POWER & LIGHT CO ELECTRICAL CODE 2014 NEC (NFPA 70) FIRE CODE 2015 NFPA 1 CONTRACTOR INFORMATION COMPANY Climatic Solar LICENSE NUMBER ADDRESS 650 2nd Ln Vero Bch, FL PHONE NUMBER 772-567-3104 CONTRACTOR SIGNATURE 1: -36psf 2:-66.9psf 3: -99.6 psf le rating is -78.4 psf and can be ed in roof zones 1 and 2 uu ST.LUCIE COUNTY PLAN REVIEW BLDG: DATE:ELE DATE-S" PLUMB: mwn: DATE: 1 PLOT PV-1 SCALE: NTS 2 LOCALE , I I I _ PV-1 SCALE: NTS n ' FILE Copy I SCOPE OF WORK I PHOTOVOLTAIC POWER SYSTEM. SOLAR PANELS WILL BE RACKED USING A PREENGINEERED RACIONG SYSTEM. THE RACKED MODULES WILL BE ELECTRICALLY CONNECTED WITH DC TO AC POWER INVERTERS AND INTERCONNECTED TO THE LOCAL UTILITY USING MEANS AND METHODS CONSISTENT WITH THE RULES ENFORCED BY THE LOCAL UTILITY AND PERMITTING JURISDICTION. USES 4 BOLT PLATES LAGGED THRU METAL ROOF INTO 518 PLYWOOD DECKING FOR STRUCTURAL ATTACHMENTS. CONNECTION WILL BE LINE SIDE TAP BY GENERAC BOX WITH 100A FUSED LOCKABLE AC 2 POLE DISCONNECT THIS DOCUMENT HAS BEEN PREPARED FOR THE PURPOSE OF DESCRIBING THE DESIGN OF A PROPOSED PV SYSTEM WITH ENOUGH DETAIL TO DEMONSTRATE COMPLIANCE WITH APPLICABLE CODES AND REGULATIONS. THE DOCUMENT SHALL NOT BE RELIED UPON AS A SUBSTITUTE FOR FOLLOWING MANUFACTURER INSTALLATION INSTRUCTIONS. THE SYSTEM SHALL COMPLY WITH ALL MANUFACTURERS LISTING AND INSTALLATION INSTRUCTIONS, AS WELL AS ALL APPLICABLE CODES. NOTHING IN THIS DOCUMENT SHALL BE INTERPRETED IN A WAY THAT OVERRIDES THEM. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL CONDITIONS, DIMENSIONS, AND DETAILS IN THIS DOCUMENT. SYSTEM DETAILS DESCRIPTION NEW GRID -INTERACTIVE PHOTOVOLTAIC SYSTEM WITH NO BATTERY STORAGE DC RATING OF SYSTEM 11,47OW AC RATING OF SYSTEM 8,880W AC OUTPUT CURRENT 37.OA INVERTER(S) 37 X ENPHASE IQ7-60-2-US MODULE MISSION SOLAR MSE310SQ8T ARRAY WIRING (1) BRANCH OF 131Q750-2-US MICROINVERTERS QBRANCH OF 121Q750-2-US CROINVERTERS SITE DETAILS ASHRAE EXTREME LOW O-C (32-F) ASHRAE 2%HIGH 33°C(91-F) CL!MATEDATA SOURCE VERO BEACH MUNICIPAL AIRPORT (KVRB) WIND SPEED 165 MPH (ASCE7-10) RISK CATEGORY II WIND EXPOSURE CATEGORY D P-112857 0 W I -- co N rn � M W E LL U Q of O z a N Cn H M If W_ N O f— ti n L Alger, P.E. # 74730 tificate of Authorization with: The LeverEdge Certificate # 31930 PV-1 GENERAL NOTES EQUIPMENT LIKELY TO BE WORKED UPON WHILE 1 ENERGIZED SHALL BE INSTALLED IN LOCATIONS THAT SATISFY MINIMUM WORKING CLEARANCES PER NEC 110.26. 2 CONTRACTOR SHALL USE ONLY COMPONENTS LISTED BY A NATIONALLY RECOGNIZED TESTING LABORATORY FOR THE INTENDED USE. CONTRACTOR IS RESPONSIBLE FOR FURNISHING ALL 3 EQUIPMENT, CABLES, ADDITIONAL CONDUITS, RACEWAYS, AND OTHER ACCESSORIES NECESSARY FOR A COMPLETE AND OPERATIONAL PV SYSTEM. 4 ALL EMT CONDUIT FITTINGS SHALL BE LISTED AS WEATHERPROOF FITTINGS AND INSTALLED TO ENSURE A RAINTIGHT FIT, PER NEC 358.42. SED ROOF -MOUNTED O (BLACK FORAME,BLACK AC S ESLOPED ET)P245'OAZIMUTH (U PROPOSED ROOF -MOUNTED PHOTOVOLTAIC O (BLACK FRAME, BLACK BAC SHEET)PDULES 153 'AZIMUTH 1 SITE PLAN PV-2 SCALE:1' = 20' P-112857 In L Alger, P.E. # 74730 tificate of horization with: ;LeverEdge tificate # SITE PLAN PV-2 PM1J7 + 3 �PVMODUIE // MICRO INVERTER / AA 1 121N 1131N Q3 BRAN�CH,, BRALNL..C...H..,, JB7-2 