DIRECTORY OF PAGES
PV-1
PROJECT SUMMARY
PV-2
SITE PLAN
PW3
SINGLE -LINE DIAGRAM
PVA
SAFETY LABELS
PV5.1
ATTACHMENT PLAN 5.1
PV5.2
ATTACHMENT PLAN5.2
PVS
ATTACHMENT DETAILS
Pv-7
not used
MODULE DATASHEET
X
Z
INVERTER DATASHEET
z
w
MOUNTING SYSTEM DATASHEET
QMOUNTING SYSTEM ENGINEERING LETTER
PROJECT DETAILS
PROPERTY OWNER
DIVAN
PROPERTYADDRESS
7203 S INDIAN RIVER DR, FORT
PIERCE, FL 34982 US
APN
ZONING
RESIDENTIAL
USE AND OCCUPANCY
CLASSIFICATION
ONE -OR TWO-FAMILY DWELLING
GROUP (GROUP R3)
AHJ
COUNTY OF ST. LUCIE
UTILITY COMPANY
FLORIDA POWER & LIGHT CO
ELECTRICAL CODE
2014 NEC (NFPA 70)
FIRE CODE
2015 NFPA 1
CONTRACTOR INFORMATION
COMPANY
Climatic Solar
LICENSE NUMBER
ADDRESS
650 2nd Ln Vero Bch, FL
PHONE NUMBER
772-567-3104
CONTRACTOR
SIGNATURE
1: -36psf
2:-66.9psf
3: -99.6 psf
le rating is -78.4 psf and can be
ed in roof zones 1 and 2
uu
ST.LUCIE COUNTY
PLAN REVIEW
BLDG:
DATE:ELE
DATE-S"
PLUMB:
mwn:
DATE:
1 PLOT
PV-1 SCALE: NTS
2 LOCALE , I I I
_
PV-1 SCALE: NTS n '
FILE Copy
I SCOPE OF WORK I
PHOTOVOLTAIC POWER SYSTEM. SOLAR PANELS WILL BE
RACKED USING A PREENGINEERED RACIONG SYSTEM. THE
RACKED MODULES WILL BE ELECTRICALLY CONNECTED WITH
DC TO AC POWER INVERTERS AND INTERCONNECTED TO THE
LOCAL UTILITY USING MEANS AND METHODS CONSISTENT
WITH THE RULES ENFORCED BY THE LOCAL UTILITY AND
PERMITTING JURISDICTION. USES 4 BOLT PLATES LAGGED
THRU METAL ROOF INTO 518 PLYWOOD DECKING FOR
STRUCTURAL ATTACHMENTS. CONNECTION WILL BE LINE SIDE
TAP BY GENERAC BOX WITH 100A FUSED LOCKABLE AC 2 POLE
DISCONNECT
THIS DOCUMENT HAS BEEN PREPARED FOR THE PURPOSE OF
DESCRIBING THE DESIGN OF A PROPOSED PV SYSTEM WITH
ENOUGH DETAIL TO DEMONSTRATE COMPLIANCE WITH
APPLICABLE CODES AND REGULATIONS. THE DOCUMENT
SHALL NOT BE RELIED UPON AS A SUBSTITUTE FOR
FOLLOWING MANUFACTURER INSTALLATION INSTRUCTIONS.
THE SYSTEM SHALL COMPLY WITH ALL MANUFACTURERS
LISTING AND INSTALLATION INSTRUCTIONS, AS WELL AS ALL
APPLICABLE CODES. NOTHING IN THIS DOCUMENT SHALL BE
INTERPRETED IN A WAY THAT OVERRIDES THEM.
CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL
CONDITIONS, DIMENSIONS, AND DETAILS IN THIS DOCUMENT.
SYSTEM DETAILS
DESCRIPTION
NEW GRID -INTERACTIVE
PHOTOVOLTAIC SYSTEM WITH NO
BATTERY STORAGE
DC RATING OF SYSTEM
11,47OW
AC RATING OF SYSTEM
8,880W
AC OUTPUT CURRENT
37.OA
INVERTER(S)
37 X ENPHASE IQ7-60-2-US
MODULE
MISSION SOLAR MSE310SQ8T
ARRAY WIRING
(1) BRANCH OF 131Q750-2-US
MICROINVERTERS
QBRANCH OF 121Q750-2-US
CROINVERTERS
SITE
DETAILS
ASHRAE EXTREME LOW
O-C (32-F)
ASHRAE 2%HIGH
33°C(91-F)
CL!MATEDATA SOURCE
VERO BEACH MUNICIPAL AIRPORT
(KVRB)
WIND SPEED
165 MPH (ASCE7-10)
RISK CATEGORY
II
WIND EXPOSURE
CATEGORY
D
P-112857
0
W
I --
co
N
rn
�
M
W
E
LL
U
Q
of
O
z
a
N
Cn
H
M
If
W_
N
O
f—
ti
n L Alger, P.E.
