Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
TERMITE TREATMENT CERTIFICATES
N1- . Planning & Development Services Building & Code Regulation Division 0 2300 Virginia Ave ° Fort Pierce, FL'34982 SCANNED 772-462-2172 Fax 772-462-6443 BY CERT-IFIOATE-OF TERMITE TREATMENT Lucie County CONSTRUCTION SOIL TREATMENT PERMIT #: i q05 - 0191 JOB ADDRESS: _ 333 BUIILDER/CONTRACTOR:: Ali , r l o&,6 _ PEST CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: < 20 Percentage of solution:.05% Date of Treatment: g Q / z_Foot/in�, �l Treatment Re -Treat Driveway Chemicals used: DOMINION 2L Total gallons used: .52 Time of Treatment: `i ,. 0 0� __ff Slab 1't Treatment Re -Treat Pools 1't Treatment 1't Treatment Re -Treat Re -Treat Other Perimeter for Final Inspection 1st Treatment Re -Treat Si t of Exterminator Date Note. There must be a completed form for each requ reabment or re-treadnentand this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection w111 fail and a re -inspection fee charged FBC104.2.6 Certificate of Protective Treabnent for prevention of temiites. A weather resistantjobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the beatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel'box cover, listing all the treatments and dates of applications. Revised PERMIT # Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATM CONSTRUCTION SOIL TREATMENT — 0 /9) JOB ADDRESS: BUILDER/CONTRACTOR: e Sc o Cw-.<+r,&c4, PEST CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 NOV 13 2019 Permitting Department _St_Lucie County Fi BY St Lucie Counje We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. L.Y'A -Squaw feet if area treated: 3 7 2 Chemicals used: DOMINION 2L Percentage of solution:.05% Date of Treatment: It III Footing 1't Treatment Re -Treat Driveway 1' Treatment Re -Treat Other 1't Treatment Re -Treat Total gallons used: /L/O Time of Treatment: �s . ti O Slab 15t Treatment Re -Treat Pools 1st Treatment Re -Treat erimeter for Final Inspection Signature df Exterminato Date Note. There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistantjobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CID, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014 • Termite Inspection • Termite Pretreatment -,Pest-Control • Rodent Service • Fire Ant Lawn Service • Whitefly Treatment • Licensed & Insured Lic. JB175775 72-323-7921 Toll FORD. 1-911-395-9999 18x:112-349-5999 Email: Evictabug@gm�1!_Corn.—,.--__, 4293 SW High Meadows Ave. Palm City, FL 34990 Notice of Preventative Treatment for Termites (as required by -Florida -Building Code (FBC) 104.2.6, 105.10 & R318.1 and Broward County Chapter FBC 105..2.2))-ll- PEST PREVENTION I FIRE ANT SERVICE I(� TERMITE SERVICE I RODENT EXCLUSION & REMOVAL I Wk�lyJ• D DATE OF SERVICE ///// /) !ATIME iT . O BY DEVELOPMENT NAME (PROJECT) CONTRACTOR'S NAME CONTACT PERSON `CC.rro11 IT,fc tCC�sco (1„ns {r�1c 7 ,,C '1-)d.-Q(rS- �Z3( STRUCTURE ADDRESS(LOT/BLOCK) CITY, STATE COUNTY 33 l�zgi qAJE {orkr ,-krcq_ .FL i . L/UC¢r�Q NOTEII I l US ©� 1 � 'T ° IJ �t �. Z_ 1 IP E1 U �— � f ✓Vt�li � � ❑ FLOATING ❑ MONOLITHIC ❑ PATIO ❑ GARAGE ❑ DRIVEWAY ❑ STEM WALLIFOOTERS ❑ ADDITION ❑ CUTOUTS ❑ FOOTER ❑ FRONT ENTRY ❑ RETREAT ❑ BORA CARE TREATMENT ❑ PLUMBING CUTOUTS ❑ SIDEWALKS ❑ TAMP & TREAT WREAT ONLY 6FINAL ❑ POOL DECK ❑ OTHER PRODUCTS ❑ BASELINE &DOMINION 2LACTIVE INGREDIENT ❑ TERMIDOR SC ❑ BORACARE ❑ PREMISE ❑ TALSTAR ❑ OTHER ACTIVE INGREDIENT 91MIDACLAPRID O BIFENTHRIN ❑ DISODIUM OCTABORATE TETRAHYDRATE CONCENTRATION_ ❑ .06% ❑ .1% ❑ .12% ❑ .25% 045% ❑ 23% ❑ 9% ❑ OTHER GALLONSAPPLIED t H O Z O SQUARE FOOTAGE LINEAR FOOTAGE 01 YES ❑ NO 0,MEASURED OR VERIFIED PER PLANS JOB READY CONDITIONS MET RYES ❑ NO "Certificate of Compliance" As per 104.2.6,105.10 & R318.1 FBC - If soil chemical barrier method for termite prevention is used. Final exterior treatment shall be completed prior to final building approval. Certificate of Compliance: The building has received a complete treatment for the prevention of subterranean termites. Treatment is in accordance with rules and laws established by the Florida Department of Agriculture and Consumer Services. (Per the Florida Building Code.) If this notice is for the final exterior treatment, initial and date this line 6-r 11 t t 11!� G)o 5,4— FINAL STICKER N{ELECTRICAL PANEL El WATER HEATER Payment Terms: Payment due at time of service. )l V) Date lk�idll Dale II N Applicator: (Evict A Bug Termite and Past Control, Inc.) ov, Srtz Customer (Property Owner or Agent) www.evictabugpestcontrol.com Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE -OF -TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT SCANNED PERMIT #: 1PDb ' 61JOB ADDRESS BUILDER/CONTRACTOR: �.7SV �-�e county PEST CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: �_ Percentage of solution:.05% Date of Treatment: 2018 �- Footing 1t Treatment Re -Treat Driveway 1st Treatment Re -Treat Other 1s` Treatment Re -Treat Chemicals used: DOMINION 2L Total gallons used: Z5-tn Time of Treatment: -Lm(D S�-1st Treatment Re -Treat Pools 11t Treatment Re -Treat xxxxx Perimeter for Final Inspection PAUL C LUGARA JR � MIU.1&1141m0�"�""'" Signature of Exterminator _ Date Note. There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fall and a re -inspection fee charged. FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistantjobsite posting board shall be provided to receive duplicate Treatnent Certificates as each required protective treatment is completed, providing a copy for the person the permit /s issued to and another copy for the building permit files. The Treatment Certificate shalt provide the product used, identty of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014