AC GEC BOXES PV SYSTEM DISCONNE MODULES REF. ptt. MAXEANDMCOEL AMA% PTC ISC IMP VW VMP TEMP. COEFF. OF VOC FUSERARNG PM13i 3/ IMMONSOARMSE31S9pBT 310W 285W 9.76A a 4a1V a 4.128VIC I-032%^0) 20A INVERTERS REF. i9al MAXEAND MODEL AC VOLTAGE GROUND MA%OCPO RATING RATED POWER MAXOU7PMCURRENT MANINFUi WTdREM MAXINFUTVWTAGE CEC WEGHTHt FFFlGEDY 113/ 3] ETPHASE Ip7018 240V UNGROUNDED 1 240W I 1.OA I 150A I /BV 1 97.0% PASS•THRU BOXES AND COMBINERS REF. ptt. RAT®L1IRRFM MPWAG1 JB2 1 Ge"W -TMAKEADM GEIERICC WB- 30A 0WVVGGE 2dOVAC/600VLIC JB7 1 24XCREOUIV. GENERIC GEtAWbi&2A%IXR EpUIV. I30A —2/WAC1600WC Cf 1 ETPHASE IDCOMBINER•OR EWN. 6M 240VAC SYSTEM SUMMARY BRANCH BRANCH BRANCH3 12 12 13 MRENT 12A 12A INA V��SPERBRPNCH U ZMW 2,WW 3,1M1W C POWER 11,470W CPOWER 10,s5OW LT0IEM NA OWEROUTPUT Ssm ACPOWEROUIPM 8.690W OCPDS RER ptt. RATED CURRENT MAN VOLTAGE CB1-2 2 15L 240VAC Cm 1 MIA 240VAC F1.2 2 1 SM I240VPL NOTES 0 THEDCM nCONNMTORSOFTNEUSMaPINSE107b62LSCONFORMTONX690.17(E)P.EWMMEMTHATINVERTERSUU.I.UDEDIXOMECTS FROM ALL SOURCES OF POWER. MICROINVEMEt BRUNCH CIRCUIT CONDUCTORBARE MANUFACTURED ENPHASE 0CABLES USTED FOR USE IN MIA OR LESS CIRCUITS OF ENPHASE IQ ZL MICROINVERTERS. THEY ARE ROHS, OIL RESISTANT, AND W RESISTANT. THEY CONTAIN TWO 12 AWG CONDUCTORS OFTYPE THHWTHWN-2 DRYANET AND C ERTIFlED TO ULM AND UL WU THE CABLES DOUBLE INSULATED RATING REQUIRES NO NEUTRAL OR GROUNDED CONDUCTOR. ® MAXDCVOLTAGEO WMWIILEISEXPECTMTOBE43MATOTWC-25'0)X41ffi✓D•40.12V=43.3V). PVSYSTEAIGSCONNECTS) MAKNIFE4IlAOETYPEDISCONNECTTMTISACOESSIBIEANDLMKAMEBYTHEUDUIY. ® POINT -OF -CONNECTION IS ON THE SUPPLY SIDE OF SE ACE DISCONNECT, INSIDE PANELSOARD ENCLOSURE USING UNUSED TERMINALS TERMINALS THAT ARE SUITABLE FOR DOUBLE LUGGING, OR USING OTHER LOCALLY -APPROVED METHODS AND HARDWARE, IN COMPLIANCE WITH NEC 70512(A). CONDUCTOR AND CONDUIT SCHEDULE W/ELECTRICAL CALCULATIONS TYPICALAL CONDUCTOR WNDUITI WEMCPRRYI RRNG CONDIICTORS WPO EW TEMP. WRR FILL COM. MPXCURRFNi BASE OHUTE) TERM. AMP.®TERN. IENIR VOLTAGE CABLE CONDNT/CABLE FACTOR FACTOR CURRENT (125%) M.P. AMP. TEMP.RATING TEND. RATNG DROP 1 1 12AWGTHWHI, aS DU EMT 2 ISA 12AWGTHWNlz 0.76(55•0) 1.0 12A 15A 30A 22SA 90'C 3]A SOFT 0.99% COPPER COPPER 2 1 12 ACOPPERi2, QS DU EMT 4 15A 12AWGTHWN-z oafi (55'G) 0.9 12A 15A 30A 1Sz4A 90•c 3].4 SOFT o.99% COPPER COPPER 3 1 12AWGTHWNz 0.0 DIA EMT 4 m 12AWGTNWN-z 0.76(55•C) 0b 13A 16.25A 30A UL24A VC 3M SOFT im% COPPER COPPER 4 1 4AWGTHWN4' VDIAEMT 2 WA SAWGTHWN$ 0.76(55'L) 1.0 NA 46YA 95A 722A 75-C am SOFT 0A6% COPPER COPPER 5 1 4AWGTHWWz- VDIAEMT 2 SOAX2 SAWGTHWN-2 B96(33'C) 1.0 37A 4625A 25A 91.2A 75T SSA 10FT 0.1% COPPER COPPER :onnection to be Tade in on the line ide of the venerator Transfer witch and the PV isconnect will be OOA rated with OA fuses, lockable ST.LUCIE couNTY PLAN REVIEW DATE: GENERAL ELECTRICAL NOTES UTILITY HAS 24-HR UNRESTRICTED ACCESS TO ALL 1 PHOTOVOLTAIC SYSTEM COMPONENTS LOCATED AT THE SERVICE ENTRANCE. 