Loading...
HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATESt Lucie County Inspections 2300 Virginia Avenue Ft Pierce, FL 34982 SCANNED (772) 462-2172 BY St. Lucie County CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #Jl HIT i7 �i 7'(D JOB ADDRESS 7o 1 -5tz lo'l�n. U .-P, E, Ft - BUILDER PEST CONTROL CONTRACTOR TElyt-a C-ELIi V1,aAA*eHF1JT PEST CONTROL LICENSE # Q !3 `P5 2 T We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: Percentage of solution: O S%d z7 Date.of treatment: ❑ Footing ❑ 1st Treatment ❑ Re -treat ❑ Slab ❑ 1st Treatment ❑ Re -treat ❑ Driveway ❑ 1st Treatment ❑ Re -treat ❑ Pools ❑ 1st Treatment ❑ Re -treat Other ❑ 1st Treatment ❑ Re -treat Chemicals used: M t 5 t3 Total gallons used: gGoz Time ofTreatment: FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copyfor the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, ftnal exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. ❑ Perimeter for Final Inspection Signature of exterminator NOTE: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged Revised 6II3102 dmg