# 74730
tificate of
Authorization with:
The LeverEdge
Certificate #
31930
PV-1
GENERAL NOTES
EQUIPMENT LIKELY TO BE WORKED UPON WHILE
1
ENERGIZED SHALL BE INSTALLED IN LOCATIONS THAT
SATISFY MINIMUM WORKING CLEARANCES PER NEC
110.26.
2
CONTRACTOR SHALL USE ONLY COMPONENTS LISTED
BY A NATIONALLY RECOGNIZED TESTING LABORATORY
FOR THE INTENDED USE.
CONTRACTOR IS RESPONSIBLE FOR FURNISHING ALL
3
EQUIPMENT, CABLES, ADDITIONAL CONDUITS,
RACEWAYS, AND OTHER ACCESSORIES NECESSARY
FOR A COMPLETE AND OPERATIONAL PV SYSTEM.
4
ALL EMT CONDUIT FITTINGS SHALL BE LISTED AS
WEATHERPROOF FITTINGS AND INSTALLED TO ENSURE
A RAINTIGHT FIT, PER NEC 358.42.
SED ROOF -MOUNTED
O (BLACK FORAME,BLACK AC S ESLOPED ET)P245'OAZIMUTH
(U PROPOSED ROOF -MOUNTED PHOTOVOLTAIC
O (BLACK FRAME, BLACK BAC SHEET)PDULES 153 'AZIMUTH
1 SITE PLAN
PV-2 SCALE:1' = 20'
P-112857
In L Alger, P.E.
# 74730
tificate of
horization with:
;LeverEdge
tificate #
SITE PLAN
PV-2
PM1J7
+ 3 �PVMODUIE
// MICRO
INVERTER
/ AA
1 121N 1131N Q3
BRAN�CH,, BRALNL..C...H..,,
JB7-2
AC
GEC
BOXES
PV SYSTEM
DISCONNE
MODULES
REF.
ptt.
MAXEANDMCOEL
AMA%
PTC
ISC
IMP
VW
VMP
TEMP. COEFF. OF VOC
FUSERARNG
PM13i
3/
IMMONSOARMSE31S9pBT
310W
285W
9.76A
a
4a1V
a
4.128VIC I-032%^0)
20A
INVERTERS
REF.
i9al
MAXEAND MODEL
AC VOLTAGE
GROUND
MA%OCPO RATING
RATED POWER MAXOU7PMCURRENT
MANINFUi WTdREM
MAXINFUTVWTAGE
CEC WEGHTHt FFFlGEDY
113/
3]
ETPHASE Ip7018
240V
UNGROUNDED
1 240W I 1.OA
I 150A
I /BV
1 97.0%
PASS•THRU BOXES AND COMBINERS
REF.
ptt.
RAT®L1IRRFM
MPWAG1
JB2
1
Ge"W -TMAKEADM
GEIERICC WB-
30A
0WVVGGE
2dOVAC/600VLIC
JB7
1
24XCREOUIV.
GENERIC GEtAWbi&2A%IXR EpUIV.
I30A
—2/WAC1600WC
Cf
1
ETPHASE IDCOMBINER•OR EWN.
6M
240VAC
SYSTEM
SUMMARY
BRANCH
BRANCH
BRANCH3
12
12
13
MRENT
12A
12A
INA
V��SPERBRPNCH
U
ZMW
2,WW
3,1M1W
C POWER
11,470W
CPOWER
10,s5OW
LT0IEM
NA
OWEROUTPUT
Ssm
ACPOWEROUIPM
8.690W
OCPDS
RER
ptt.
RATED CURRENT
MAN VOLTAGE
CB1-2
2
15L
240VAC
Cm
1
MIA
240VAC
F1.2
2
1 SM
I240VPL
NOTES
0 THEDCM nCONNMTORSOFTNEUSMaPINSE107b62LSCONFORMTONX690.17(E)P.EWMMEMTHATINVERTERSUU.I.UDEDIXOMECTS
FROM ALL SOURCES OF POWER.
MICROINVEMEt BRUNCH CIRCUIT CONDUCTORBARE MANUFACTURED ENPHASE 0CABLES USTED FOR USE IN MIA OR LESS CIRCUITS OF ENPHASE IQ
ZL MICROINVERTERS. THEY ARE ROHS, OIL RESISTANT, AND W RESISTANT. THEY CONTAIN TWO 12 AWG CONDUCTORS OFTYPE THHWTHWN-2 DRYANET AND
C ERTIFlED TO ULM AND UL WU THE CABLES DOUBLE INSULATED RATING REQUIRES NO NEUTRAL OR GROUNDED CONDUCTOR.
® MAXDCVOLTAGEO WMWIILEISEXPECTMTOBE43MATOTWC-25'0)X41ffi✓D•40.12V=43.3V).
PVSYSTEAIGSCONNECTS) MAKNIFE4IlAOETYPEDISCONNECTTMTISACOESSIBIEANDLMKAMEBYTHEUDUIY.