2 IMODULES CONFORM TO AND ARE LISTED UNDER UL 1703. CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS 3 SUNLIGHT RESISTANT PER NEC ARTICLE 300.6 (C) (1) AND ARTICLE 310.8 (D). CONDUCTORS EXPOSED TO WET LOCATIONS SHALL BE 4 SUITABLE FOR USE IN WET LOCATIONS PER NEC ARTICLE 310.8 (C). GROUNDING NOTES 1 ALL EQUIPMENT SHALL BE PROPERLY GROUNDED PER THE REQUIREMENTS OF NEC ARTICLES 250 8 690 PV MODULES SHALL BE GROUNDED TO MOUNTING RAILS USING MODULE LUGS OR RACKING INTEGRATED 2 GROUNDING CLAMPS AS ALLOWED BY LOCAL JURISDICTION. ALL OTHER EXPOSED METAL PARTS SHALL BE GROUNDED USING UL-LISTED LAY -IN LUGS. INSTALLER SHALL CONFIRM THAT MOUNTING SYSTEM HAS 3 BEEN EVALUATED FOR COMPLIANCE WITH UL 2703 'GROUNDING AND BONDING' WHEN USED WITH PROPOSED PV MODULE. 4 ALL GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FORTHEIRPURPOSE IF THE EXISTING MAIN SERVICE PANEL DOES NOT HAVE A 5 VERIFIABLE GROUNDING ELECTRODE, IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSTALL SUPPLEMENTAL GROUNDING ELECTRODE. AC SYSTEM GROUNDING ELECTRODE CONDUCTOR (GEC) 6 SHALL BE A MINIMUM SIZE #8AWG WHEN INSULATED, #6AWG IF BARE WIRE. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED 7 ACCORDING TO NEC ARTICLE 690A5, AND BE A MINIMUM OF #10AWG WHEN NOT EXPOSED TO DAMAGE, AND #6AWG SHALL BE USED WHEN EXPOSED TO DAMAGE GROUNDING AND BONDING CONDUCTORS, IF INSULATED, 8 SHALL BE COLOR CODED GREEN, OR MARKED GREEN IF #4AWG OR LARGER FILEC � SINGLE -LINE DIAGRAM Copy PV-3 SCALE: NTS IXISOOCUNBITHA3EE➢16RFA1ED FORMEFUPJAISEOFDE6tAB0.GMEDESCN OF/,PPOPOSFDiigiOI0.TACPO,YH16151EN WNHENOIKM [fTA6i0 UQpN31MTECOITLWYFWTMALLAPFLIVEtE W6ESA4DREdMIb19.ME00011EMSHgADN0I6E REIFDUPoN0.4A6UBSTITUIE fOR FOLLOAWGNVDFACMFA NSTAGAIpNMPNIMLS.Pa9TNIF11&WLpl6TALLNIEOIIPIffNIDOLCOAUANLE WIIHNAWFACIIptERNSTNIANN W1WN9.NOT0NI CTTH6D0006ENINgN➢BENIFAPPEIEDPAWAY THAT O4FARAMESME WSiRUCRONS W NMNFOLNPERDSTPLAipN MWUNb. P-112857 G W co Cl c LU `FcF LU W W m >*_ L U � Q W Z E: CID Cn W O of CD ngineering by: John L Alger, P.E. _ic # 74730 certificate of Authorization with: The LeverEdge Certificate # 31930 SINGLE -LINE DIAGRAM PROJECT ID: 112857 DATE: 05/02119 ,.CREATED BY: JA. CHECKED BY: f - REVISIONS PV-3 SW7 -DISCONNECT r - 112857 EATON DG222NRB O SEE NOTE N 4 (SW1) POINT -OF -INTERCONNECTION OR AT MAIN SERVICE DISCONNECT (MSP) 0000 tcAura ' • • • ! '• • PO'WERTO-#SSUtLD1NG IS..LSf1FROMR00.R30UNTED80LARRSRAYSWiTYiSAFETYDfSCONNECTS MSP - MAIN SERVICE PANELITH . , . ! • AS5114WN OO NEC690.56(C) AND IF T5.N.1 N „ ' OANY AC ELECTRICAL PANEL THAT IS FED BY LLI BOTH THE UTILITY AND THE PHOTOVOLTAIC I--' SYSTEM (SW7, MSP) - � CV ?j LL UJI > J NEC 705.12(D)(3) I+ i� t"+E' i� � ^�ff.... Z LU 4O AC DISCONNECT (SWi) LLI a- 00 C/) (— MAXIMUM AC OPERATING CURRENT: 37.0A - , ` :;. ':, 0 Mp 0 MAXIMUM AC OPERATING VOLTAGE: 240V "' ,-, `._� � LLJ CV I` LL NEC 690.54 NEC 690.56(B) OAC SOLAR DISCONNECT(SWI) Engineering by: John L Alger, P.E. Lic # 74730 PHOTOVOLTAIC AC DISCONNECT Certificate of Authorization with: NEC 690.13(B) - The LeverEdge Certificate # 31930 SAFETY LABELS DOC ID:112857-141718.1 = DATE:5/2119 '.CREATOR: J.A. REVIEWER: REVISIONS PV-4 LABELING NOTES 1 ALL PLAQUES AND SIGNAGE REQUIRED BY 2014 NEC AND 2015 NFPA 1 WILL BE INSTALLED AS REQUIRED. LABELS, WARNINGS AND MARKING SHALL COMPLY WITH ANSI Z535.4, W�ICH REQUIRES THAT DANGER, WARNING, AND CAUTION SIGNS USED THE STANDARD 2 HEADER COLORS, HEADER TEXT, AND SAFETY ALERT SYMBOL ON EACH LABEL THE ANSI STANDARD REQUIRES A HEADING THAT IS AT LEAST 50%TALLER THAN THE BODY TEXT, IN ACCORDANCE WITH NEC 110.21(B). A PERMANENT PLAQUE OR DIRECTORY SHALL BE 3 INSTA ROOF PROPERTIES P-11285700 Q RIDGE W RIDGE co y CV 6') W M 3: > LL. O E LL Q ��� Of go 25 Q LU z a C/i H M W w N O F- ti SAVE Modules installed only in roof zones 1 and Engineering by: 2 WIND ZONE I ❑ WIND ZONE II WIND ZONE III ❑ ❑ John L Alger, P.E. Lic # 74730 Certificate of Authorization with: 1 ATTACHMENT PLAN ORTHOGONAL PROJECTION The LeverEdge V5.1 SCALE:1/80 =1' Certificate # 31930 ATTACHMENT PLAN DOG ID,112857-141718-1 DATE, 512119 CREATOR: J.A. "REVIEWER: REVISIONS PV-5.1 ROOF MATERIAL TRAPEZOIDAL METAL (5-71N) SLOPE 3112 (14.0°) MEAN ROOF HEIGHT 22.8FT DECKSHEATHING 7/16'ORTHICKEROSBORPLYWOOD CONSTRUCTION TRUSSES (4X10TQP-CHORD), 241N OC MODULE MECHANICAL PROPERTIES MODEL MISSION SOLAR MSE310S08T DIMENSIONS (AREA) 65.51N X 39.31N X 7.SIN (17.9 SO FT) WEIGHT 40.1L8 MOUNTING SYSTEM PROPERTIES MAX MOUNT SPACING 48.OIN (ZONES 1, 2, AND 3) MAX. ALLOW. CANTILEVER 15.BIN (ZONES 1, 2, AND 3) GROUNDING AND BONDING TIN-PLATED, SOLID COPPER LAY -IN LUGS LISTED UNDER UL 2703 NOTES TRUSS LOCATIONS ARE APPROXIMATE. ACTUAL 1 LOCATIONS MAY DIFFER AND CONTRACTOR MAY NEED TO ADJUST MOUNT LOCATIONS. IN NO CASE SHALL THE MOUNT SPACING EXCEED'MAX MOUNT SPACING' Q RIDGE tiQ w LLl } m ,P L11 M Uj > LL EAVE x O �" Q U SAVE IY p z a WIND ZONE I WIND ZONE II WIND ZONE III m NOTES Lu N O TRUSS LOCATIONS ARE APPROXIMATE. ACTUAL F ~ 1 LOCATIONS MAY DIFFER AND CONTRACTOR MAY NEED 0 TO ADJUST MOUNT LOCATIONS. IN NO CASE SHALL THE 1 ATTACHMENT PLAN ORTHOGONAL PROJECTION MOUNT SPACING EXCEED'MAX MOUNT SPACING' fY V5. SCALE: 3116° =1' 0 Modules only installed in roof zones 1 and 2 Engineering by: John L Alger, P.E. Lic # 74730 Certificate of Authorization with: The LeverEdge Certificate # 31930 ATTACHMENT PLAN DOC 10:112857-141718-1 `F DATE: 512119 t:QVEATOR:J.A. REVISIONS J� Wjz 3 r �r ROOF PROPERTIES P-112857 ROOF MATERIA00 IX L TRAPEZOIDAL METAL (5-71N) SLOPE 3/12 (14.0°) MEAN ROOF HEIGHT 21.fiFT DECK SHEATHING 7/i6'ORTHICKEROSBORPLYWOOD CONSTRUCTION TRUSSES (4X70 TOP -CHORD), 241N OC MODULE MECHANICAL PROPERTIES MODEL MISSION SOLAR MSE310508T DIMENSIONS (AREA) 65.SIN X39.31N X1.61N (17.9 SO FT) WEIGHT 40.1LB MOUNTING SYSTEM PROPERTIES MAX MOUNT SPACING 48.OIN (ZONES 1, 2, AND 3) MAX' ALLOW. CANTILEVER 15.BIN (ZONES 1, 2, AND 3j GROUNDING AND BONDING TIN-PLATED, SOLID COPPER LAY -IN LUGS LISTED UNDER UL 2703 SNAPnRACK Series 100 (5V roof) For attachment Into truss or rafter Deck mounting Bracket (5V Roof) t (when attachment to truss is not possible For use in 5/S" thick minimum Plywood Uses 4gty k14 x V' SSlag screws Use Chem-Loc M1 sealer under bracket to seal against panel Pull off rated to 93 psf with 1.5 SF )tes on Fiashings and Atlactimems; 1 Contmctor is responsible for compliance with any and all local and Worst codes and equipment installation Instructions. 2 FIV modules are mounted to aluminum racking components and tells and attached to the roof using Quick Mount PV ➢ashings or other ➢ashinga and attachments approved by racking manufacturer as appropriate to the Installation. 