® POINT -OF -CONNECTION IS ON THE SUPPLY SIDE OF SE ACE DISCONNECT, INSIDE PANELSOARD ENCLOSURE USING UNUSED TERMINALS TERMINALS THAT
ARE SUITABLE FOR DOUBLE LUGGING, OR USING OTHER LOCALLY -APPROVED METHODS AND HARDWARE, IN COMPLIANCE WITH NEC 70512(A).
CONDUCTOR
AND CONDUIT
SCHEDULE W/ELECTRICAL
CALCULATIONS
TYPICALAL
CONDUCTOR
WNDUITI
WEMCPRRYI RRNG
CONDIICTORS
WPO
EW
TEMP. WRR
FILL
COM.
MPXCURRFNi
BASE
OHUTE)
TERM.
AMP.®TERN.
IENIR
VOLTAGE
CABLE
CONDNT/CABLE
FACTOR
FACTOR
CURRENT
(125%)
M.P.
AMP.
TEMP.RATING
TEND. RATNG
DROP
1 1
12AWGTHWHI,
aS DU EMT
2
ISA
12AWGTHWNlz
0.76(55•0)
1.0
12A
15A
30A
22SA
90'C
3]A
SOFT
0.99%
COPPER
COPPER
2 1
12 ACOPPERi2,
QS DU EMT
4
15A
12AWGTHWN-z
oafi (55'G)
0.9
12A
15A
30A
1Sz4A
90•c
3].4
SOFT
o.99%
COPPER
COPPER
3 1
12AWGTHWNz
0.0 DIA EMT
4
m
12AWGTNWN-z
0.76(55•C)
0b
13A
16.25A
30A
UL24A
VC
3M
SOFT
im%
COPPER
COPPER
4 1
4AWGTHWN4'
VDIAEMT
2
WA
SAWGTHWN$
0.76(55'L)
1.0
NA
46YA
95A
722A
75-C
am
SOFT
0A6%
COPPER
COPPER
5 1
4AWGTHWWz-
VDIAEMT
2
SOAX2
SAWGTHWN-2
B96(33'C)
1.0
37A
4625A
25A
91.2A
75T
SSA
10FT
0.1%
COPPER
COPPER
:onnection to be
Tade in on the line
ide of the
venerator Transfer
witch and the PV
isconnect will be
OOA rated with
OA fuses, lockable
ST.LUCIE couNTY
PLAN REVIEW
DATE:
GENERAL ELECTRICAL NOTES
UTILITY HAS 24-HR UNRESTRICTED ACCESS TO ALL
1
PHOTOVOLTAIC SYSTEM COMPONENTS LOCATED AT THE
SERVICE ENTRANCE.
2
IMODULES
CONFORM TO AND ARE LISTED UNDER UL 1703.
CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS
3
SUNLIGHT RESISTANT PER NEC ARTICLE 300.6 (C) (1) AND
ARTICLE 310.8 (D).
CONDUCTORS EXPOSED TO WET LOCATIONS SHALL BE
4
SUITABLE FOR USE IN WET LOCATIONS PER NEC ARTICLE
310.8 (C).
GROUNDING NOTES
1
ALL EQUIPMENT SHALL BE PROPERLY GROUNDED PER THE
REQUIREMENTS OF NEC ARTICLES 250 8 690
PV MODULES SHALL BE GROUNDED TO MOUNTING RAILS
USING MODULE LUGS OR RACKING INTEGRATED
2
GROUNDING CLAMPS AS ALLOWED BY LOCAL JURISDICTION.
ALL OTHER EXPOSED METAL PARTS SHALL BE GROUNDED
USING UL-LISTED LAY -IN LUGS.
INSTALLER SHALL CONFIRM THAT MOUNTING SYSTEM HAS
3
BEEN EVALUATED FOR COMPLIANCE WITH UL 2703
'GROUNDING AND BONDING' WHEN USED WITH PROPOSED
PV MODULE.
4
ALL GROUNDING SYSTEM COMPONENTS SHALL BE LISTED
FORTHEIRPURPOSE
IF THE EXISTING MAIN SERVICE PANEL DOES NOT HAVE A
5
VERIFIABLE GROUNDING ELECTRODE, IT IS THE
CONTRACTOR'S RESPONSIBILITY TO INSTALL
SUPPLEMENTAL GROUNDING ELECTRODE.
AC SYSTEM GROUNDING ELECTRODE CONDUCTOR (GEC)
6
SHALL BE A MINIMUM SIZE #8AWG WHEN INSULATED, #6AWG
IF BARE WIRE.
EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED
7
ACCORDING TO NEC ARTICLE 690A5, AND BE A MINIMUM OF
#10AWG WHEN NOT EXPOSED TO DAMAGE, AND #6AWG
SHALL BE USED WHEN EXPOSED TO DAMAGE
GROUNDING AND BONDING CONDUCTORS, IF INSULATED,
8
SHALL BE COLOR CODED GREEN, OR MARKED GREEN IF
#4AWG OR LARGER
FILEC � SINGLE -LINE DIAGRAM
Copy PV-3 SCALE: NTS
IXISOOCUNBITHA3EE➢16RFA1ED FORMEFUPJAISEOFDE6tAB0.GMEDESCN OF/,PPOPOSFDiigiOI0.TACPO,YH16151EN WNHENOIKM [fTA6i0 UQpN31MTECOITLWYFWTMALLAPFLIVEtE W6ESA4DREdMIb19.ME00011EMSHgADN0I6E REIFDUPoN0.4A6UBSTITUIE fOR
FOLLOAWGNVDFACMFA NSTAGAIpNMPNIMLS.Pa9TNIF11&WLpl6TALLNIEOIIPIffNIDOLCOAUANLE WIIHNAWFACIIptERNSTNIANN W1WN9.NOT0NI CTTH6D0006ENINgN➢BENIFAPPEIEDPAWAY THAT O4FARAMESME WSiRUCRONS W NMNFOLNPERDSTPLAipN MWUNb.
P-112857
G
W
co
Cl
c
LU
`FcF
LU
W
W
m
>*_
L
U
�
Q
W
Z
E:
CID
Cn
W
O
of
CD
ngineering by:
John L Alger, P.E.
_ic # 74730
certificate of
Authorization with:
The LeverEdge
Certificate #
31930
SINGLE -LINE DIAGRAM
PROJECT ID: 112857
DATE: 05/02119
,.CREATED BY: JA.
CHECKED BY:
f - REVISIONS
PV-3
SW7 -DISCONNECT r - 112857
EATON DG222NRB O SEE NOTE N 4 (SW1) POINT -OF -INTERCONNECTION OR AT MAIN SERVICE DISCONNECT (MSP)
0000 tcAura
' • • • ! '• • PO'WERTO-#SSUtLD1NG IS..LSf1FROMR00.R30UNTED80LARRSRAYSWiTYiSAFETYDfSCONNECTS
MSP - MAIN SERVICE PANELITH . , . ! • AS5114WN
OO NEC690.56(C) AND IF T5.N.1 N „ '
OANY AC ELECTRICAL PANEL THAT IS FED BY LLI
BOTH THE UTILITY AND THE PHOTOVOLTAIC I--'
SYSTEM (SW7, MSP) - � CV
?j LL
UJI
> J
NEC 705.12(D)(3) I+ i� t"+E' i� � ^�ff.... Z LU
4O AC DISCONNECT (SWi) LLI
a-
00 C/) (—
MAXIMUM AC OPERATING CURRENT: 37.0A - , ` :;. ':, 0 Mp 0
MAXIMUM AC OPERATING VOLTAGE: 240V "' ,-, `._� � LLJ CV
I`
LL
NEC 690.54 NEC 690.56(B)
OAC SOLAR DISCONNECT(SWI) Engineering by:
John L Alger, P.E.
Lic # 74730
PHOTOVOLTAIC AC DISCONNECT Certificate of
Authorization with:
NEC 690.13(B) - The LeverEdge
Certificate #
31930
SAFETY LABELS
DOC ID:112857-141718.1
= DATE:5/2119
'.CREATOR: J.A.
REVIEWER:
REVISIONS
PV-4
LABELING NOTES
1
ALL PLAQUES AND SIGNAGE REQUIRED BY 2014 NEC
AND 2015 NFPA 1 WILL BE INSTALLED AS REQUIRED.
LABELS, WARNINGS AND MARKING SHALL COMPLY
WITH ANSI Z535.4, W�ICH REQUIRES THAT DANGER,
WARNING, AND CAUTION SIGNS USED THE STANDARD
2
HEADER COLORS, HEADER TEXT, AND SAFETY ALERT
SYMBOL ON EACH LABEL THE ANSI STANDARD
REQUIRES A HEADING THAT IS AT LEAST 50%TALLER
THAN THE BODY TEXT, IN ACCORDANCE WITH NEC
110.21(B).
A PERMANENT PLAQUE OR DIRECTORY SHALL BE
3
INSTA
ROOF PROPERTIES
P-11285700
Q
RIDGE
W
RIDGE
co
y
CV
6')
W M
3:
> LL.
O
E
LL
Q
���
Of
go
25 Q
LU
z
a
C/i H
M W
w
N O
F-
ti
SAVE
Modules installed only in roof zones 1 and
Engineering by:
2 WIND ZONE I
❑
WIND ZONE II WIND ZONE III
❑ ❑
John L Alger, P.E.
Lic # 74730
Certificate of
Authorization with:
1 ATTACHMENT PLAN ORTHOGONAL PROJECTION
The LeverEdge
V5.1 SCALE:1/80 =1'
Certificate #
31930
ATTACHMENT
PLAN
DOG ID,112857-141718-1
DATE, 512119
CREATOR: J.A.