3 Maximum span between attachments to be 46" or less. For the attachments on the ends of the retie oath side, the span can not exceed manufacturer's reoommendations. 4 Contractor Is responsible for ensuring watertight penetrations and for seating, trimming, cutting roof shingles and membranes in a neat, professional, and t) Using roof attachment locations drawn during system layout, drill a pilot hall through the roaring material.rto the roof homing 43 Attach L Foot to stud In Metal Roof Base cap. rwm.a sx 2) Attach the base with sliv, lag screw (or W selr-dalM'ng screw), drive lag screw for rnlnitnum 25' embMmont Into the roof fd 'me member. 3) Tlraed Metal Rcof Base Metal Roof Base bottom,, red IS fully seated to base. Nate: Protest is limited to 40psf when used with an equal number o1 PV dips in a 24 ga steel roof. See LeverEd a En ineedn for hl h r u Aft l ci �prm .va. ,y i•. 9 9 g a p oa . ea �... vfr S-SU and Min] ' Protest STANDING SEAM TRAPEZOIDAL Metal roofs are made by several manufacturers using several different styles from standing seam to 5V and others. S-5f makes clips for each particular roof style, It Is the contractors; responsibility to determine the particular brand and model of roof and select the proper 8-5 clip for their particular Installation. Check the S-51 web site at www.s-E.com. Installers can access the tools and procedures for proper installation of the clips at www.s-S.com tools. Proper Installation Is critical to achieve the rated pug and slide off values listed. s METAL HOOF ATTACHMENTS ss2saieesiymws. t�roa,ssosose maieveredge 1423 Gan Highway CMifiW tam ofAmdralonY: .. Otleasq FL 7Jas8 3f$30 �Bt}i0361g0 RBN taaa.ae� oennnroore. ,ev w.- lam ' :.. :_ .. sac e ra � ... 8-0p1 ,.. pr ( f 1 r� �rl��tr ;r ..r• P-112857 LL CN Ca DO LU co W co 7 -j Q � O W Z � W M LL' o O CA Lj— ti ATTACHMENT ' PV-6 CERTIFIED RELIABILITY , Tested to 3X IEC Standards SUPERIOR AESTHETICS )All -black design coupled with outstanding power output ) Ideal for residential & commercial applications EXTREME WEATHER RESILIENCE ) 5600 Pa snow load (117 psf) ) 175 mph wind rating BAA COMPLIANT FOR GOVERNMENT PROJECTS Buy American Act > American Recovery & Reinvestment Act •Anthem are diferom cedmcation reolrements in dfferent bare , please oontzRymv local Mission Solar Energy sales representall for the spedfic cemimstes applicable to the products In the region inwhirh the pmductsareto be used. MISSION SOLAR ENERGY This Module PERC 60 ELECTRICAL SPECIFICAf IONS Electrical Parameters at standard Test Conditions (STC) res �Modul�� .Type... _ _ Power Output _ Pmax Wp MSE300SQ8T 300 _ MSE3055QBf 305 MSE3105QBT, 310 IModule Efficiency % 18.05 18.35 18.65 9 Tolerance 0-+3% 0'+3% 0"+3% Short -Circuit Current Ise A 9.571 9.664 m 9.760_ Open ClmultVoltage Voc V 40.08 40.10 40.12 Rated Current Imp A 9.058 9.202 9.345 Rated Voltage Vmp V 33.12 33.14 33.17 Fuse Rating 35 20 20 • Normal Operating Cell Temperature(NOCT) 44-C(t2'C) Temperature Coefficient of Pmax -0.427%/°C Temperature Coefficient of Voc -0.318%/°C Temperature Coefficient of Ise 0.042%/°C Maximum System Voltage I,000VDC Operating Temperature Range -40°C(40°F)to+90°C(194°F) Maximum Series Fuse Rating 20A _ Rre Safety Classification Type 1, Class