"REVIEWER:
REVISIONS
PV-5.1
ROOF MATERIAL
TRAPEZOIDAL METAL (5-71N)
SLOPE
3112 (14.0°)
MEAN ROOF HEIGHT
22.8FT
DECKSHEATHING
7/16'ORTHICKEROSBORPLYWOOD
CONSTRUCTION
TRUSSES (4X10TQP-CHORD), 241N
OC
MODULE MECHANICAL PROPERTIES
MODEL
MISSION SOLAR MSE310S08T
DIMENSIONS (AREA)
65.51N X 39.31N X 7.SIN (17.9 SO FT)
WEIGHT
40.1L8
MOUNTING SYSTEM PROPERTIES
MAX MOUNT SPACING
48.OIN (ZONES 1, 2, AND 3)
MAX. ALLOW.
CANTILEVER
15.BIN (ZONES 1, 2, AND 3)
GROUNDING AND
BONDING
TIN-PLATED, SOLID COPPER LAY -IN
LUGS LISTED UNDER UL 2703
NOTES
TRUSS LOCATIONS ARE APPROXIMATE. ACTUAL
1
LOCATIONS MAY DIFFER AND CONTRACTOR MAY NEED
TO ADJUST MOUNT LOCATIONS. IN NO CASE SHALL THE
MOUNT SPACING EXCEED'MAX MOUNT SPACING'
Q
RIDGE
tiQ
w LLl
}
m
,P L11 M
Uj > LL
EAVE x O
�" Q U
SAVE IY
p z a
WIND ZONE I WIND ZONE II WIND ZONE III m
NOTES Lu N O
TRUSS LOCATIONS ARE APPROXIMATE. ACTUAL F ~
1 LOCATIONS MAY DIFFER AND CONTRACTOR MAY NEED 0
TO ADJUST MOUNT LOCATIONS. IN NO CASE SHALL THE 1 ATTACHMENT PLAN ORTHOGONAL PROJECTION
MOUNT SPACING EXCEED'MAX MOUNT SPACING' fY
V5. SCALE: 3116° =1' 0
Modules only installed in roof zones 1 and 2 Engineering by:
John L Alger, P.E.
Lic # 74730
Certificate of
Authorization with:
The LeverEdge
Certificate #
31930
ATTACHMENT
PLAN
DOC 10:112857-141718-1
`F DATE: 512119
t:QVEATOR:J.A.
REVISIONS
J�
Wjz
3
r
�r
ROOF PROPERTIES P-112857
ROOF MATERIA00
IX
L
TRAPEZOIDAL METAL (5-71N)
SLOPE
3/12 (14.0°)
MEAN ROOF HEIGHT
21.fiFT
DECK SHEATHING
7/i6'ORTHICKEROSBORPLYWOOD
CONSTRUCTION
TRUSSES (4X70 TOP -CHORD), 241N
OC
MODULE MECHANICAL PROPERTIES
MODEL
MISSION SOLAR MSE310508T
DIMENSIONS (AREA)
65.SIN X39.31N X1.61N (17.9 SO FT)
WEIGHT
40.1LB
MOUNTING SYSTEM PROPERTIES
MAX MOUNT SPACING
48.OIN (ZONES 1, 2, AND 3)
MAX' ALLOW.
CANTILEVER
15.BIN (ZONES 1, 2, AND 3j
GROUNDING AND
BONDING
TIN-PLATED, SOLID COPPER LAY -IN
LUGS LISTED UNDER UL 2703
SNAPnRACK Series 100 (5V roof)
For attachment Into truss or rafter
Deck mounting Bracket (5V Roof) t
(when attachment to truss is not possible
For use in 5/S" thick minimum Plywood
Uses 4gty k14 x V' SSlag screws
Use Chem-Loc M1 sealer under bracket to seal against panel
Pull off rated to 93 psf with 1.5 SF
)tes on Fiashings and Atlactimems;
1 Contmctor is responsible for compliance with any and
all local and Worst codes and equipment installation
Instructions.
2 FIV modules are mounted to aluminum racking
components and tells and attached to the roof using
Quick Mount PV ➢ashings or other ➢ashinga and
attachments approved by racking manufacturer as
appropriate to the Installation.
3 Maximum span between attachments to be 46" or less.
For the attachments on the ends of the retie oath side,
the span can not exceed manufacturer's
reoommendations.
4 Contractor Is responsible for ensuring watertight
penetrations and for seating, trimming, cutting roof
shingles and membranes in a neat, professional, and
t) Using roof attachment locations
drawn during system layout, drill
a pilot hall through the roaring
material.rto the roof homing
43 Attach L Foot to stud In Metal
Roof Base cap.
rwm.a
sx
2) Attach the base with sliv, lag
screw (or W selr-dalM'ng screw),
drive lag screw for rnlnitnum 25'
embMmont Into the roof fd 'me
member.
3) Tlraed Metal Rcof Base
Metal Roof Base bottom,,
red IS fully seated to base.
Nate: Protest is limited to 40psf when used with
an equal number o1 PV dips in a 24 ga steel roof.