C Front& Back Load (UL standard) 5600 Pa(117 psf) Hall Safety lmpactVeloclty 25mm at 23 m/s Solarcells P-type Mono -crystalline Silicon (156.75mm) Cell orientation 60 cells (6x10), 5 busbar Module dimension 1664mmx999mmx40mm (65.51 In. x 39.33 in. x 1.57In.) Weight 18.2 kg(40.11N Front Glass t Frame 32mm(0.126 in.) tempered, Low_Irpn,.Anti_reflectiv-ecoating Anodized aluminum alloy Encapsulant Ethylene vinyl acetate(EVA) J-Box Protection class IP67 with 3 bypass -diodes Cables PVwire, im(39.37 in.), 4mm2/12 AWG Connector MC4 or compatible all] IN • Container FT Pallets Panels 305IN 53' Double stack 36 936 285.48 kW q0' Double stack 28 728 222.04 kW _ Panels Weight Height Width Length Pallet 26 _ 1,1601bs 45.15' 45.00" 66.00 Mission Solar Energy reserve the right to make specificaeen changes without nonce a 0 CLASS LEADING 300-31OW CERTIFICATIONS & TESTS IEC 61215 / 61730 161701, Salt mist —1 UL _ UL 1703 listed b�°' g„b CEC MSE310SQBT: 310WP, 60CELL SOLAR MODULE CURRENT -VOLTAGE CURVE a to Voltage M Current -voltage characteristics with dependence on irradlance and module temperature BASIC DESIGN (UNITS: ram) Front View BackVlew MISSION SOL/%R ENERGY Mission Solar Energy 19303 S. New Braunfels Ave., San Antonio. Tevas 76235 inlo@missiansolaemm l www.misslonsolaccom Date Sheet Enphase Microinverters Region: AMERICAS Enphase IQ 7 and IQ 7+ Microinverters UL To learn more about Enphase offerings, visit enphase.com The high-powered smart grid -ready Enphase IQ 7 Micro- and Enphase IQ 7+ Microu' dramatically simplify the installation process while achieving the highest system efficiency. Part of the Enphase IQ System, the IQ 7 and IQ 7+ Microinverters integrate with the Enphase IQ Envoy'", Enphase IQ Battery-, and the Enphase Enlighten- monitoring and analysis software. IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power -on testing, enabling Enphase to provide an industry -leading warranty of up to 25 years. Easy to Install Lightweight and simple Faster installation with improved, lighter two -wire cabling Built-in rapid shutdown compliant (NEC 2014 & 2017) Productive and Reliable Optimized for high powered 60-cell and 72-cell* modules More than a million hours of testing Class II double -insulated enclosure UL listed Smart Grid Ready Complies with advanced grid support, voltage and frequency ride -through requirements Remotely updates to respond to changing grid requirements Configurable for varying grid profiles Meets CA Rule 21 (UL 1741-SA) -The IQ 7. Micro is required to support 72-cell modules. ENPHASE. This inverter Enphase IQ 7 and IQ 7+ Microinverters INPUT DATA (DC) I117-60-2-US / IQ7-60-B-US IQ7PLUS-72-2-US / IQ7PLUS-72-6-US I Commonly used module pairings' - _ 235 W-350 W+. 235W-440W+ Module compatibility 50-cell PV modules only 60-cell and 72-call PV modules Maximum' input DCvbing_e 48V Peak power tracking voltage 27V-37V 27V-45V Operating range 16V-46V _ 16V-60V Min/Max start voltage 22V/48V 22 V 160V Max DCshortcircuiicurrent(module ls'c) 15A 15A overvoltage class DC port 11 It DCportbackfeedcurrent OA OA PV array configuration 1 x 1 ungrounded array; No additic AC side protection requires max ial DC side protection required; IA per branch circuit OUTPUT DATA (AC) IQ 7 Microlnverter IQ 7+ Microinverter Peak output power 250 VA 295VA Maximum continuous output power 240 VA 290 VA 1 Nominal (L,L) voltage/range' 0 V / 208 V/ 24211-264 V 183-229 V 24o V / 208V/ 211-264 V 163-229 V Maximum continuous output current 1.0 A(240 V) 1.15A(208 V) 1.21 A(240 V) 1.39 A(208 V) Nominal frequency 60 Hz 60 Hz Extended frequency range 47-68 Hz 47-68 Hz EE.-gortcircuit fa`uli current over3 cycles 5.8 Arms - 5.8 Arms Maximum units per 20 A (L-L) branch circuit' 16 (240 VAC) 13 (208 VAC) 13 (240 VAC) 11 (208 VAC) Overvoltage class AC port III AC port backfeed current 0 A 0 A Power factor setting 1.0 10 Power factor (adjustable) 0.85 leading ..: 0.85 lagging 0.85 leading... 0.85 lagging EFFICIENCY @240 V @208 V @240 V @208 V I Peak efficiency - 97.6 % 976 % 975 % 97.3 % CEC weighted efficiency 97.0 % 9Z0 % 97.0 % 97.0 % MECHANICALDATA PV2 to UTX: order ECA-S20-S25 rPollutiondegree PD3 _ I Enclosure Class II double -Insulated, corrosion resistant polymeric enclosure Environmental category/W exposure rating NEMA Type6/outdoor FEATURES .Monitoring Enlighten Manager ano Nlycnugmen monitoring options. Bnth notions reouire installation of an Enphase 10 Envoy. disconnect required by NEC 690. EEEI547, FCC Part 15 Class B, ICES-0003 Class B, 107.1-01 ;red as PV Rapid Shut Down Equipment and conforms with NEC-2014 and 0.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC ,hen installed accordina manufacturer's instructions. 1. No enforced DC/AC ratio. See the compatibility calculator at hne=uno�ha= gom/nas/suppo,umndule-oo oatihllity. 2. Nominal voltage range can be extended beyond nominal if required by the utility. 3. Limits may vary. Refer to local requirement. to define the number of microinverters per branch In your area. To learn more about Enphase offerings, visit enphase.com v EN P HAS E. 0201 a Enphase Energy. Al rights reserved. All trademarks or brands used are the property of Enphase Energy. Inc. 2018-11-19 SM 1 ►' 1 ®SOLARMOUNT :e°UNIRAC A HILTI GROUP GOPIPA W OPTIMIZED COMPONENTS INTEGRATED BONDING & PRE -ASSEMBLED PARTS Components are pre -assembled and optimized to reduce installation steps and save labor time. Our newgroundeg & herring process allocates copper vine and grounangstapsorhondinglumpersto reduce costs Utilize the alcmnlvertermount with aline management clip loran easier grstallatilm. VERSATILITY ONE PRODUCT - MANY APPLICATIONS Qpicklyset modules Hirsh to the tool Brat desired tilt angle. Change module orientation to portrail no landscape whilmcuring a Ialge vadelyof [famed modules on flat, liev sloped or ceep pitched roots. Available in mill; clear and dark anodized finishes to otdperformyour projects financial and aesfhelic aspirations: AUTOMATED DESIGN TOOL DESIGN PLATFORM AT YOUR SERVICE Creating bill of materials is just low clicks array with U-Builder, a powerful online toolthat streamlines the process ofdesigning a code comphanl solar mounting system Save time by creafilig a user Enable, and recall preferences and for ejects automatically when you log in. You MIT enjoy the ability to share prolecUrwlth customers: there's no need to printresNl[ssand send to a distr hntor. just click