See LeverEd a En ineedn for hl h r u Aft l ci
�prm .va. ,y i•. 9 9 g a p oa .
ea
�...
vfr
S-SU and Min] ' Protest
STANDING SEAM TRAPEZOIDAL
Metal roofs are made by several manufacturers using several different styles from standing
seam to 5V and others. S-5f makes clips for each particular roof style, It Is the contractors;
responsibility to determine the particular brand and model of roof and select the proper 8-5
clip for their particular Installation. Check the S-51 web site at www.s-E.com. Installers can
access the tools and procedures for proper installation of the clips at www.s-S.com tools.
Proper Installation Is critical to achieve the rated pug and slide off values listed.
s
METAL HOOF ATTACHMENTS
ss2saieesiymws.
t�roa,ssosose
maieveredge
1423 Gan Highway CMifiW tam ofAmdralonY:
.. Otleasq FL 7Jas8 3f$30
�Bt}i0361g0
RBN taaa.ae�
oennnroore.
,ev w.-
lam
'
:.. :_ ..
sac e ra
� ...
8-0p1
,..
pr
( f
1 r� �rl��tr ;r ..r•
P-112857
LL CN
Ca DO
LU co
W co
7 -j
Q �
O W
Z �
W
M LL'
o O
CA Lj—
ti
ATTACHMENT
' PV-6
CERTIFIED RELIABILITY
, Tested to 3X IEC Standards
SUPERIOR AESTHETICS
)All -black design coupled with outstanding power output
) Ideal for residential & commercial applications
EXTREME WEATHER RESILIENCE
) 5600 Pa snow load (117 psf)
) 175 mph wind rating
BAA COMPLIANT FOR GOVERNMENT PROJECTS
Buy American Act
> American Recovery & Reinvestment Act
•Anthem are diferom cedmcation reolrements in dfferent bare , please oontzRymv local
Mission Solar Energy sales representall for the spedfic cemimstes applicable to the products In
the region inwhirh the pmductsareto be used.
MISSION SOLAR
ENERGY
This Module
PERC 60
ELECTRICAL SPECIFICAf IONS
Electrical Parameters at standard Test Conditions (STC)
res
�Modul�� .Type... _ _
Power Output
_
Pmax
Wp
MSE300SQ8T
300
_ MSE3055QBf
305
MSE3105QBT,
310
IModule Efficiency
%
18.05
18.35
18.65 9
Tolerance
0-+3%
0'+3%
0"+3%
Short -Circuit Current
Ise
A
9.571
9.664 m
9.760_
Open ClmultVoltage
Voc
V
40.08
40.10
40.12
Rated Current
Imp
A
9.058
9.202
9.345
Rated Voltage
Vmp
V
33.12
33.14
33.17
Fuse Rating
35
20
20
•
Normal Operating Cell Temperature(NOCT) 44-C(t2'C)
Temperature Coefficient of Pmax -0.427%/°C
Temperature Coefficient of Voc -0.318%/°C
Temperature Coefficient of Ise 0.042%/°C
Maximum System Voltage
I,000VDC
Operating Temperature Range
-40°C(40°F)to+90°C(194°F)
Maximum Series Fuse Rating
20A _
Rre Safety Classification
Type 1, Class C
Front& Back Load (UL standard)
5600 Pa(117 psf)
Hall Safety lmpactVeloclty
25mm at 23 m/s
Solarcells
P-type Mono -crystalline Silicon (156.75mm)
Cell orientation
60 cells (6x10), 5 busbar
Module dimension
1664mmx999mmx40mm
(65.51 In. x 39.33 in. x 1.57In.)
Weight
18.2 kg(40.11N
Front Glass
t
Frame
32mm(0.126 in.) tempered,
Low_Irpn,.Anti_reflectiv-ecoating
Anodized aluminum alloy
Encapsulant
Ethylene vinyl acetate(EVA)
J-Box
Protection class IP67 with 3 bypass -diodes
Cables
PVwire, im(39.37 in.), 4mm2/12 AWG
Connector
MC4 or compatible
all] IN •
Container FT
Pallets
Panels
305IN
53'
Double stack
36
936
285.48 kW
q0'
Double stack
28
728
222.04 kW _
Panels
Weight
Height
Width Length
Pallet
26 _
1,1601bs
45.15'
45.00" 66.00
Mission Solar Energy reserve the right to make specificaeen changes without nonce
a
0
CLASS LEADING 300-31OW
CERTIFICATIONS & TESTS
IEC
61215 / 61730 161701, Salt mist —1
UL _
UL 1703 listed
b�°' g„b CEC
MSE310SQBT: 310WP, 60CELL SOLAR MODULE
CURRENT -VOLTAGE CURVE
a to
Voltage M
Current -voltage characteristics with dependence on irradlance
and module temperature
BASIC DESIGN (UNITS: ram)
Front View
BackVlew
MISSION SOL/%R
ENERGY
Mission Solar Energy 19303 S. New Braunfels Ave., San Antonio. Tevas 76235
inlo@missiansolaemm l www.misslonsolaccom
Date Sheet
Enphase Microinverters
Region: AMERICAS
Enphase
IQ 7 and IQ 7+
Microinverters
UL
To learn more about Enphase offerings, visit enphase.com
The high-powered smart grid -ready
Enphase IQ 7 Micro- and Enphase IQ 7+ Microu'
dramatically simplify the installation process while
achieving the highest system efficiency.
Part of the Enphase IQ System, the IQ 7 and
IQ 7+ Microinverters integrate with the Enphase
IQ Envoy'", Enphase IQ Battery-, and the Enphase
Enlighten- monitoring and analysis software.
IQ Series Microinverters extend the reliability
standards set forth by previous generations and
undergo over a million hours of power -on testing,
enabling Enphase to provide an industry -leading
warranty of up to 25 years.
Easy to Install
Lightweight and simple
Faster installation with improved, lighter two -wire cabling
Built-in rapid shutdown compliant (NEC 2014 & 2017)
Productive and Reliable
Optimized for high powered 60-cell and 72-cell* modules
More than a million hours of testing
Class II double -insulated enclosure
UL listed
Smart Grid Ready
Complies with advanced grid support, voltage and
frequency ride -through requirements
Remotely updates to respond to changing
grid requirements
Configurable for varying grid profiles
Meets CA Rule 21 (UL 1741-SA)
-The IQ 7. Micro is required to support 72-cell modules.
ENPHASE.
This inverter
Enphase IQ 7 and IQ 7+ Microinverters
INPUT DATA (DC)
I117-60-2-US / IQ7-60-B-US
IQ7PLUS-72-2-US / IQ7PLUS-72-6-US
I Commonly used module pairings' - _
235 W-350 W+.
235W-440W+
Module compatibility
50-cell PV modules only
60-cell and 72-call PV modules
Maximum' input DCvbing_e
48V
Peak power tracking voltage
27V-37V
27V-45V
Operating range
16V-46V _
16V-60V
Min/Max start voltage
22V/48V
22 V 160V
Max DCshortcircuiicurrent(module ls'c)
15A
15A
overvoltage class DC port
11
It
DCportbackfeedcurrent
OA
OA
PV array configuration
1 x 1 ungrounded array; No additic
AC side protection requires max
ial DC side protection required;
IA per branch circuit
OUTPUT DATA (AC)
IQ 7 Microlnverter
IQ 7+ Microinverter
Peak output power
250 VA
295VA
Maximum continuous output power
240 VA
290 VA
1 Nominal (L,L) voltage/range'
0 V / 208 V/
24211-264 V 183-229 V
24o V / 208V/
211-264 V 163-229 V
Maximum continuous output current
1.0 A(240 V) 1.15A(208 V)
1.21 A(240 V) 1.39 A(208 V)
Nominal frequency
60 Hz
60 Hz
Extended frequency range
47-68 Hz
47-68 Hz
EE.-gortcircuit fa`uli current over3 cycles
5.8 Arms
- 5.8 Arms
Maximum units per 20 A (L-L) branch circuit'
16 (240 VAC) 13 (208 VAC)
13 (240 VAC) 11 (208 VAC)
Overvoltage class AC port
III
AC port backfeed current
0 A
0 A
Power factor setting
1.0
10
Power factor (adjustable)
0.85 leading ..: 0.85 lagging
0.85 leading... 0.85 lagging
EFFICIENCY
@240 V @208 V
@240 V @208 V
I Peak efficiency -
97.6 % 976 %
975 % 97.3 %
CEC weighted efficiency
97.0 % 9Z0 %
97.0 % 97.0 %
MECHANICALDATA
PV2 to UTX: order ECA-S20-S25
rPollutiondegree PD3 _ I
Enclosure Class II double -Insulated, corrosion resistant polymeric enclosure
Environmental category/W exposure rating NEMA Type6/outdoor
FEATURES
.Monitoring Enlighten Manager ano Nlycnugmen monitoring options.
Bnth notions reouire installation of an Enphase 10 Envoy.
disconnect required by NEC 690.
EEEI547, FCC Part 15 Class B, ICES-0003 Class B,
107.1-01
;red as PV Rapid Shut Down Equipment and conforms with NEC-2014 and
0.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC
,hen installed accordina manufacturer's instructions.
1. No enforced DC/AC ratio. See the compatibility calculator at hne=uno�ha= gom/nas/suppo,umndule-oo oatihllity.
2. Nominal voltage range can be extended beyond nominal if required by the utility.
3. Limits may vary. Refer to local requirement. to define the number of microinverters per branch In your area.
To learn more about Enphase offerings, visit enphase.com v EN P HAS E.
0201 a Enphase Energy. Al rights reserved. All trademarks or brands used are the property of Enphase Energy. Inc.