and share. N o UL2 / O3MQCTANIAL SYSTEM FIRE COLASSIFICATIQN INTEGRATED BONDING SPLICE BAR INTEGRATED BONDING MICROINVERTER MOUNT w/ WIRE MANAGEMENT INTEGRATED BONDING MIOCLAMP INTEGRATED BONDING L-FOOT wl T-BOLT J } UNIRAC CUSTOMER SERVICE MEANS THE HIGHEST LEVEL OF PRODUCT SUPPORT _err ON14ATCHED CERTIFIED [NGINFFRINC BANKABLE RESIGNRon PERldli EXPERIENCE QUALITY EXCELLENCE WARRANTY Tools -0oCUAIENTA(IDN GET OFF THE ROOF FASTER THAN EVER BEFORE TECHNICAL SUPPORT Cause's technical support team is dedicated to answering questions & addressing Issues in real time. Ail online library of documents .including engineering reports. .stamped letlem and technical data sheets gleally slmplities your permitting and project plaepng. process. CERTIFIED QUALITY PROVIDER Unime is Ilia only PV mounting vendor w1h ISO cont iicahons for 9001.,2008, 14001-2004 and UNSAS 18001:2007,: which means we deliver the Ifighesl standards for fit.: form, and function These certifications demonstrate our excelloncoand eenrmtmem to Msl class business practice& BANKABLE WARRANTY As a Ifild Group Company, Duane has the financial strength to back our products and reduce your risk [lave peace al mind own,"ung you are receiving products of exceptional reality. SOLARMOUNT Is covered by a 10 year limited Virtual warranty and a 5 year burned finish warranty, OPTIMIZED COMPONENTS • VERSATILITY • DESIGN TOOLS • QUALITY PROVIDER I PROTECT YOUR REPUTATION WITH QUALITY RACKING SOLUTIONS BACKED BY ENGINEERING EXCELLENCE AND A SUPERIOR SUPPLY CHAIN 'AE January 10, 2018 structural ENGINEERS UniRac 1411 Broadway Boulevard NE Albuquerque, New Mexico 87102-1545 TEL: (505) 242-6411 FAX: (505) 242-6412 Attn.: Engineering Department, Re: Engineering Certification for UniRaes SolarMount Design & Engineering Guide PZSE, Inc. -Structural Engineers has reviewed UniRaes "SolarMount Design & Engineering Guide" and specifically the enhancements of the SolarMount Flush -to -Roof System, Pressure Lookup Tables, and Downward & Upward Span Length Tables. This certification excludes connections to building structures and the effects on building structure components. All information, data and analysis contained within the Installation Manual are based on, and comply with the following: 1. 2015 International Building Code, by International Code Council, Inc., 2015 2. 2017 Florida Building Code 61h Edition. Florida Building Commission, 2017 3. ASCE/SEI 7-30 Minimum Design Loads for Buildings and other Structures 4. 2015 Aluminum Design Manual. by The Aluminum Association, 2015 This letter certifies that the structural calculations contained within UniRaes "SolarMount Design & Engineering Guide" are in compliance with the above Codes. If you have any questions on the above, donot hesitate to call. Prepared By: PZSE, Inc. —Structural Engineers Roseville, CA PAUL K. ZACHER, PE USING A SHA-1 AUTHENTICATION ED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED D AND SEALED AND THE SHA-1 AUTHENTICATION CODE BE VERIFIED ON ANY ELECTRONIC COPIES. 1478 Stone Point Driye, Suite.190; ,Roseville, CA 95661 t 916.961.3960 916.961.3965 W; w.ww.pzse.com Efip'erience II l6tegrity. I FMpawemn nt IINo.73522 01110/2018 MAY 0 7 2019 .]Ing