2018-11-19
SM 1 ►' 1 ®SOLARMOUNT :e°UNIRAC
A HILTI GROUP GOPIPA W
OPTIMIZED COMPONENTS
INTEGRATED BONDING & PRE -ASSEMBLED PARTS
Components are pre -assembled and optimized to reduce installation steps and save labor time. Our
newgroundeg & herring process allocates copper vine and grounangstapsorhondinglumpersto
reduce costs Utilize the alcmnlvertermount with aline management clip loran easier grstallatilm.
VERSATILITY
ONE PRODUCT - MANY APPLICATIONS
Qpicklyset modules Hirsh to the tool Brat desired tilt angle. Change module orientation to portrail no
landscape whilmcuring a Ialge vadelyof [famed modules on flat, liev sloped or ceep pitched roots.
Available in mill; clear and dark anodized finishes to otdperformyour projects financial and aesfhelic
aspirations:
AUTOMATED DESIGN TOOL
DESIGN PLATFORM AT YOUR SERVICE
Creating bill of materials is just low clicks array with U-Builder, a powerful online toolthat
streamlines the process ofdesigning a code comphanl solar mounting system Save time by
creafilig a user Enable, and recall preferences and for ejects automatically when you log in. You
MIT enjoy the ability to share prolecUrwlth customers: there's no need to printresNl[ssand send
to a distr hntor. just click and share.
N o UL2 / O3MQCTANIAL SYSTEM FIRE COLASSIFICATIQN
INTEGRATED BONDING
SPLICE BAR
INTEGRATED BONDING
MICROINVERTER MOUNT w/
WIRE MANAGEMENT
INTEGRATED BONDING
MIOCLAMP
INTEGRATED BONDING
L-FOOT wl T-BOLT
J } UNIRAC CUSTOMER SERVICE MEANS THE HIGHEST LEVEL OF PRODUCT SUPPORT
_err
ON14ATCHED CERTIFIED [NGINFFRINC BANKABLE RESIGNRon PERldli
EXPERIENCE QUALITY EXCELLENCE WARRANTY Tools -0oCUAIENTA(IDN
GET OFF THE ROOF FASTER THAN EVER BEFORE
TECHNICAL SUPPORT
Cause's technical support team is dedicated to answering
questions & addressing Issues in real time. Ail online
library of documents .including engineering reports.
.stamped letlem and technical data sheets gleally
slmplities your permitting and project plaepng. process.
CERTIFIED QUALITY PROVIDER
Unime is Ilia only PV mounting vendor w1h ISO cont iicahons
for 9001.,2008, 14001-2004 and UNSAS 18001:2007,:
which means we deliver the Ifighesl standards for fit.:
form, and function These certifications demonstrate our
excelloncoand eenrmtmem to Msl class business practice&
BANKABLE WARRANTY
As a Ifild Group Company, Duane has the financial strength
to back our products and reduce your risk [lave peace al
mind own,"ung you are receiving products of exceptional
reality. SOLARMOUNT Is covered by a 10 year limited
Virtual warranty and a 5 year burned finish warranty,
OPTIMIZED COMPONENTS • VERSATILITY • DESIGN TOOLS • QUALITY PROVIDER I PROTECT YOUR REPUTATION WITH QUALITY RACKING SOLUTIONS BACKED BY ENGINEERING EXCELLENCE AND A SUPERIOR SUPPLY CHAIN
'AE
January 10, 2018 structural
ENGINEERS
UniRac
1411 Broadway Boulevard NE
Albuquerque, New Mexico 87102-1545
TEL: (505) 242-6411
FAX: (505) 242-6412
Attn.: Engineering Department,
Re: Engineering Certification for UniRaes SolarMount Design & Engineering Guide
PZSE, Inc. -Structural Engineers has reviewed UniRaes "SolarMount Design & Engineering Guide" and
specifically the enhancements of the SolarMount Flush -to -Roof System, Pressure Lookup Tables, and
Downward & Upward Span Length Tables.
This certification excludes connections to building structures and the effects on building structure
components. All information, data and analysis contained within the Installation Manual are based on,
and comply with the following:
1. 2015 International Building Code, by International Code Council, Inc., 2015
2. 2017 Florida Building Code 61h Edition. Florida Building Commission, 2017
3. ASCE/SEI 7-30 Minimum Design Loads for Buildings and other Structures
4. 2015 Aluminum Design Manual. by The Aluminum Association, 2015
This letter certifies that the structural calculations contained within UniRaes "SolarMount Design &
Engineering Guide" are in compliance with the above Codes.
If you have any questions on the above, donot hesitate to call.
Prepared By:
PZSE, Inc. —Structural Engineers
Roseville, CA
PAUL K. ZACHER, PE USING A SHA-1 AUTHENTICATION
ED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED
D AND SEALED AND THE SHA-1 AUTHENTICATION CODE
BE VERIFIED ON ANY ELECTRONIC COPIES.
1478 Stone Point Driye, Suite.190; ,Roseville, CA 95661
t 916.961.3960 916.961.3965 W; w.ww.pzse.com
Efip'erience II l6tegrity. I FMpawemn nt
IINo.73522
01110/2018
MAY 0 7 2019
.]Ing